← Back
Primarily 2 family with 1 store or office
7812 5 AVENUE
BROOKLYN · BIN 3150366
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R6BZoning
3,780 sfGross Floor Area
3Units
23 Open Violations 22 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 7812 5TH AVE REALTY LLC · 2,829 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
Plumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7812 5TH AVE REALTY LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2018$1.4M—Private party → 7812 5TH AVE REALTY LLC$370/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IAA ARCHITECTS PLLC305/06/2026
YOUN DESIGN CORP.107/03/2025
ASHRAF CORP112/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TASHEED BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YOUN DESIGN CORPGeneral Contractor107/08/2026
HYDRO MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOUN DESIGN CORP9534107/03/2025
Building Lifecycle
All (26)Filed (5)Permit Issued (2)Violation (1)Inspection (4)Objection (8)Special Inspection (6)
07/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/06/2026
Filed — Alteration
Filing for plumbing work at the existing Commercial space , Commercial cooking Equipments, Sinks and related piping in conjunction with MS #B01142651
B01148951-P2
04/20/2026
Permit issued — General Construction
B01248429-I1-GC
12/17/2025
Permit issued — Plumbing
B01148951-I1-PL
11/29/2025
Objection resolved — Addressed
11/29/2025
Special inspection requirement — Post-installed Anchors
JIN HWAN CHO
11/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIN HWAN CHO
11/25/2025
Objection raised — Inspections
11/15/2025
Objection resolved — Addressed
11/15/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Zoning
08/05/2025
Objection raised — Zoning
07/26/2025
Objection resolved — Addressed
07/15/2025
Objection raised — Scope
07/03/2025
Filed — Alteration
B01248429-I1
06/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
JIN HWAN CHO
02/05/2025
Filed — Alteration
Filing for plumbing work at the existing Commercial space , Commercial cooking Equipments, Sinks and related piping in conjunction with MS #B01142651
B01148951-P1
01/15/2025
Filed — Alteration
Filing for plumbing work at the existing Commercial space , Commercial cooking Equipments, Sinks and related piping in conjunction with MS #B01142651
B01148951-I1
01/15/2025
Violation issued (ECB, open)
Construction
12/31/2024
Filed — Alteration
FILING FOR MECHANICAL WORK AT THE EXISTING COMMERCIAL SPACE FOR INSTALLATION OF COMMERCIAL HOOD AND RELATED DUCTS TO ROOF.
B01142651-I1
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/14/2024
Special inspection requirement — Mechanical Systems
11/14/2024
Special inspection requirement — Final
Eric Foster
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offYOUN DESIGN CORP04/20/2026
DOB NOWPlumbingPermit IssuedHYDRO MECHANICAL INC12/17/2025
1 project · most recent 12/31/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/31/2024——Ventilation Systems
Ventilation
— van exhaust fan DYTON MODEL # 56JN96 4,800 CFM · Kitchen Exhaust ×1
1 project · most recent 05/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2026Permit IssuedHYDRO MECHANICAL INCGas, Water/Sanitary
1 project · most recent 12/28/2024
General Wiring
FiledStatusContractorScope
12/28/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/29/2025Post-installed AnchorsJIN HWAN CHOspecial
11/29/2025Structural Stability – Alterations of existing buildingsJIN HWAN CHOspecial
06/27/2025Tenant Protection Plan ComplianceJIN HWAN CHOspecial
11/19/2024Fire-Resistant Penetrations and Joints—special
11/14/2024Mechanical Systems—special
11/14/2024FinalEric Fosterprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01142651-I1Request digital key ↗
08/21/2026B01248429-I1Request digital key ↗
08/17/2026B01148951-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01148951-I1Open ↗
08/17/2026B01148951-P2Open ↗
08/17/2026B01148951-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01248429-I1Open ↗
08/29/2026B01248429-I1Open ↗
08/29/2026B01248429-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01142651-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01148951-I1Open ↗
08/17/2026B01148951-P1Open ↗
08/17/2026B01148951-P2Open ↗
Showing 3 of 4 on file for this type