← Back
Primarily 2 family with 1 store or office
7816 5 AVENUE
BROOKLYN · BIN 3150367
💬 Discuss this project
1925Year Built
3Stories
S2Building Class
R6BZoning
3,300 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: LOVERDE ENTERPRISE LLC · 2,015 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 171p · 1 filing · 4 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 4 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LAVENDE ENTERPRISE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASIC GROUPS CORP703/16/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing307/08/2026
TREVOR DUNWELLElectrical103/21/2026
SMVP MGMT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY ACOM ENGINEERING PLLC7061703/16/2020
Building Lifecycle
All (77)Filed (7)Permit Issued (3)Signed Off (2)Violation (36)Special Inspection (29)
11/28/2023
Violation issued (HPD, closed)
I
11/17/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
10/26/2020
Permit issued — Mechanical Systems
B00245802-I1-MS
05/04/2020
Signed off — Alteration
PROPOSED OIL TO GAS CONVERSION IN A EXISTING 3 STORY BUILDING. AND INSTALL 2 HWH. BOILER WORK AS PER PLAN. PLUMBING WORK FILED UNDER B00245736. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245757-I1
03/30/2020
Signed off — Alteration
INSTALL 2 HWH AND 2 BOILER IN CEL. OIL TO GAS CONVERSION, PLUMBING WORK AS PER PLAN. BOILER WORK TO BE FIELD IN A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245736-I1
03/16/2020
Filed — Alteration
PROPOSED OIL TO GAS CONVERSION IN A EXISTING 3 STORY BUILDING. AND INSTALL 2 HWH. BOILER WORK AS PER PLAN. PLUMBING WORK FILED UNDER B00245736. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245757-P3
03/16/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
03/16/2020
Special inspection requirement — Heating Systems
YING JIANG
03/16/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
03/16/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
03/16/2020
Special inspection requirement — Maintenance information
YING JIANG
02/26/2020
Filed — Alteration
B00245802-I1
02/07/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
02/07/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
02/07/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
02/07/2020
Special inspection requirement — Fire-Resistance Rated Construction
YING JIANG
02/07/2020
Special inspection requirement — HVAC insulation and sealing
YING JIANG
02/07/2020
Special inspection requirement — Maintenance information
YING JIANG
02/07/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
02/06/2020
Filed — Alteration
PROPOSED OIL TO GAS CONVERSION IN A EXISTING 3 STORY BUILDING. AND INSTALL 2 HWH. BOILER WORK AS PER PLAN. PLUMBING WORK FILED UNDER B00245736. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245757-P2
02/06/2020
Filed — Alteration
INSTALL 2 HWH AND 2 BOILER IN CEL. OIL TO GAS CONVERSION, PLUMBING WORK AS PER PLAN. BOILER WORK TO BE FIELD IN A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245736-P1
02/06/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
02/06/2020
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
02/06/2020
Special inspection requirement — Fire-Resistance Rated Construction
YING JIANG
02/06/2020
Special inspection requirement — HVAC insulation and sealing
YING JIANG
02/06/2020
Special inspection requirement — Maintenance information
YING JIANG
02/06/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
02/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
02/06/2020
Special inspection requirement — Heating Systems
YING JIANG
02/06/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
02/06/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
02/06/2020
Special inspection requirement — Maintenance information
YING JIANG
02/06/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
01/31/2020
Filed — Alteration
PROPOSED OIL TO GAS CONVERSION IN A EXISTING 3 STORY BUILDING. AND INSTALL 2 HWH. BOILER WORK AS PER PLAN. PLUMBING WORK FILED UNDER B00245736. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245757-P1
01/31/2020
Special inspection requirement — Heating Systems
YING JIANG
01/31/2020
Special inspection requirement — Maintenance information
YING JIANG
01/31/2020
Special inspection requirement — HVAC and service water heating system controls
YING JIANG
01/31/2020
Special inspection requirement — HVAC and service water heating equipment
YING JIANG
01/31/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
01/22/2020
Permit issued — Boiler Equipment
B00245757-I1-BE
01/21/2020
Filed — Alteration
PROPOSED OIL TO GAS CONVERSION IN A EXISTING 3 STORY BUILDING. AND INSTALL 2 HWH. BOILER WORK AS PER PLAN. PLUMBING WORK FILED UNDER B00245736. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245757-I1
01/16/2020
Permit issued — Plumbing
B00245736-I1-PL
01/15/2020
Filed — Alteration
INSTALL 2 HWH AND 2 BOILER IN CEL. OIL TO GAS CONVERSION, PLUMBING WORK AS PER PLAN. BOILER WORK TO BE FIELD IN A SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00245736-I1
09/09/2019
Violation issued (HPD, closed)
B
03/12/2019
Violation issued (ECB, closed)
Construction
01/28/2019
Violation issued (HPD, closed)
I
01/24/2019
Violation issued (HPD, closed)
C
01/24/2019
Violation issued (HPD, closed)
C
01/24/2019
Violation issued (HPD, closed)
B
01/24/2019
Violation issued (HPD, closed)
B
01/24/2019
Violation issued (HPD, closed)
C
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/12/2011
Violation issued (ECB, closed)
Construction
07/12/2011
Violation issued (ECB, closed)
Construction
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSMVP MGMT INC10/26/2020
DOB NOWBoiler EquipmentPermit IssuedT & T PLUMBING INC01/22/2020
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/16/2020
BISOTISSUEDOWNER06/07/2011
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/16/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
03/16/2020Heating SystemsYING JIANGspecial
03/16/2020HVAC and service water heating equipment YING JIANGenergy_progress
03/16/2020HVAC and service water heating system controls YING JIANGenergy_progress
03/16/2020Maintenance informationYING JIANGenergy_progress
02/07/2020HVAC and service water heating system controls YING JIANGenergy_progress
02/07/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
02/07/2020Energy Code Compliance InspectionsYING JIANGprogress
02/07/2020Fire-Resistance Rated ConstructionYING JIANGprogress
02/07/2020HVAC insulation and sealing YING JIANGenergy_progress
02/07/2020Maintenance informationYING JIANGenergy_progress
02/07/2020HVAC and service water heating equipment YING JIANGenergy_progress
02/06/2020HVAC and service water heating equipment YING JIANGenergy_progress
02/06/2020Energy Code Compliance InspectionsYING JIANGprogress
02/06/2020Fire-Resistance Rated ConstructionYING JIANGprogress
02/06/2020HVAC insulation and sealing YING JIANGenergy_progress
02/06/2020Maintenance informationYING JIANGenergy_progress
02/06/2020HVAC and service water heating system controls YING JIANGenergy_progress
02/06/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
02/06/2020Heating SystemsYING JIANGspecial
02/06/2020HVAC and service water heating system controls YING JIANGenergy_progress
02/06/2020HVAC and service water heating equipment YING JIANGenergy_progress
02/06/2020Maintenance informationYING JIANGenergy_progress
02/06/2020Fire-Resistant Penetrations and JointsYING JIANGspecial
01/31/2020Heating SystemsYING JIANGspecial
Latest 25 of 29.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/02/2026B00245757-P3Request digital key ↗
09/02/2026B00245757-I1Request digital key ↗
08/15/2026B00245757-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00245736-I1Request digital key ↗
08/15/2026B00245736-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00245802-I1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
06/09/2011320309215Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
05/24/2011320309215Open ↗
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B00245736-I1Open ↗
09/01/2026B00245736-I1Open ↗
09/01/2026B00245736-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B00245736-I1Open ↗
09/01/2026B00245736-P1Open ↗
08/23/2026B00245757-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00245757-I1Open ↗
08/13/2026B00245757-P2Open ↗
08/13/2026B00245736-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/24/2011320309215Open ↗
09/14/2011320309215Open ↗
05/24/2011320309215Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/24/2011320309215Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/24/2011320309215Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan7
08/13/2026B00245736-P1Open ↗
08/13/2026B00245757-P1Open ↗
08/13/2026B00245757-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00245736-P1Open ↗
08/13/2026B00245736-I1Open ↗
08/13/2026B00245757-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/24/2011320309215Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/24/2011320309215Open ↗
09/14/2011320309215Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/24/2011320309215Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/14/2011320309215Open ↗
05/24/2011320309215Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
09/14/2011320309215Open ↗
▸BISEFILING COVER SHEET1
05/24/2011320309215Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/24/2011320309215Open ↗