← Back
BuildNYC
Police Department
78 RICHMOND TERRACE
STATEN ISLAND · BIN 5106476
💬 Discuss this project
1922Year Built
3Stories
Y2Building Class
C4-2Zoning
—Gross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Police Department · Owner of record: NYC Police Department · 0.54 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2 filings
Floor 31 filing
Floor 21 filing
Floor 11 filing
Cellar1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction2703/21/2026
NYPD710/04/2026
New York Police Department203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Liro Engineers109/24/2026
Chanda Engineering Consultant206/26/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
N.Y.C. Police DepartmentElectrical103/21/2026
ZHL GroupGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Crosscheck Inspection Services544309/24/2026
Building Lifecycle
All (85)Filed (3)Permit Issued (1)Violation (58)Objection (4)Special Inspection (13)
10/28/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
S01188199-I1-MS
10/20/2026
Objection raised — Scope
10/20/2026
Objection resolved — Resolved
09/24/2026
Filed — Alteration
INSTALLATION OF NEW STEEL DUNNAGE FOR THE SUPPORT OF A NEW ROOF TOP CHILLER. NO CHANGE IN USE, EGRESS AND OCCUPANCY WITH THIS APPLICATION. FILED IN CONNECTION TO MS APPLICATION S01188199.
S01397408-I1
07/06/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Final
EUGENE BIFULCO
06/26/2026
Filed — Alteration
Proposed to install new central air conditioning (AC) system cassette type fan- coil units, one (1) air cooled chiller, one (1) make up air unit and exhaust air ductwork as per plan. No change in use, egress and occupancy with this application.
S01188199-P1
06/08/2026
Special inspection requirement — Designated Seismic System
EUGENE BIFULCO
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
EUGENE BIFULCO
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
05/05/2026
Special inspection requirement — Final
EUGENE BIFULCO
03/27/2026
PFE-21-01: Failed to maintain portable fire extinguisher(s) in good working order, in violation of FC107.1 and NFPA 10-13 Section 6.1.2.
FDNY_ORDER violation · closed
03/27/2026
PFE-25-01: Failed to produce and/or maintain records for inspection and/or servicing of portable fire extinguisher(s), in violation of FC906.2 and…
FDNY_ORDER violation · closed
03/27/2026
MF-04-02: Failed to successfully conduct acceptance test witnessed by a Fire Department representative of a device, equipment, or system associated…
FDNY_ORDER violation · closed
03/27/2026
MF-21-01b: Failed to comply with the provisions of the Fire Code and/or Fire Department rules associated with motor fuel-dispensing facility and/or…
FDNY_ORDER violation · closed
10/28/2025
Permit issued — Mechanical Systems
S01188199-I1-MS
09/10/2025
Closed: Failure to file 2023 external low pressure inspection
DOB violation · closed on the city's record
09/10/2025
Closed: Failure to file 2020 external low pressure inspection
DOB violation · closed on the city's record
09/10/2025
Closed: Failure to file 2021 external low pressure inspection
DOB violation · closed on the city's record
09/10/2025
Closed: Failure to file 2019 external low pressure inspection
DOB violation · closed on the city's record
09/10/2025
Closed: Failure to file 2018 external low pressure inspection
DOB violation · closed on the city's record
09/10/2025
Closed: Failure to file 2022 external low pressure inspection
DOB violation · closed on the city's record
09/10/2025
Closed: Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed on the city's record
09/10/2025
Closed: Violation issued for failure to file annual boiler 2016 inspection report
DOB violation · closed on the city's record
09/10/2025
Closed: Violation issued for failure to file annual boiler 2015 inspection report
DOB violation · closed on the city's record
07/09/2025
ADM-21-01b: VO: Failed to comply with all conditions listed in the Fire Department approval for design and installation of device, equipment,…
FDNY_ORDER violation · closed
03/31/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Scope
03/13/2025
Filed — Alteration
Proposed to install new central air conditioning (AC) system cassette type fan- coil units, one (1) air cooled chiller, one (1) make up air unit and exhaust air ductwork as per plan. No change in use, egress and occupancy with this application.
S01188199-I1
11/12/2024
Boiler inspection report filed
Initial · no defects · Accepted
10/03/2024
ADM-21-01b: VO: Failed to comply with all conditions listed in the Fire Department approval for design and installation of device, equipment,…
FDNY_ORDER violation · closed
09/23/2024
Failure to file 2023 external low pressure inspection
DOB violation · closed
02/26/2024
VC19: failed to prepare/produce/submit required documentation: department of buildings certificate of compliance.
FDNY_NOV violation · closed
02/26/2024
VC5: failed to (maintain/produce) records for operation of motor fuel-dispensing facility and/or inspection, testing, and maintenance of device,…
FDNY_NOV violation · closed
11/27/2023
Boiler inspection report filed
Initial · no defects · Accepted
06/30/2023
Failure to file 2020 external low pressure inspection
DOB violation · closed · Issued 2023; DOB's record still lists it as active
06/30/2023
Failure to file 2021 external low pressure inspection
DOB violation · closed · Issued 2023; DOB's record still lists it as active
06/20/2023
Failure to file 2019 external low pressure inspection
DOB violation · closed · Issued 2023; DOB's record still lists it as active
06/20/2023
Failure to file 2018 external low pressure inspection
DOB violation · closed · Issued 2023; DOB's record still lists it as active
04/25/2023
Failure to file 2022 external low pressure inspection
DOB violation · closed · Issued 2023; DOB's record still lists it as active
12/06/2022
Boiler inspection report filed
Initial · no defects · Accepted
08/24/2022
VC5: failed to (maintain/produce) records for operation of motor fuel-dispensing facility and/or inspection, testing, and maintenance of device,…
FDNY_NOV violation · closed
08/24/2022
VC19: failed to prepare/produce/submit required documentation: department of buildings certificate of compliance
FDNY_NOV violation · closed
10/27/2021
Boiler inspection report filed
Initial · no defects · Accepted
11/08/2019
Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed · Issued 2019; DOB's record still lists it as active
04/06/2018
Violation issued for failure to file annual boiler 2016 inspection report
DOB violation · closed · Issued 2018; DOB's record still lists it as active
03/23/2018
Boiler inspection report filed
Initial · no defects · Accepted
02/24/2017
Violation issued for failure to file annual boiler 2015 inspection report
DOB violation · closed · Issued 2017; DOB's record still lists it as active
06/13/2016
Closed: Boiler: boiler (DOB violation)
DOB violation · closed on the city's record
05/19/2016
Closed: Violation issued for failure to file annual boiler 2013 inspection report
DOB violation · closed on the city's record
05/19/2016
Closed: Violation issued for failure to file annual boiler 2012 inspection report
DOB violation · closed on the city's record
05/19/2016
Closed: Violation issued for failure to file annual boiler 2011 inspection report
DOB violation · closed on the city's record
05/19/2016
Closed: Low pressure boiler: boiler (DOB violation)
DOB violation · closed on the city's record
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—ZHL Group—
BIS—Metropolitan Construction—
BIS—N.B.A. Construction—
BIS—Metropolitan Construction—
BIS—N.B.A. Construction—
BIS—Metropolitan Construction—
BIS—Roma Scaffolding—
BIS—Roma Scaffolding—
BIS—Roma Scaffolding—
BIS—Roma Scaffolding—
BIS—York Scaffold Equipment—
BIS—York Scaffold Equipment—
BIS—Rock Scaffolding—
BIS—Glass Armor of New York I—
BIS—Fire Guard of L. I—
BIS—Twin & Swing Scaffolding—
BIS—Bqe Industries—
BIS—Twin & Swing Scaffolding—
BIS—Twin & Swing Scaffolding—
BIS—Bqe Industries—
BIS—The Plumbing Co—
BIS—The Plumbing Company—
BIS—Lilly Construction Co—
BIS—Jack Piccini—
BIS—Gemstar Construction—
BIS—Lilly Construction Co—
BIS—Lilly Construction Co—
BIS—R & L Heating & Air Conditioning—
BIS—Volmar Construction—
BIS—P.A.C. Heating—
BIS—Volmarconstruction—
BIS—P.A.C. Heating—
BIS—The Enviorision Group—
BIS—Crescent Contracting—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 196 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
10/04/2026S01397408-I1Request the plans ↗
08/20/2026S01188199-I1Request the plans ↗
08/20/2026S01188199-P1Request the plans ↗
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION16
04/09/2019540163017Open ↗
02/16/2018520243102Open ↗
06/05/2016540105483Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION14
06/13/2017520243102Open ↗
06/14/2016540105483Open ↗
06/14/2016520243102Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWLPC Approval/Permit3
10/04/2026S01397408-I1Open ↗
08/20/2026S01188199-P1Open ↗
08/13/2026S01188199-I1Open ↗
▸Seals & Professional Certifications46
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
10/22/2018540105633Open ↗
03/19/2018540025747Open ↗
03/19/2018540025747Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
06/05/2016540105483Open ↗
06/05/2016540105633Open ↗
05/08/2015520243102Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
05/08/2015520243102Open ↗
02/06/2013520120912Open ↗
10/02/2012520112155Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/04/2026S01397408-I1Open ↗
08/20/2026S01188199-P1Open ↗
08/20/2026S01188199-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
06/05/2016540105483Open ↗
06/05/2016540105633Open ↗
10/19/2013540025747Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/06/2013520120912Open ↗
10/02/2012520112155Open ↗
09/20/2010520048010Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
06/05/2016540105483Open ↗
06/05/2016540105633Open ↗
10/19/2013540025747Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
04/09/2019540163017Open ↗
01/29/2015540068111Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
10/04/2026S01397408-I1Open ↗
08/24/2026S01188199-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
10/04/2026S01397408-I1Open ↗
08/24/2026S01188199-I1Open ↗
▸Trade Schedules & Equipment5
▸BISFA - FDNY APPROVAL : FD-FAA2
08/14/2012510068613Open ↗
09/28/2011510071921Open ↗
▸BISSCHEDULE B - PLUMBING1
04/09/2019540163017Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/12/2009510068613Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
01/30/2015540068111Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/06/2009510068613Open ↗
▸Environmental & Asbestos13
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
04/09/2019540163017Open ↗
06/05/2016540105633Open ↗
05/09/2016520243102Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
09/20/2010520048010Open ↗
05/22/2009510071921Open ↗
02/12/2009510068613Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
10/04/2026S01397408-I1Open ↗
08/20/2026S01188199-P1Open ↗
08/13/2026S01188199-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
02/20/2018520243102Open ↗
02/20/2018520243102Open ↗
02/20/2018520243102Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/26/2019540163017Open ↗
05/28/2019540163017Open ↗
04/09/2019540163017Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
02/20/2018520243102Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/19/2013540025747Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY7
07/11/2019540163017Open ↗
06/26/2019540163017Open ↗
05/28/2019540163017Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER2
07/12/2011510068613Open ↗
08/24/2012510068613Open ↗
▸Approvals, Objections & Sign-offs36
▸BISLANDMARKS APPROVAL10
06/26/2019540163017Open ↗
02/20/2018520243102Open ↗
06/05/2016540105483Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
10/22/2018540105633Open ↗
10/22/2018540105483Open ↗
03/19/2018540025747Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
02/20/2018520243102Open ↗
06/05/2016540105483Open ↗
06/05/2016540105633Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/02/2012520112155Open ↗
09/17/2010520048010Open ↗
05/22/2009510071921Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
10/04/2026S01397408-I1Open ↗
08/20/2026S01188199-P1Open ↗
08/13/2026S01188199-I1Open ↗
▸BISSHED LETTER2
02/16/2016540025747Open ↗
02/24/2015540025747Open ↗
▸BISOIL TANK REMOVAL CERT : LETTER-FO1
08/14/2012510068613Open ↗
▸BISART COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
05/29/2009510068613Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
04/09/2019540163017Open ↗
02/20/2018520243102Open ↗
05/08/2015520243102Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION12
07/11/2019540163017Open ↗
06/26/2019540163017Open ↗
05/28/2019540163017Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET6
05/08/2015520243102Open ↗
02/06/2013520120912Open ↗
10/02/2012520112155Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
04/09/2019540163017Open ↗
06/05/2016540105483Open ↗
06/05/2016540105633Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
10/22/2018540105633Open ↗
10/22/2018540105483Open ↗
03/19/2018540025747Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/08/2015520243102Open ↗
08/06/2009510068613Open ↗
▸DOB NOWProof of Historic Building2
08/20/2026S01188199-P1Open ↗
08/13/2026S01188199-I1Open ↗