← Back
BuildNYC
Elevator apt, miscellaneous
781 ELSMERE PLACE
BRONX · BIN 2010086
💬 Discuss this project
1912Year Built
5Stories
D9Building Class
C4-4AZoning
44,852 sfGross Floor Area
80Units
16 Active Violations ▸
Elevator apt, miscellaneous · Owner of record: Lee Goodwin Housing Development Fund Corp Poration · 11,120 sf lot · 4.03 FAR built · Flood zone X
Locations of Work
PlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSprinkler system installation1 filing · 10 docs
Floor 7Sprinkler system installation2 filings · 20 docs
Floor 6Sprinkler system installation2 filings · 20 docs
Floor 5Sprinkler system installation2 filings · 20 docs
Floor 4Sprinkler system installation2 filings · 20 docs
Floor 3Sprinkler system installation2 filings · 20 docs
Floor 2Sprinkler system installation2 filings · 20 docs
Floor 1Sprinkler system installation3 filings · 20 docs
CellarSprinkler system installation2 filings · 20 docs
Site & exteriorNew 7 story residential building2 filings · 10 docs
Nothing on file for this building.
Building Lifecycle
01/21/2022
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
01/12/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/06/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/31/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/31/2021
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPat Sementa P&H06/11/2021
DOB NOWPlumbingSigned-offNY Plumbing & Heating05/11/2021
DOB NOWConstruction FenceSigned-offStepping Stone Construction12/04/2020
DOB NOWConstruction FenceSigned-offBori Construction10/15/2020
DOB NOWSidewalk ShedSigned-offReliable Enterprises09/18/2020
1 project · most recent 09/18/2020
FiledStatusContractorScope
09/18/2020Permit IssuedRichard Neu—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/21/2022Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
01/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/06/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/31/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/31/2021Certified Sprinkler - SP - RoughingCertifiedView ↗
Nothing on file for this building.