← Back
BuildNYC
Primarily 3 family with 1 store or office
7803 13TH AVENUE
BROOKLYN · Dyker Heights · BIN 3161891
💬 Discuss this project
1931Year Built
2Stories
S3Building Class
R5BZoning
2,600 sfGross Floor Area
4Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Primarily 3 family with 1 store or office · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 5Lucky 1 Convenience2p · 1 filing · 3 docs
Floor 4Lucky 1 Convenience2p · 1 filing · 3 docs
Floor 3Lucky 1 Convenience2p · 1 filing · 3 docs
Floor 2Lucky 1 ConvenienceUnder Construction9p · 3 filings · 20 docs
Floor 1Lucky 1 Convenience, Unit 103Under Construction8p · 3 filings · 20 docs
CellarTriple E Property LLCUnder Construction9p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lucky 1 Convenience503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/17/2026$980K—Private party → TRIPLE E PROPERTY LLC$377/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Building106/17/2026
HPL Engineering304/22/2026
Jose L. Pena, P.E103/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kale ConstructionGeneral Contractor106/28/2026
L.S. Sign CoSign hanger107/08/2026
American Standard P&H CororpPlumbing107/16/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL Engineering5613204/22/2026
Building Lifecycle
All (67)Filed (5)Permit Issued (3)Signed Off (1)Violation (38)Objection (10)Special Inspection (10)
07/15/2026
Permit issued — Plumbing
B01381701-S1-PL
06/22/2026
Permit issued — General Construction
B01418519-I1-GC
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/17/2026
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 3 DWELLING UNIT. NEW PARTITION, DOOR, FLOORING & COSMETIC WORK AS PER PLAN SUBMITTED. PL AND BL WORK TO BE FILED SUB-SEQUENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01418519-I1
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Cost
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Cost
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Mechanical
04/28/2026
Objection raised — Inspections
04/28/2026
Objection raised — Mechanical
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Fire_Protection
04/22/2026
Filed — Alteration
SUBSEQUENCE BOILER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01381701-I1. CAP & REMOVE EXISTING BOILER & INSTALL NEW BOILER AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01381701-S2
04/22/2026
Filed — Alteration
SUBSEQUENCE BOILER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01381701-I1. CAP & REMOVE EXISTING BOILER & INSTALL NEW BOILER AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01381701-I1
04/22/2026
Filed — Alteration
SUBSEQUENCE BOILER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01381701-I1. CAP & REMOVE EXISTING BOILER & INSTALL NEW BOILER AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01381701-S1
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
04/22/2026
Special inspection requirement — Fenestration air leakage
Fran Huang
04/22/2026
Special inspection requirement — Fenestration areas
Fran Huang
04/22/2026
Special inspection requirement — Interior lighting power
Fran Huang
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
04/22/2026
Special inspection requirement — Air barrier - visual inspection
Fran Huang
04/03/2024
Violation issued (HPD, closed)
A
10/14/2023
Violation issued (HPD, closed)
B
10/14/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
03/20/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
I
01/08/2021
Signed off — Alteration
B00321806-I1
03/19/2020
Permit issued — Sign
B00321806-I1-SG
03/18/2020
Filed — Alteration
B00321806-I1
10/12/2018
Violation issued (HPD, closed)
I
08/24/2018
Violation issued (ECB, closed)
Construction
08/24/2018
Violation issued (ECB, closed)
Zoning
08/24/2018
Violation issued (ECB, closed)
Construction
11/15/2017
Violation issued (HPD, closed)
I
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp07/15/2026
DOB NOWGeneral ConstructionPermit IssuedKale Construction06/22/2026
DOB NOWSignSigned-offWeinfeld, Elliot03/19/2020
BIS—ISSUEDN/A06/19/2002
BISPLISSUEDLoverde Plumbing & Heating06/13/2002
BIS—ISSUEDN/A04/10/2002
1 project · most recent 04/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2026Permit IssuedAmerican Standard P&HGas, Water/Sanitary
1 project · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026Permit IssuedGalaxy ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/22/2026HVAC-R and service water heating equipmentFran Huangenergy_progress
06/22/2026HVAC-R and service water heating system controlsFran Huangenergy_progress
06/22/2026HVAC-R and service water piping design and insulationFran Huangenergy_progress
04/22/2026Fire-Resistant Penetrations and JointsFran Huangspecial
04/22/2026Energy Code Compliance InspectionsFran Huangprogress
04/22/2026Fenestration air leakageFran Huangenergy_progress
04/22/2026Fenestration areasFran Huangenergy_progress
04/22/2026Interior lighting powerFran Huangenergy_progress
04/22/2026Fenestration and door U-factor and product ratingsFran Huangenergy_progress
04/22/2026Air barrier - visual inspectionFran Huangenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Lucky 1 ConvenienceRetailFloors 1–5
Project B00321806 Alteration · LOC Issued · 03/18/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/17/2026B01381701-S1Request digital key ↗
08/17/2026B01381701-I1Request digital key ↗
08/17/2026B01381701-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00321806-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026B01381701-I1Open ↗
08/26/2026B01381701-I1Open ↗
08/26/2026B01381701-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01381701-I1Open ↗
08/17/2026B01381701-S2Open ↗
08/17/2026B01381701-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01381701-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01381701-I1Open ↗
08/17/2026B01381701-S2Open ↗
08/17/2026B01381701-S1Open ↗
Showing 3 of 5 on file for this type