← Back
BuildNYC
Elevator apt, fireproof without stores
West Brighton Houses
780 HENDERSON AVENUE · BIN 5095815
💬 Discuss this project
1962Year Built
8Stories
D3Building Class
R3-2Zoning
550,010 sfGross Floor Area
634Units
Rent Stabilized80 Active Violations 72 unresolved · 8 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 550,992 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsWest Brighton Houses Phase IIUnder Construction1 filing
RoofFacade restoration and window sill replacement1p · 1 filing
BulkheadFacade exterior work and life-lines1p · 1 filing · 12 docs
Site & exteriorInstallation of heavy duty sidewalk shed2 filings · 8 docs
Filed — no permit issuedWest Brighton Houses Phase II Building 3 Renovation1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority803/21/2026
NYC Department of Housing Preservation and Development203/21/2026
West Brighton HTC Tenant103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EP Engineering906/29/2026
Ocv Architects410/21/2024
Ashraf110/15/2024
Spar Unlimited108/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning2203/21/2026
Danico Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
West Brighton BuilderGeneral Contractor804/09/2026
Platinum Services NYScaffold604/09/2026
Pyramid Etc CompaniesGeneral Contractor303/21/2026
Dual Fuel Plumbing & HeatingPlumbing207/08/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
Zena ElectricElectrical103/22/2026
Arco Plumbing and HeatingPlumbing107/08/2026
Pappas & Fodera Elect'lElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Special Testing & Consulting16881306/29/2026
Joel Phagoo, PE2416303/25/2025
Spar Unlimited5967108/05/2024
Building Lifecycle
All (120)Filed (18)Permit Issued (15)Signed Off (6)Facade (FISP) (13)Violation (18)Inspection (6)Objection (14)Special Inspection (30)
09/02/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-S2
08/05/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-S4
07/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
06/29/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-P9
06/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
06/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
04/30/2026
Signed off — Alteration
Misc replacement of brick masonry, replacement of structural steel shelf angles, misc replacement of window sills, and repair of metal fascia. No change in use egress or occupancy.
S01077464-I1
04/29/2026
Cycle 10 facade report signed — SAFE
04/21/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-P8
04/17/2026
Cycle 10 facade inspection completed
04/14/2026
Special inspection requirement — Post-installed Anchors
SEBASTIAN SETTEDUCATE JR., P.E
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
04/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND CONSTRUCTION FENCEAS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
S01108709-I1
02/20/2026
Permit issued — Plumbing
S00943337-S4-PL
02/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Shutoff dampers
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
01/30/2026
Cycle 10 facade report submitted
01/29/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-P7
01/16/2026
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — Mechanical Systems
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — Heating Systems
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/16/2026
Special inspection requirement — Maintenance information
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — Shutoff dampers
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SEBASTIAN SETTEDUCATE JR., P.E
01/16/2026
Special inspection requirement — Final
SEBASTIAN SETTEDUCATE JR., P.E
01/06/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-S3
12/08/2025
Permit issued — Mechanical Systems
S00943337-S2-MS
12/08/2025
Permit issued — General Construction
S00943337-I1-GC
10/14/2025
Permit issued — Sidewalk Shed
S01108709-I1-SH
10/14/2025
Permit issued — Sidewalk Shed
S01108709-I1-FN
09/03/2025
Signed off — Alteration
EXTERIOR FACADE REPAIRS WITH FACADE INSPECTIONS WITH 3 LIFE-LINES, INSTALL OUTRIGGER BEAMS AND ROOF HOIST. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
S01076910-I1
09/03/2025
Permit issued — Suspended Scaffold
S01076910-I1-SC
07/15/2025
Violation issued (ECB, closed)
Elevators
07/06/2025
Violation issued (HPD, closed)
C
07/06/2025
Violation issued (HPD, closed)
C
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
C
06/12/2025
Violation issued (HPD, closed)
A
05/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
SEBASTIAN SETTEDUCATE JR., P.E
05/12/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING BUILDING. REPLACEMENT OF WINDOWS & DOORS & EXISTING CONVECTOR HOUSING, NEW FINISHES & LIGHT FIXTURES, RENOVATION OF LOBBY, NEW FIXTURES & FINISHES. MINOR MASONRY REPAIR & FACADE WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00943337-P5
05/02/2025
Permit issued — Plumbing
S00943337-S3-PL
03/31/2025
Violation issued (HPD, closed)
A
03/25/2025
Filed — Alteration
EXTERIOR FACADE REPAIRS WITH FACADE INSPECTIONS WITH 3 LIFE-LINES, INSTALL OUTRIGGER BEAMS AND ROOF HOIST. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION.
S01076910-P2
03/24/2025
Violation issued (HPD, closed)
C
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating02/20/2026
DOB NOWMechanical SystemsSigned-offWest Brighton Builder12/08/2025
DOB NOWGeneral ConstructionPermit IssuedWest Brighton Builder12/08/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/14/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/14/2025
DOB NOWSuspended ScaffoldSigned-offPremier Construction09/03/2025
DOB NOWPlumbingSigned-offG.M.A. Plumbing & Heating05/02/2025
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating01/27/2025
DOB NOWMechanical SystemsSigned-offWest Brighton Builder12/13/2024
DOB NOWGeneral ConstructionPermit IssuedWest Brighton Builder12/13/2024
DOB NOWPlumbingSigned-offArco Plumbing and Heating12/13/2024
DOB NOWStructuralSigned-offPyramid Etc Companies12/09/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY10/16/2024
DOB NOWConstruction FenceSigned-offPlatinum Services NY10/16/2024
DOB NOWSuspended ScaffoldSigned-offPremier Construction08/08/2024
BISEQISSUEDLakhi General Contractor09/23/2015
BISEQISSUEDLakhi General Contractor09/23/2015
BISOTISSUEDLakhi General Contractor06/19/2015
BISEQISSUEDLakhi General Contractor03/02/2015
BISEQISSUEDLakhi General Contractor10/02/2014
BISEQISSUEDLakhi General Contractor10/02/2014
BISOTISSUEDLakhi General Contractor09/15/2014
BISPLISSUEDOnofrio Loduca Plumbing08/26/2010
BISPLISSUEDCanea Mare Contracting03/07/2000
BISOTISSUEDCanea Mare Contracting03/07/2000
BISOTISSUEDTrataros Plumbing06/12/1995
1 project · most recent 06/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/29/2026Signed-offDual Fuel Plumbing & HeatingGas, Water/Sanitary
5 projects · most recent 07/14/2025
General Wiring
FiledStatusContractorScope
07/14/2025CompleteAngler ElectricGeneral Wiring
11/07/2024CompleteZena Electric—
10/17/2024CompleteRichard Neu—
10/16/2024CompleteCentennial Elevator IndustriesGeneral Wiring
08/08/2023CompleteTri-State Electrical & Mechanical IGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/19/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/06/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/29/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
07/29/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/29/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
06/29/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
06/29/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
04/14/2026Post-installed AnchorsSEBASTIAN SETTEDUCATE JR., P.Especial
04/14/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
04/14/2026Tenant Protection Plan Compliance—special
02/06/2026Tenant Protection Plan ComplianceSEBASTIAN SETTEDUCATE JR., P.Especial
02/06/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
02/06/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
02/06/2026HVAC-R and service water heating system controlsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/06/2026HVAC-R and service water piping design and insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/06/2026HVAC-R and service water heating equipmentSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/06/2026Maintenance informationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/06/2026Shutoff dampersSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
02/06/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
02/06/2026Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
02/06/2026Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
01/16/2026Shutoff dampersSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
01/16/2026Tenant Protection Plan Compliance—special
01/16/2026Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
01/16/2026Heating SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
01/16/2026Mechanical SystemsSEBASTIAN SETTEDUCATE JR., P.Especial
01/16/2026Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
01/16/2026FinalSEBASTIAN SETTEDUCATE JR., P.Eprogress
Latest 25 of 76.
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/21/2026S01077464-I1Request digital key ↗
08/20/2026S01108709-I1Request digital key ↗
08/19/2026S01076910-P2Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION9
10/13/2015540057551Open ↗
09/25/2015540057720Open ↗
06/22/2015540045100Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
10/21/2015540057720Open ↗
10/21/2015540057551Open ↗
02/24/2015540068433Open ↗
Showing 3 of 8 on file for this type
▸BISAFTER-HOUR WORK PERMIT APPLICATION1
04/02/2015540045100Open ↗
▸Seals & Professional Certifications69
▸DOB NOWSpecial Inspector Seal & Signature17
10/02/2026S01076910-P1Open ↗
09/28/2026S00943337-P8Open ↗
09/23/2026S00943337-S3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/17/2026S00943337-P9Open ↗
08/17/2026S00943337-P8Open ↗
08/13/2026S01077464-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026S00943337-P2Open ↗
09/02/2026S00943337-P2Open ↗
09/02/2026S00943337-S2Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
11/01/2016540045100Open ↗
11/01/2016540045100Open ↗
04/01/2016540057720Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
02/24/2015540068433Open ↗
09/08/2014540057720Open ↗
09/08/2014540057551Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/24/2015540068433Open ↗
09/08/2014540057720Open ↗
09/08/2014540057551Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
02/24/2015540068433Open ↗
09/08/2014540057720Open ↗
09/08/2014540057551Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/22/2008510048388Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/22/2008510048388Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
10/19/2010510048388Open ↗
12/29/2009510048388Open ↗
▸BISSCHEDULE B - PLUMBING1
07/22/2008510048388Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN 2008 CODE2
04/09/2014540045093Open ↗
04/09/2014540045100Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S01034208-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/21/2026S01077464-I1Open ↗
08/17/2026S00943337-S4Open ↗
08/17/2026S00943337-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
11/01/2016540045100Open ↗
04/09/2014540045093Open ↗
04/09/2014540045100Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/22/2008510048388Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/01/2016540045100Open ↗
08/27/2014540045100Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/09/2014540045093Open ↗
04/09/2014540045100Open ↗
▸BISNYCECC ANALYSIS2
04/09/2014540045093Open ↗
04/09/2014540045100Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/01/2016540045100Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
04/09/2014540045100Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026S00943337-S2Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
02/24/2015540068433Open ↗
09/08/2014540057720Open ↗
09/08/2014540057551Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/17/2026S00943337-P9Open ↗
08/17/2026S00943337-P8Open ↗
08/13/2026S00943337-P4Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/01/2016540045100Open ↗
04/01/2016540057720Open ↗
04/01/2016540068433Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter5
08/13/2026S00943337-I1Open ↗
08/13/2026S00943337-S2Open ↗
08/13/2026S00943337-S4Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/22/2008510048388Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/01/2016540045100Open ↗
04/09/2014540045093Open ↗
04/09/2014540045100Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms10
▸BISEFILING JOB APPLICATION COVER SHEET5
02/24/2015540068433Open ↗
09/08/2014540057720Open ↗
09/08/2014540057551Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
10/29/2015540057720Open ↗
10/29/2015540057551Open ↗
04/09/2014540045093Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET1
07/22/2008510048388Open ↗
▸Other Documents12
▸BISFEE EXEMPTION DOCUMENTATION3
02/24/2015540068433Open ↗
09/08/2014540057720Open ↗
09/08/2014540057551Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026S01076910-P1Open ↗
08/13/2026S01076910-I1Open ↗
08/13/2026S01076910-P2Open ↗
▸DOB NOWCalculations3
08/13/2026S01076910-P2Open ↗
08/13/2026S01076910-P1Open ↗
08/13/2026S01076910-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/01/2016540045100Open ↗
04/02/2015540045100Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/08/2014540057720Open ↗