← Back
Elevator apt, semi-fireproof without stores
781 ELSMERE PLACE
BRONX · BIN 2130571
💬 Discuss this project
2021Year Built
7Stories
D1Building Class
R7-1Zoning
21,901 sfGross Floor Area
25Units
Rent Stabilized12 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: 781-783 ELSMERE LLC · 5,000 sf lot · 4.38 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingFire Protection
Roof1p · 1 filing · 14 docs
Floor 671p · 1 filing · 14 docs
Floor 66
Floor 65
Floor 64
Floor 63
Floor 62
Floor 61
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 52
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 71p · 1 filing · 10 docs
Floor 62p · 1 filing · 10 docs
Floor 5
Floor 4
Floor 32p · 1 filing · 10 docs
Floor 22p · 1 filing · 10 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
744 E 2154207/08/2026
TOPLINE NYC CONTRACTING303/22/2026
781-783 ELSMERE LLC903/22/2026
RELIABLE ENTERPRISES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1703/11/2022
SYED ENGINEERING, P.C.105/21/2021
ENTHINK ENGINEERS LLC202/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ARCH ENGIN CONSULT2203/21/2026
NODE ARCHITECTURE ENGINEERING CON803/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZEFI & CO. LLCGeneral Contractor907/08/2026
DENNISON ELECTRIC CORP 003326General Contractor303/22/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
KODRA CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795701/28/2022
NODE ARCHITECTURE,ENGINEE6799811/17/2021
Building Lifecycle
All (125)Filed (20)Permit Issued (6)Signed Off (10)Violation (55)Inspection (2)Objection (6)Special Inspection (26)
06/01/2026
Violation issued (HPD, closed)
A
06/01/2026
Violation issued (HPD, closed)
C
06/01/2026
Violation issued (HPD, closed)
B
06/01/2026
Violation issued (HPD, closed)
A
06/01/2026
Violation issued (HPD, closed)
C
04/02/2026
Violation issued (HPD, closed)
B
04/02/2026
Violation issued (HPD, closed)
C
04/02/2026
Violation issued (HPD, closed)
B
04/02/2026
Violation issued (HPD, closed)
B
05/19/2025
Violation issued (HPD, open)
B
05/19/2025
Violation issued (HPD, closed)
C
05/19/2025
Violation issued (HPD, closed)
C
05/19/2025
Violation issued (HPD, closed)
C
08/23/2024
Violation issued (ECB, open)
Cranes and Derricks
08/23/2024
Violation issued (ECB, open)
Unknown
07/31/2024
Violation issued (HPD, closed)
C
07/31/2024
Violation issued (HPD, open)
B
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
C
07/31/2024
Violation issued (HPD, closed)
A
05/08/2024
Violation issued (HPD, closed)
B
05/08/2024
Violation issued (HPD, closed)
B
05/08/2024
Violation issued (HPD, open)
C
05/08/2024
Violation issued (HPD, closed)
B
05/08/2024
Violation issued (HPD, closed)
B
04/18/2024
Violation issued (HPD, closed)
A
10/30/2023
Violation issued (HPD, closed)
A
10/30/2023
Violation issued (HPD, open)
C
10/30/2023
Violation issued (HPD, open)
B
10/30/2023
Violation issued (HPD, closed)
B
09/20/2023
Violation issued (HPD, closed)
C
09/20/2023
Violation issued (HPD, closed)
C
09/20/2023
Violation issued (HPD, closed)
C
09/20/2023
Violation issued (HPD, open)
C
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
A
08/03/2023
Violation issued (HPD, closed)
B
08/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, closed)
A
07/03/2023
Violation issued (HPD, closed)
A
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, closed)
B
07/03/2023
Violation issued (HPD, open)
B
07/03/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, open)
B
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, closed)
B
05/25/2023
Violation issued (HPD, open)
B
05/03/2023
Violation issued (HPD, closed)
C
05/03/2023
Violation issued (HPD, closed)
C
03/31/2023
Violation issued (HPD, closed)
A
11/03/2022
Violation issued (HPD, closed)
I
05/31/2022
Signed off — Alteration
X00480364-I1
05/28/2022
Permit issued — Protection and Mechanical Methods
X00480364-I1-PM
04/15/2022
Signed off — Alteration
Installation of temporary construction fence 300 Lin ft. for DM # 220734481. No change in use egress or occupancy.
X00396962-I1
04/13/2022
Special inspection requirement — Final
Radomir Delic
03/16/2022
Signed off — Alteration
Sprinkler work filed in conjunction with NB Application #240286800
X00396183-I1
03/11/2022
Filed — Alteration
Installation of temporary construction fence 300 Lin ft. for DM # 220734481. No change in use egress or occupancy.
X00396962-P1
Latest 60 of 125 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offKODRA CONSTRUCTION CORP05/28/2022
DOB NOWStructuralSigned-offZEFI & CO. LLC09/30/2021
DOB NOWMechanical SystemsSigned-offZEFI & CO. LLC09/24/2021
DOB NOWCurb CutSigned-offZEFI & CO. LLC09/21/2021
DOB NOWSupported ScaffoldSigned-offTOPLINE NYC CONTRACTING05/21/2021
DOB NOWConstruction FenceSigned-offZEFI & CO. LLC04/24/2021
BIS—ISSUEDZEFI & CO. LLC08/16/2021
BIS—ISSUEDZEFI & CO. LLC01/12/2021
BIS—ISSUEDZEFI & CO. LLC12/11/2020
2 projects · most recent 01/24/2022
General Wiring
FiledStatusContractorScope
01/24/2022CompleteDENNISON ELECTRIC CORPGeneral Wiring
05/17/2021CompleteJAM ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/10/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
10/20/2021Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
04/13/2022FinalRadomir Delicprogress
01/27/2022Duct leakage testing MICHAEL KARANTINIDIS, P.E.energy_progress
01/27/2022Shutoff dampersMICHAEL KARANTINIDIS, P.E.energy_progress
01/27/2022HVAC and service water heating equipment MICHAEL KARANTINIDIS, P.E.energy_progress
01/27/2022Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
01/27/2022FinalRadomir Delicprogress
01/27/2022HVAC insulation and sealing MICHAEL KARANTINIDIS, P.E.energy_progress
01/27/2022HVAC and service water heating system controls MICHAEL KARANTINIDIS, P.E.energy_progress
01/27/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
11/16/2021Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
11/16/2021Fire-Resistant Penetrations and JointsRadomir Delicspecial
06/02/2021Fire-Resistant Penetrations and JointsRadomir Delicspecial
06/02/2021Fire-Resistant Penetrations and JointsRadomir Delicspecial
06/02/2021Sprinkler SystemsMICHAEL KARANTINIDIS, P.E.special
05/21/2021FinalRAFI HAMIDprogress
03/04/2021FinalRadomir Delicprogress
02/24/2021FinalSunil Saigalprogress
01/12/2021FinalRadomir Delicprogress
12/23/2020Fire-Resistant Penetrations and JointsRadomir Delicspecial
11/25/2020Energy Code Compliance InspectionsRadomir Delicprogress
11/25/2020Fire-Resistance Rated ConstructionRadomir Delicprogress
11/25/2020Concrete - Cast-In-PlaceRadomir Delicspecial
11/04/2020Structural Steel - DetailsRadomir Delicspecial
11/04/2020MasonryRadomir Delicspecial
11/04/2020Structural Cold-Formed SteelRadomir Delicspecial
Latest 25 of 26.
▾Documents — 194 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch - Construction Fence4
08/26/2026X00396962-P1Request digital key ↗
08/25/2026X00396189-I1Request digital key ↗
08/15/2026X00396189-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026X00396180-I1Request digital key ↗
08/15/2026X00396180-P2Request digital key ↗
08/15/2026X00396180-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
08/25/2026X00396176-I1Request digital key ↗
08/15/2026X00396176-P1Request digital key ↗
08/15/2026X00396176-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
08/25/2026X00396183-I1Request digital key ↗
08/15/2026X00396183-P1Request digital key ↗
08/15/2026X00396183-P2Request digital key ↗
▸DOB NOWPlans/Sketch2
08/25/2026X00480364-I1Request digital key ↗
08/25/2026X00526541-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
08/26/2026X00400105-I1Request digital key ↗
08/15/2026X00400105-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/25/2026X00396172-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026X00396141-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION18
05/04/2022240286800Open ↗
05/03/2022240286800Open ↗
05/03/2022240286800Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION3
01/12/2021240286800Open ↗
12/11/2020240286800Open ↗
12/11/2020240286800Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
01/08/2021240286800Open ↗
01/08/2021240286800Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
07/14/2021240286819Open ↗
04/01/2021240286819Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/06/2020240286800Open ↗
▸BISVERIFY TAX LOT1
11/16/2021240286800Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
10/07/2021240286800Open ↗
▸BISZONING DIAGRAM1
11/24/2020240286800Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
11/24/2020240286800Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/24/2020240286800Open ↗
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026X00396962-I1Open ↗
08/26/2026X00396962-P1Open ↗
08/25/2026X00396141-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026X00396189-I1Open ↗
08/31/2026X00480364-I1Open ↗
08/29/2026X00400105-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026X00396180-P1Open ↗
08/28/2026X00396172-I1Open ↗
08/28/2026X00396172-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
12/11/2020240286800Open ↗
12/11/2020240286800Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/12/2020240286800Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/07/2022240286800Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/07/2022240286800Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION(HCP/SCP)1
02/02/2022240286800Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST2
04/01/2021240286819Open ↗
11/12/2020240286800Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026X00400105-P1Open ↗
08/13/2026X00400105-I1Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/04/2020240286800Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/01/2021240286819Open ↗
▸BISSTREET TREE SIGNOFF1
11/19/2021240286800Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/12/2021240286800Open ↗
01/08/2021240286800Open ↗
11/12/2020240286800Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/11/2020240286800Open ↗
12/11/2020240286800Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/01/2022240286800Open ↗
▸BISINTERIOR LIGHTING POWER1
02/01/2022240286800Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/01/2022240286800Open ↗
▸BISFENESTRATION AREAS1
02/01/2022240286800Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
02/01/2022240286800Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/07/2022240286800Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/01/2022240286800Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/01/2022240286800Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/07/2022240286800Open ↗
▸BISELECTRIC MOTORS1
02/01/2022240286800Open ↗
▸BISLIGHTING CONTROLS1
02/01/2022240286800Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/12/2020240286800Open ↗
▸BISEXTERIOR LIGHTING POWER1
02/01/2022240286800Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
11/12/2020240286800Open ↗
11/12/2020240286800Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/12/2020240286800Open ↗
11/12/2020240286800Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/07/2022240286800Open ↗
▸BISSOIL REPORT1
11/24/2020240286800Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
11/12/2020240286800Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/12/2020240286800Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE11
05/04/2022240286800Open ↗
05/03/2022240286800Open ↗
05/03/2022240286800Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/28/2020240286800Open ↗
11/24/2020240286800Open ↗
11/24/2020240286800Open ↗
Showing 3 of 4 on file for this type
▸BISNYC DEP SD1(SPC) & SD2 (HPC) APPROVALS ARE REQUIRED PRIOR TO THE ISSUEING OF THE1ST TCO. WMS 21 DEC 20201
09/08/2021240286800Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE4
02/01/2021240286800Open ↗
01/27/2021240286800Open ↗
12/11/2020240286800Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT1
11/12/2020240286800Open ↗
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION12
02/02/2022240286800Open ↗
09/08/2021240286800Open ↗
09/08/2021240286800Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM2
10/16/2020240286800Open ↗
10/14/2020240286800Open ↗
▸BISEFILING COVER SHEET1
10/16/2020240286800Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/06/2020240286800Open ↗
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION2
07/14/2021240286819Open ↗
04/01/2021240286819Open ↗
▸BISSHUTOFF DAMPERS1
01/07/2022240286800Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
02/02/2022240286800Open ↗
▸BISLOWEST FLOOR ELEVATION1
01/07/2022240286800Open ↗
▸BISMAINTENANCE INFORMATION1
01/07/2022240286800Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/07/2022240286800Open ↗
▸BISTCO - Supporting Documents1
05/27/2022240286800Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
02/08/2022240286800Open ↗
▸BISDEP STROMWATER SWER CERTIFICATION(HCP/SCP)1
02/02/2022240286800Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
02/01/2022240286800Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
12/06/2021240286800Open ↗