RoofUnder Construction7p · 6 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalStructural
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
On file for this job
21 documents · 3 drawing sheets
Facade Repairs to existing building as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
On file for this job
16 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. East pipe scaffold, from the 24th, 25th, and 26th floor setback and beam system to past the top of the chimney. South pipe scaffold, from the 22nd and 24th floor
On file for this job
9 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 381p · 2 filings · 6 docs
ElectricalStructural
INSTALLATION OF SUPPORTED SCAFFOLDING FOR TEMPORARY ACCESS TO TOWER IN ACCORDANCE WITH NYC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
3 documents · 1 drawing sheet
Floor 371p · 2 filings · 6 docs
Electrical
INSTALLATION OF SUPPORTED SCAFFOLDING FOR TEMPORARY ACCESS TO TOWER IN ACCORDANCE WITH NYC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
No filed description on record for this job.
On file for this job
3 documents · 1 drawing sheet
Floor 36
Floor 35
Floor 34
Floor 332p · 2 filings · 20 docs
ArchitectureDMMechanical
New GWB ceilings throughout with new led lighting as shown on drawings. No change in use, egress or occupancy.
On file for this job
25 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Floor 32
Floor 31
Floor 30
Floor 291p · 1 filing · 20 docs
Structural
Interior renovation of apartment # 29t on the 29th floor. No change in use. occupancy or egress.
On file for this job
33 documents · 1 drawing sheet
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24Under Construction1 filing · 9 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
Floor 23Under Construction1 filing · 9 docs
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
Floor 22Under Construction1p · 2 filings · 12 docs
Electrical
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
INSTALLATION OF SUPPORTED SCAFFOLDING FOR TEMPORARY ACCESS TO TOWER IN ACCORDANCE WITH NYC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this job
3 documents · 1 drawing sheet
Floor 21Under Construction1p · 2 filings · 20 docs
Plumbing
Issued Permit Scope
Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
Filing herewith plumbing modifications in apt 2101. No change in use,egress or occupancy.
On file for this job
12 documents
Floor 20Under Construction1p · 2 filings · 18 docs
Structural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
INSTALLATION OF PIPE SCAFFOLDING, OVERHEAD PROTECTION AND SYSTEM BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
9 documents · 1 drawing sheet
Floor 19Under Construction7p · 2 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
General construction to include interior renovation and minor demo as per plans
On file for this job
50 documents · 1 drawing sheet
Floor 18Under Construction4p · 4 filings · 20 docs
ArchitectureElectricalGeneralMechanical
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this job
9 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. East pipe scaffold, from the 24th, 25th, and 26th floor setback and beam system to past the top of the chimney. South pipe scaffold, from the 22nd and 24th floor
On file for this job
9 documents · 2 drawing sheets
INSTALLATION OF PIPE SCAFFOLDING, OVERHEAD PROTECTION AND SYSTEM BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this job
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 171p · 1 filing · 8 docs
General
Mechanical modifications to an existing residential apartment located on 17th fl apart# 1704
On file for this job
8 documents · 1 drawing sheet
Floor 16
Floor 15
Floor 149p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Plumbing
Filing herewith mechanical modifications as per plans.
On file for this job
19 documents · 2 drawing sheets
Filing herewith plumbing modifications as per plans
On file for this job
11 documents · 1 drawing sheet
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9Under Construction19p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing modifications to an existing apartment as per plans
On file for this job
21 documents · 5 drawing sheets
Floor 8
Floor 7
Floor 6
Floor 5Under Construction29p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing modifications as per plans
On file for this job
22 documents · 4 drawing sheets
Floor 42p · 1 filing · 10 docs
Structural
Structural modifications to
On file for this job
10 documents · 2 drawing sheets
Floor 38p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
filing herewith courtyard facade renovation as per plans
On file for this job
13 documents · 1 drawing sheet
Structural modifications to
On file for this job
10 documents
Floor 242p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
filing herewith courtyard facade renovation as per plans
On file for this job
13 documents
Structural modifications to
On file for this job
10 documents
Herewith filing to modify the existing Chilled water Fan Coil units with Electric heat and humidification.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1Under Construction31p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications to an existing retail space as per plans
On file for this job
86 documents
Structural modifications to include demo and shoring as per plans
On file for this job
12 documents · 1 drawing sheet
Plumbing Modifications as per plans
On file for this job
37 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
MezzanineUnder Construction36p · 2 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications to an existing retail space as per plans
On file for this job
86 documents · 10 drawing sheets
Structural modifications to include demo and shoring as per plans
On file for this job
12 documents · 2 drawing sheets
Cellar2p · 1 filing · 18 docs
MechanicalStructural
Steel Girder Replacement and sidewalk repair. No change in use, egress and occupancy.
On file for this job
18 documents · 2 drawing sheets
Sub-Cellar1p · 1 filing · 18 docs
MechanicalStructural
Steel Girder Replacement and sidewalk repair. No change in use, egress and occupancy.
On file for this job
18 documents · 1 drawing sheet