7812 5TH AVENUE
BROOKLYN · Bay Ridge · BIN 3150366
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R6BZoning
3,780 sfGross Floor Area
3Units
20 Active Violations 19 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 7812 5th Ave Realty · 2,829 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Commercial space plumbing and cooking equipment installation1p · 2 filings · 13 docs
Site & exteriorProposed accessory awning1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7812 5th Ave Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/13/2018$1.4M—Private party → 7812 5TH AVE REALTY LLC$370/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Iaa Architects305/06/2026
Youn Design107/03/2025
Ashraf112/31/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tasheed Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Youn DesignGeneral Contractor107/08/2026
Hydro MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Youn Design9534107/03/2025
Building Lifecycle
All (26)Filed (5)Permit Issued (2)Violation (1)Inspection (4)Objection (8)Special Inspection (6)
07/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/06/2026
Filed — Alteration
Filing for plumbing work at the existing Commercial space , Commercial cooking Equipments, Sinks and related piping in conjunction with MS #B01142651
B01148951-P2
04/20/2026
Permit issued — General Construction
B01248429-I1-GC
12/17/2025
Permit issued — Plumbing
B01148951-I1-PL
11/29/2025
Objection resolved — Addressed
11/29/2025
Special inspection requirement — Post-installed Anchors
JIN HWAN CHO
11/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIN HWAN CHO
11/25/2025
Objection raised — Inspections
11/15/2025
Objection resolved — Addressed
11/15/2025
Objection resolved — Addressed
08/05/2025
Objection raised — Zoning
08/05/2025
Objection raised — Zoning
07/26/2025
Objection resolved — Addressed
07/15/2025
Objection raised — Scope
07/03/2025
Filed — Alteration
B01248429-I1
06/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
JIN HWAN CHO
02/05/2025
Filed — Alteration
Filing for plumbing work at the existing Commercial space , Commercial cooking Equipments, Sinks and related piping in conjunction with MS #B01142651
B01148951-P1
01/15/2025
Filed — Alteration
Filing for plumbing work at the existing Commercial space , Commercial cooking Equipments, Sinks and related piping in conjunction with MS #B01142651
B01148951-I1
01/15/2025
Violation issued (ECB, open)
Construction
12/31/2024
Filed — Alteration
FILING FOR MECHANICAL WORK AT THE EXISTING COMMERCIAL SPACE FOR INSTALLATION OF COMMERCIAL HOOD AND RELATED DUCTS TO ROOF.
B01142651-I1
11/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/14/2024
Special inspection requirement — Mechanical Systems
11/14/2024
Special inspection requirement — Final
Eric Foster
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offYoun Design04/20/2026
DOB NOWPlumbingPermit IssuedHydro Mechanical12/17/2025
1 project · most recent 12/31/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/31/2024——Ventilation Systems
Ventilation
— van exhaust fan DYTON MODEL # 56JN96 4,800 CFM · Kitchen Exhaust ×1
1 project · most recent 05/06/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2026Permit IssuedHydro MechanicalGas, Water/Sanitary
1 project · most recent 12/28/2024
General Wiring
FiledStatusContractorScope
12/28/2024Permit IssuedWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2026Pass-Final General Construction Non-Directive 14PassView ↗
06/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2026Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/29/2025Post-installed AnchorsJIN HWAN CHOspecial
11/29/2025Structural Stability – Alterations of existing buildingsJIN HWAN CHOspecial
06/27/2025Tenant Protection Plan ComplianceJIN HWAN CHOspecial
11/19/2024Fire-Resistant Penetrations and Joints—special
11/14/2024Mechanical Systems—special
11/14/2024FinalEric Fosterprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01142651-I1Request digital key ↗
08/21/2026B01248429-I1Request digital key ↗
08/17/2026B01148951-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01148951-I1Open ↗
08/17/2026B01148951-P2Open ↗
08/17/2026B01148951-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01248429-I1Open ↗
08/29/2026B01248429-I1Open ↗
08/29/2026B01248429-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01142651-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026B01148951-I1Open ↗
08/17/2026B01148951-P1Open ↗
08/17/2026B01148951-P2Open ↗
Showing 3 of 4 on file for this type