DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VOID BETWEEN THE WEST WALL AND THE WOODEN FLOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2, 3rd STORY
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2, 3rd STORY
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE SKYLITE RECESS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2, 3rd STORY
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE CERAMIC WALL TILES IN THE BATHROOM LOCATED AT APT 2, 3rd STORY
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE 1ST ROOM FROM EAST AND IN THE KITCHEN LOCATED AT APT 2, 3rd STORY
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD DOOR FRAME AT THE STRICKER PLATE ENTRANCE DOOR FROM THE VESTIBULE TO THE PUBLIC HALL , 1st STORY
HPD02/12/2002SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR BOARDS AT THE RADIATORS IN THE 1ST ROOM FROM WEST AND IN THE 1st ROOM FROM EAST LOCATED AT APT 2, 3rd STORY
Primarily 2 family with 1 store or office · 2,000 sf lot · 1.56 FAR built · Flood zone X