Whole building & multi-floor projects1 filing
INSTALLATION OF SUPPORTED SCAFFOLDING FOR TEMPORARY ACCESS TO TOWER IN ACCORDANCE WITH NYC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
3 documents
RoofTemporary pipe scaffold installationUnder Construction7p · 4 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. East pipe scaffold, from the 24th, 25th, and 26th floor setback and beam system to past the top of the chimney. South pipe scaffold, from the 22nd and 24th floor
On file for this project
9 documents · 2 drawing sheets
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
On file for this project
21 documents · 3 drawing sheets
Facade Repairs to existing building as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
On file for this project
16 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 38Unit PH2
Electrical
Issued Permit Scope
Supported Scaffold
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33New GWB ceilings and LED lighting2p · 2 filings · 20 docs
ArchitectureDMElectricalMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
New GWB ceilings throughout with new led lighting as shown on drawings. No change in use, egress or occupancy.
On file for this project
25 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Floor 32
Floor 31
Floor 30
Floor 29Unit 29T1p · 3 filings · 20 docs
ArchitectureElectricalMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Interior renovation of apartment # 29t on the 29th floor. No change in use. occupancy or egress.
On file for this project
33 documents · 1 drawing sheet
Mechanical application filed in conjunction with GC filing for interior renovation of apartment 29T on the 29th Floor.
On file for this project
17 documents
Plumbing application filed in conjunction with GC filing for interior renovation of apartment 29T on the 29th Floor. No change in use, occupancy, or egress.
On file for this project
21 documents
Floor 28
Floor 27
Floor 26
Floor 25Unit 25T1 filing · 8 docs
ArchitectureElectrical
Issued Permit Scope
General Construction · Supported Scaffold
General construction to include interior renovations of an existing apartment located on the 25th fl , apt 25T.
On file for this project
8 documents
Floor 24Temporary pipe scaffold installationUnder Construction1 filing · 9 docs
ElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
Floor 23Unit 2304, Unit 2306Under Construction2 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
Plumbing modifications to an existing residential apartment located on the 23rd floor apt 2304/06 as per plans
On file for this project
25 documents
Floor 22Unit 2026, Unit 2204Under Construction2p · 2 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Plumbing modifications to an existing apartment as per plans
On file for this project
21 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
Floor 21Unit 2101, Unit 2104, Unit 2106Under Construction3p · 4 filings · 20 docs
ElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
Filing herewith plumbing modifications in apt 2101. No change in use,egress or occupancy.
On file for this project
12 documents
HVAC installation in apartment 2101. No change in use, egress oroccupancy.
On file for this project
8 documents
Latest 3 of 4 filings on this floor.
Floor 20Unit 2004Under Construction1p · 4 filings · 20 docs
ElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
INSTALLATION OF PIPE SCAFFOLDING, OVERHEAD PROTECTION AND SYSTEM BEAM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
9 documents · 1 drawing sheet
Filing herewith plumbing application as per plans submitted herewith. No change in use, egress or occupancy.
On file for this project
10 documents
Latest 3 of 4 filings on this floor.
Floor 19Unit 1901Under Construction1p · 2 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
General construction to include interior renovation and minor demo as per plans
On file for this project
50 documents · 1 drawing sheet
Floor 18Unit 1801Under Construction4p · 5 filings · 20 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. East pipe scaffold, from the 24th, 25th, and 26th floor setback and beam system to past the top of the chimney. South pipe scaffold, from the 22nd and 24th floor
On file for this project
9 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY. PIPE SCAFFOLD ROP OF THE SIDEWALK SHED FROM 18TH FKOOR TO 24TH FLOOR.
On file for this project
9 documents
Plumbing Modifications as per plans
On file for this project
37 documents
Latest 3 of 5 filings on this floor.
Floor 17Unit 1701, Unit 17041p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing modifications to include removal of plumbing fixtures as per drawings filed herewith.
On file for this project
23 documents
Mechanical modifications to an existing residential apartment located on 17th fl apart# 1704
On file for this project
8 documents · 1 drawing sheet
Floor 16Unit 1601, Unit 16041 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR ALTERATION OF THE APARTMENT 1601/ 1604 FOR WATER DAMAGE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Floor 15
Floor 14Unit 14113p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Renovation of existing residential apartment (Apt # 1411) No change to use, egress or occupancy under this application.
On file for this project
11 documents
Filing herewith mechanical modifications as per plans.
On file for this project
19 documents · 2 drawing sheets
Filing herewith plumbing modifications as per plans
On file for this project
11 documents · 1 drawing sheet
Floor 13
Floor 12
Floor 11Unit 11041 filing · 8 docs
Architecture
Issued Permit Scope
General Construction
Filing herewith application for minor renovations on the 11th floor. No change in use, egress or occupancy.
On file for this project
8 documents
Floor 10
Floor 9Unit 901Under Construction5p · 1 filing · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing modifications to an existing apartment as per plans
On file for this project
21 documents · 5 drawing sheets
Floor 8
Floor 7
Floor 6Unit 5011 filing · 9 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Mechanical modifications associated with interior renovation of apt #501. No change to use, egress or occupancy.
On file for this project
9 documents
Floor 5Unit 505Under Construction4p · 1 filing · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Plumbing modifications as per plans
On file for this project
22 documents · 4 drawing sheets
Floor 4
Floor 3Courtyard facade renovation1p · 3 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction · Structural
filing herewith courtyard facade renovation as per plans
On file for this project
13 documents · 1 drawing sheet
Structural modifications to
On file for this project
10 documents
GENERAL CONSTRUCTION TO INCLUDE RENOVATIONS AS PER DRAWINGS FILED HEREWITH.
On file for this project
23 documents
Floor 2Unit 10111p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
filing herewith courtyard facade renovation as per plans
On file for this project
13 documents · 1 drawing sheet
Structural modifications to
On file for this project
10 documents
Herewith filing to modify the existing Chilled water Fan Coil units with Electric heat and humidification.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1Retail store renovationUnder Construction6p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications to an existing retail space as per plans
On file for this project
86 documents · 1 drawing sheet
Structural modifications to include demo and shoring as per plans
On file for this project
12 documents · 1 drawing sheet
Steel Girder Replacement and sidewalk repair. No change in use, egress and occupancy.
On file for this project
18 documents · 4 drawing sheets
MezzanineRetail store renovationUnder Construction19p · 2 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications to an existing retail space as per plans
On file for this project
86 documents · 17 drawing sheets
Structural modifications to include demo and shoring as per plans
On file for this project
12 documents · 2 drawing sheets
CellarSidewalk vault shoring and repair2p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Steel Girder Replacement and sidewalk repair. No change in use, egress and occupancy.
On file for this project
18 documents · 2 drawing sheets
Plumbing work in sub-cellar and cellar. Ansul system filed under JOB # 110327290. No change in use, egress or occupancy.
On file for this project
17 documents
Sub-CellarSidewalk vault shoring and repair1p · 2 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Steel Girder Replacement and sidewalk repair. No change in use, egress and occupancy.
On file for this project
18 documents · 1 drawing sheet
Plumbing work in sub-cellar and cellar. Ansul system filed under JOB # 110327290. No change in use, egress or occupancy.
On file for this project
17 documents
Site & exteriorSidewalk shed installationUnder Construction11 filings · 20 docs
ArchitectureElectricalEquipmentGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Structural · Supported Scaffold
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
3 documents · 5 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. East pipe scaffold, from the 24th, 25th, and 26th floor setback and beam system to past the top of the chimney. South pipe scaffold, from the 22nd and 24th floor
On file for this project
9 documents · 12 drawing sheets
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 11 filings on this floor.
Filed — no permit issuedTemporary supported scaffold installation1 filing · 3 docs
CivilElectricalStructural
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
3 documents · 12 drawing sheets