Office with commercial, 1-6 stories
78 KINGSLAND AVENUE
BROOKLYN · East Williamsburg · BIN 3070023
💬 Discuss this project
1940Year Built
3Stories
O5Building Class
M1-1Zoning
22,948 sfGross Floor Area
8Units
Rent Stabilized20 Open Violations 18 unresolved · 2 paperwork only ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: DUO OCEAN PARKWAY LLC · 19,940 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction23p · 3 filings · 20 docs
Floor 3Under Construction10p · 1 filing · 8 docs
Floor 2Under Construction9p · 1 filing · 8 docs
Floor 1Under Construction34p · 4 filings · 20 docs
CellarUnder Construction28p · 3 filings · 20 docs
Site & exterior4p · 1 filing · 3 docs
Filed — no permit issued2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRUMAN REALTY1007/08/2026
MNK ENTERPRISES NY407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2016$12.5M—— → —$546/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group803/21/2026
PAKNIA ENGINEERING & ARCHITECTURE,203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
METFLOW FIRE CONTROL LLCFire Protection607/08/2026
COUNTYWIDE BUILDERS INCGeneral Contractor507/08/2026
CREATIVE PLUMBING INPlumbing407/08/2026
WEBER, MAYERElectrical203/21/2026
MAYER WEBERElectrical203/21/2026
BUA, JAMESElectrical103/21/2026
NORMAN TCHERNOFFElectrical103/21/2026
JUAN RAMIREZElectrical103/21/2026
MNK ENTERPRISES NY INCGeneral Contractor107/08/2026
ENDRULAT, EDMUNDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161007/14/2026
METRO FIRE CONTROL LLC4538112/31/2019
Building Lifecycle
All (170)Filed (13)Permit Issued (16)Signed Off (1)Violation (55)Inspection (15)Objection (40)Special Inspection (30)
09/02/2026
Objection resolved — Resolved
08/24/2026
Objection raised — Scope
08/24/2026
Objection raised — Scope
08/24/2026
Objection raised — Scope
07/17/2026
Objection raised — Other
07/14/2026
Filed — Alteration
REFRAMING OF EXISTING ROOF AND INTERIOR RENOVATION IN CONJUNCTION WITH ALT 1 322033615 .
B01123989-P1
07/14/2026
Objection resolved — Addressed
07/13/2026
Objection resolved — Addressed
07/13/2026
Objection resolved — Addressed
07/13/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Other
06/22/2026
Objection raised — Scope
06/22/2026
Objection raised — Cost
06/22/2026
Objection raised — Structural
06/22/2026
Objection raised — Inspections
06/16/2026
Objection raised — Other
06/16/2026
Objection raised — Other
06/12/2026
Objection resolved — Addressed
06/10/2026
Objection raised — Fire_Protection
06/10/2026
Objection raised — Mechanical
06/08/2026
Filed — Alteration
PL & SP filed in conjunction with Alt 1 Job Number 322033615.
B00744935-P1
06/04/2026
Filed — Alteration
INSTALLATION OF 3 TOILET EXHAUST FANS FOR BATHROOMS ON 1ST FL. DWELLING UNIT. JOB FILED IN CONJUNCTION WITH ALT-1 UNDER DOB JOB #: 322033615
B08034733-P1
05/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/19/2026
Special inspection requirement — Final
FAHAD FATEH
05/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/19/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/19/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2026
Permit issued — Mechanical Systems
B08034733-I1-MS
03/17/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/24/2026
Permit issued — Structural
B01123989-I1-ST
02/10/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/05/2026
Permit issued — Standpipe
B01061762-S2-EW-SD
02/05/2026
Permit issued — Standpipe
B01061762-S2-EW-SP
02/04/2026
Permit issued — Plumbing
B01061762-S1-PL
01/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/09/2026
Permit issued — Sprinklers
B00744935-I1-PL
01/07/2026
Permit issued — Sprinklers
B00744935-I1-EW-SP
12/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2025
Violation issued (FDNY_NOV, closed)
10/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/08/2025
Permit issued — Structural
B01123989-I1-ST
05/12/2025
Violation issued (FDNY_NOV, closed)
02/12/2025
Permit issued — Standpipe
B01061762-S2-EW-SP
02/12/2025
Permit issued — Standpipe
B01061762-S2-EW-SD
02/12/2025
Permit issued — Mechanical Systems
B01061762-I1-MS
02/12/2025
Permit issued — Plumbing
B01061762-S1-PL
01/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAHAD FATEH
01/31/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/31/2025
Special inspection requirement — Final
FAHAD FATEH
01/31/2025
Special inspection requirement — Shutoff dampers
FAHAD FATEH
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCOUNTYWIDE BUILDERS INC03/27/2026
DOB NOWStructuralPermit IssuedCOUNTYWIDE BUILDERS INC02/24/2026
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC02/05/2026
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC02/05/2026
DOB NOWPlumbingPermit IssuedAB PLUMBING INC02/04/2026
DOB NOWSprinklersPermit IssuedAB PLUMBING INC01/09/2026
DOB NOWSprinklersPermit IssuedMETFLOW FIRE CONTROL LLC01/07/2026
DOB NOWStructuralPermit IssuedCOUNTYWIDE BUILDERS INC09/08/2025
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC02/12/2025
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC02/12/2025
DOB NOWMechanical SystemsPermit IssuedCOUNTYWIDE BUILDERS INC02/12/2025
DOB NOWPlumbingPermit IssuedAB PLUMBING INC02/12/2025
DOB NOWPlumbingPermit IssuedMETFLOW FIRE CONTROL LLC01/10/2025
DOB NOWMechanical SystemsPermit IssuedCOUNTYWIDE BUILDERS INC01/10/2025
DOB NOWSprinklersPermit IssuedAB PLUMBING INC01/09/2025
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES NY INC07/20/2023
BIS—ISSUEDCOUNTYWIDE BUILDERS INC06/10/2025
BIS—ISSUEDCOUNTYWIDE BUILDERS INC01/09/2025
BISOTISSUEDINTEMETRIC CONSTRUCTION05/14/2020
BISOTISSUEDINTEMETRIC CONSTRUCTION06/26/2019
BISOTISSUEDMETRO FUEL OIL CORP11/13/2003
BISPLISSUEDNONE11/02/1994
BIS—ISSUEDRICKY AND B CONSTR09/21/1992
2 projects · most recent 06/04/2026
Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026Permit IssuedCOUNTYWIDE BUILDERS INCVentilation Systems—
12/03/2024Permit IssuedCOUNTYWIDE BUILDERS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin DHSA035 14,000 CFM · Rooftop Unit ×4
RXL12WMVJU9 10,600 BTU · Heat Pump Outdoor ×4
RXYQ96TATJU 92,000 BTU · Vrf Outdoor ×4
DCG240 7,000 CFM · Rooftop Unit ×2
DHSH258 8,000 CFM · Rooftop Unit ×2
RXYQ120XATJA 120,000 BTU · Vrf Outdoor ×2
RXYQ72TATJU 69,000 BTU · Vrf Outdoor ×2
Ventilation
Greenheck SQ-097-VG 225 CFM · Exhaust Fan ×4
AX-72-190-0618-A50 9,680 CFM · Exhaust Fan ×2
CSP-A200 75 CFM · Exhaust Fan ×2
CSP-A250 75 CFM · Exhaust Fan ×2
G-097-VG 100 CFM · Exhaust Fan ×2
G-099-VG 800 CFM · Exhaust Fan ×2
Daikin VAM600GVJU 600 CFM · Erv ×4
2 projects · most recent 06/08/2026
FiledStatusContractorScope
06/08/2026Permit IssuedMETFLOW FIRE CONTROL LLC—
12/03/2024Permit IssuedMETFLOW FIRE CONTROL LLC353 heads, 1 outlets
2 projects · most recent 06/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/08/2026Permit IssuedMETFLOW MECHANICAL LLCGas, Water/Sanitary
12/03/2024Permit IssuedMETFLOW MECHANICAL LLCWater/Sanitary
7 projects · most recent 05/19/2026
General Wiring Lighting
FiledStatusContractorScope
05/19/2026Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
10/20/2025Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
06/24/2025CompleteDENALI ELECTRIC CORP—
12/20/2024Permit IssuedCOUNTY ELECL CONTRACTOR IGeneral Wiring
07/20/2023Permit IssuedRICHARD NEU—
09/28/2020Permit IssuedUP TOWN ELECTRIC INCGeneral Wiring, Lighting
12/06/2019Permit IssuedMAN POWER ELECTRIC INCGeneral Wiring
1 project · most recent 07/14/2026
Steel Concrete
FiledStatusContractorScope
07/14/2026Permit IssuedCOUNTYWIDE BUILDERS INCSteel, Concrete
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/28/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/23/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
05/19/2026FinalFAHAD FATEHprogress
05/19/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/19/2026Mechanical SystemsFAHAD FATEHspecial
05/19/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/31/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/31/2025Mechanical SystemsFAHAD FATEHspecial
01/31/2025FinalFAHAD FATEHprogress
01/31/2025Shutoff dampersFAHAD FATEHenergy_progress
01/31/2025Maintenance informationFAHAD FATEHenergy_progress
01/31/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/31/2025Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
01/31/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/31/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/31/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/31/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/31/2025Exhaust and Vent Systems in Plenums and DuctsFAHAD FATEHspecial
01/31/2025Post-installed AnchorsFAHAD FATEHspecial
01/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/30/2025Tenant Protection Plan ComplianceFAHAD FATEHspecial
01/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
01/30/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/30/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/30/2025Maintenance informationFAHAD FATEHenergy_progress
01/30/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
12/02/2024HVAC-R and service water heating system controls—energy_progress
Latest 25 of 48.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
08/27/2026B00899449-I1Request digital key ↗
08/24/2026B01061762-S2Request digital key ↗
08/24/2026B01061762-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00274351-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION28
02/24/2026322033615Open ↗
02/19/2026322033615Open ↗
03/11/2025322033615Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION6
06/10/2025322033615Open ↗
06/03/2025322033615Open ↗
01/13/2025322033615Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/26/2019321939088Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISZONING EXHIBIT I: CERTIFICATION1
10/14/2020322033615Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/14/2020322033615Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026B01061762-P2Open ↗
08/24/2026B01061762-P1Open ↗
08/24/2026B01061762-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/25/2026B08034733-P1Open ↗
09/14/2026B01061762-I1Open ↗
09/14/2026B01061762-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026B08034733-P1Open ↗
09/14/2026B01061762-I1Open ↗
09/01/2026B08034733-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/31/2019321939088Open ↗
04/12/2019321939088Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/14/2019321939088Open ↗
04/12/2019321939088Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
05/31/2019321939088Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
04/26/2021322033615Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/24/2026B01061762-S1Open ↗
08/24/2026B01061762-S2Open ↗
08/24/2026B01061762-I1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/30/2019321939088Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/31/2019321939088Open ↗
04/12/2019321939088Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/12/2024322033615Open ↗
10/11/2024322033615Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/14/2024322033615Open ↗
10/11/2024322033615Open ↗
▸Approvals, Objections & Sign-offs28
▸BISSCHEDULE A - OCCUPANCY / USE17
02/19/2026322033615Open ↗
07/30/2024322033615Open ↗
07/25/2024322033615Open ↗
Showing 3 of 17 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
10/11/2024322033615Open ↗
10/11/2024322033615Open ↗
10/11/2024322033615Open ↗
Showing 3 of 11 on file for this type
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/31/2019321939088Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION9
03/18/2025322033615Open ↗
10/11/2024322033615Open ↗
09/01/2022322033615Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
03/26/2020322033615Open ↗
04/12/2019321939088Open ↗
▸Other Documents16
▸DOB NOWLoft Board Certificate12
08/24/2026B01061762-I1Open ↗
08/23/2026B01123989-P1Open ↗
08/15/2026B08034733-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPLOT DIAGRAM1
06/09/2020322033615Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/20/2024322033615Open ↗
▸BISLOFT BOARD CERTIFICATE1
10/11/2024322033615Open ↗
▸BISSupporting Document: Fee Exempt1
03/03/2010301686432Open ↗