← Back
BuildNYC
Two stories - detached, small or mid-size
78 TILSON PLACE
STATEN ISLAND · BIN 5171590
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R3AZoning
1,916 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,677 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 24p · 2 filings · 5 docs
Floor 15p · 3 filings · 7 docs
Cellar4p · 2 filings · 5 docs
Site & exterior3p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bluestar Properties1207/08/2026
2846 Partners303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect403/01/2022
A Tech Engineering NYC104/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Blue Star Holdings803/21/2026
A Tech Engineering NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blue Star GroupScaffold607/08/2026
Blue Star GroupGeneral Contractor403/21/2026
Joseph M MoraceElectrical103/21/2026
Capital Contracting P&HPlumbing107/08/2026
R&M Piping & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738104/16/2021
Building Lifecycle
All (25)Filed (5)Permit Issued (8)Signed Off (4)Inspection (3)Special Inspection (5)
06/27/2022
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES & GAS FIXTURES FOR THE ONE FAMILY RESIDENCE.
S00400687-I1
06/08/2022
Signed off — Alteration
S00628754-I1
06/08/2022
Signed off — Alteration
S00252316-I1
06/07/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2022
Permit issued — Curb Cut
S00628754-I1-CC
06/01/2022
Signed off — Alteration
S00464897-I1
04/26/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/25/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/20/2022
Permit issued — Plumbing
S82797337-I1-PL
03/01/2022
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES & GAS FIXTURES FOR THE ONE FAMILY RESIDENCE.
S00400687-P1
11/18/2021
Permit issued — Construction Fence
S00252316-I1-FN
11/16/2021
Filed — Alteration
S00628754-I1
10/29/2021
Permit issued — Construction Fence
S00252316-I1-FN
06/22/2021
Permit issued — Foundation
S00464897-I1-FO
06/18/2021
Permit issued — Plumbing
S00400687-I1-PL
06/03/2021
Permit issued — Construction Fence
S00252316-I1-FN
04/16/2021
Filed — Alteration
S00464897-I1
04/14/2021
Special inspection requirement — Subgrade Inspections
anthony santoro
02/03/2021
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
02/03/2021
Special inspection requirement — Deep Foundation Elements
anthony santoro
02/03/2021
Special inspection requirement — Final
anthony santoro
02/03/2021
Special inspection requirement — Footing and Foundation
anthony santoro
10/15/2020
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES & GAS FIXTURES FOR THE ONE FAMILY RESIDENCE.
S00400687-I1
07/15/2020
Permit issued — Construction Fence
S00252316-I1-FN
07/13/2020
Filed — Alteration
S00252316-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBlue Star Group06/02/2022
DOB NOWPlumbingSigned-offR&M Piping & Heating04/20/2022
DOB NOWConstruction FenceSigned-offBlue Star Group11/18/2021
DOB NOWConstruction FenceSigned-offBlue Star Group10/29/2021
DOB NOWFoundationSigned-offBlue Star Group06/22/2021
DOB NOWPlumbingSigned-offCapital Contracting P&H06/18/2021
DOB NOWConstruction FenceSigned-offBlue Star Group06/03/2021
DOB NOWConstruction FenceSigned-offBlue Star Group07/15/2020
BIS—ISSUEDBlue Star Group03/31/2022
BIS—ISSUEDBlue Star Group11/17/2021
BIS—ISSUEDBlue Star Group10/29/2021
1 project · most recent 02/11/2022
General Wiring
FiledStatusContractorScope
02/11/2022CompleteTrue ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/07/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
04/26/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/25/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/14/2021Subgrade Inspectionsanthony santorospecial
02/03/2021Concrete - Cast-In-Placeanthony santorospecial
02/03/2021Deep Foundation Elementsanthony santorospecial
02/03/2021Finalanthony santoroprogress
02/03/2021Footing and Foundationanthony santoroprogress
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/24/2026S00400687-P1Request digital key ↗
08/24/2026S00400687-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Foundation1
08/25/2026S00464897-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00252316-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026S00628754-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION7
06/01/2022520385814Open ↗
05/30/2022520385814Open ↗
01/18/2022520385814Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/31/2022520385814Open ↗
▸BISWORK PERMIT APPLICATION1
06/09/2021520385814Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
06/09/2021520385814Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/06/2019520385814Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
06/15/2022520385814Open ↗
▸BISVERIFY TAX LOT1
06/15/2022520385814Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
11/06/2019520385814Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/15/2022520385814Open ↗
▸BISZONING DIAGRAM1
06/22/2020520385814Open ↗
▸Seals & Professional Certifications19
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
11/08/2019520385814Open ↗
11/08/2019520385814Open ↗
11/08/2019520385814Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00628754-I1Open ↗
08/24/2026S00400687-I1Open ↗
08/24/2026S00400687-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/10/2022520385814Open ↗
06/24/2020520385814Open ↗
11/06/2019520385814Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026S00464897-I1Open ↗
08/28/2026S00464897-I1Open ↗
08/28/2026S00464897-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S00464897-I1Open ↗
08/28/2026S00464897-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/06/2019520385814Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
06/14/2022520385814Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
06/14/2022520385814Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/15/2022520385814Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/15/2022520385814Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
06/14/2022520385814Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
06/08/2021520385814Open ↗
▸BISSTREET TREE CHECKLIST1
11/06/2019520385814Open ↗
▸BISSTREET TREE SIGNOFF1
06/14/2022520385814Open ↗
▸Energy Compliance14
▸BISAIR SEALING AND INSULATION - VISUAL1
06/14/2022520385814Open ↗
▸BIS* SOLAR READY REQUIREMENTS1
06/14/2022520385814Open ↗
▸BIS* DUCT LEAKAGE TESTING1
06/14/2022520385814Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
06/14/2022520385814Open ↗
▸BISFENESTRATION AREAS1
06/14/2022520385814Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
06/14/2022520385814Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/08/2021520385814Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/14/2022520385814Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/14/2022520385814Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/14/2022520385814Open ↗
▸BIS* HVAC INSULATION AND SEALING1
06/14/2022520385814Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/06/2019520385814Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/14/2022520385814Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
06/14/2022520385814Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY4
07/29/2021520385814Open ↗
07/29/2021520385814Open ↗
06/09/2021520385814Open ↗
Showing 3 of 4 on file for this type
▸BISDEEP FOUNDATIONS / PILES2
06/14/2022520385814Open ↗
06/14/2022520385814Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7202
11/06/2019520385814Open ↗
11/06/2019520385814Open ↗
▸BISSOIL PERC. TEST-STORM WATER SYSTEM (DRYWELL)2
06/24/2020520385814Open ↗
11/12/2019520385814Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
06/14/2022520385814Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
06/14/2022520385814Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/14/2022520385814Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/14/2022520385814Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
06/14/2022520385814Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
06/14/2022520385814Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/06/2019520385814Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00464897-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE1
06/24/2020520385814Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/06/2019520385814Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/10/2022520385814Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION4
06/15/2022520385814Open ↗
06/01/2022520385814Open ↗
01/18/2022520385814Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
11/06/2019520385814Open ↗
▸Other Documents9
▸BISSHUTOFF DAMPERS1
06/14/2022520385814Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/24/2020520385814Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/24/2020520385814Open ↗
▸BISMAINTENANCE INFORMATION1
06/14/2022520385814Open ↗
▸BISPERMANENT CERTIFICATE1
06/14/2022520385814Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
06/14/2022520385814Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
06/14/2022520385814Open ↗
▸BISSITE CONNECTION:DEP1
06/24/2020520385814Open ↗
▸BISPLOT DIAGRAM1
06/24/2020520385814Open ↗