← Back
Factory, industrial, miscellaneous
7819 16TH AVENUE
BROOKLYN · BIN 3329047
💬 Discuss this project
1931Year Built
2Stories
F9Building Class
R5Zoning
3,672 sfGross Floor Area
3Units
64 Open Violations 61 unresolved · 3 paperwork only ▸FDNY Report ↗
Factory, industrial, miscellaneous · 2,000 sf lot · 1.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Floor 24p · 1 filing · 10 docs
Floor 14p · 1 filing · 10 docs
Cellar3p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KCS GROUP3207/08/2026
7819 FASHION INC103/22/2026
LEVEL 9 FASHION INC103/22/2026
DERY REALTY LLC103/22/2026
LE KATE FASHION INC103/22/2026
COCCARO203/21/2026
DOLLY REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK DESIGN ARCHITECTS, LLP1005/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK DESIGN ARCHITECT LLP2003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STM IMPROVEMENTGeneral Contractor507/08/2026
QMB PLUMBING & HEATING INCPlumbing307/08/2026
H-BUILDER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957304/17/2023
Building Lifecycle
All (111)Filed (10)Permit Issued (7)Signed Off (3)Violation (60)Inspection (6)Objection (4)Special Inspection (21)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/28/2023
Signed off — Alteration
APPLICATION IS FILED TO RENOVATE THE INTERIOR PARTITIONS AND FINISHES, STOREFRONT, AND STRUCTURAL ELEMENTS OF EXISTING BUILDING, WORK TO NEW MECHANICAL SYSTEMS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B08008584-I1
06/27/2023
Signed off — Alteration
PAA FILED TO MAKE CORRECTION TO BOILER INFO AND CHANGE TO 1 BOILER. S-2 FILING CREATED FOR 2ND BOILER NUMBER.
B07995308-I1
06/27/2023
Signed off — Alteration
Application is filed for the erection of a temporary construction fence for the replacement of an existing storefront assembly. No change to use, egress or occupancy
B08008440-I1
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/23/2023
Permit issued — Boiler Equipment
B07995308-S2-BE
05/19/2023
Filed — Alteration
PAA FILED TO MAKE CORRECTION TO BOILER INFO AND CHANGE TO 1 BOILER. S-2 FILING CREATED FOR 2ND BOILER NUMBER.
B07995308-S2
05/19/2023
Filed — Alteration
PAA FILED TO MAKE CORRECTION TO BOILER INFO AND CHANGE TO 1 BOILER. S-2 FILING CREATED FOR 2ND BOILER NUMBER.
B07995308-P2
05/17/2023
Permit issued — Boiler Equipment
B07995308-S1-BE
05/15/2023
Permit issued — General Construction
B00855469-I1-GC
05/01/2023
Filed — Alteration
PAA FILED TO MAKE CORRECTION TO BOILER INFO AND CHANGE TO 1 BOILER. S-2 FILING CREATED FOR 2ND BOILER NUMBER.
B07995308-S1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Special inspection requirement — Final
04/24/2023
Objection raised — Admin
04/24/2023
Objection resolved — Addressed
04/24/2023
Objection raised — Energy
04/24/2023
Objection resolved — Addressed
04/17/2023
Filed — Alteration
APPLICATION IS FILED FOR WORDING ONLY. AWNING STRUCTURE FILED UNDER B00855469. NO CHANGE TO USE, EGRESS, BULK, OR OCCUPANCY.
B00852653-I1
04/17/2023
Filed — Alteration
FILING FOR FRAMING STRUCTURE TO NEW AWNING FILED UNDER SIGN APPLICATION B00852653.
B00855469-I1
04/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/05/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Smerina
04/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
04/05/2023
Special inspection requirement — Final
Joseph Smerina
02/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/16/2023
Special inspection requirement — Structural Steel - Details
Joseph Smerina
02/16/2023
Special inspection requirement — Structural Cold-Formed Steel
Joseph Smerina
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
02/16/2023
Special inspection requirement — Mechanical Systems
Joseph Smerina
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joseph Smerina
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Joseph Smerina
02/16/2023
Special inspection requirement — Final
Joseph Smerina
02/16/2023
Special inspection requirement — Fenestration air leakage
Joseph Smerina
02/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Joseph Smerina
02/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Smerina
Latest 60 of 111 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offQMB PLUMBING & HEATING INC05/23/2023
DOB NOWBoiler EquipmentSigned-offQMB PLUMBING & HEATING INC05/17/2023
DOB NOWGeneral ConstructionSigned-offH-BUILDER INC05/15/2023
DOB NOWStructuralSigned-offSTM IMPROVEMENT12/02/2022
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC11/15/2022
DOB NOWStructuralSigned-offSTM IMPROVEMENT10/20/2022
DOB NOWConstruction FenceSigned-offSTM IMPROVEMENT10/20/2022
BIS—ISSUEDN/A11/06/2023
BIS—ISSUEDDOLLY REALTY02/24/1995
1 project · most recent 05/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/19/2023Signed-offQMB PLUMBING & HEATING INGas, Water/Sanitary
1 project · most recent 11/03/2022
General Wiring
FiledStatusContractorScope
11/03/2022CompleteI.P. ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2023Pass-Final Boiler Equipment InspectionPassView ↗
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/25/2023Final—progress
04/05/2023Tenant Protection Plan ComplianceJoseph Smerinaspecial
04/05/2023Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
04/05/2023FinalJoseph Smerinaprogress
02/16/2023Structural Steel - DetailsJoseph Smerinaspecial
02/16/2023Structural Cold-Formed SteelJoseph Smerinaspecial
02/16/2023Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
02/16/2023Mechanical SystemsJoseph Smerinaspecial
02/16/2023Structural Stability – Alterations of existing buildingsJoseph Smerinaspecial
02/16/2023Energy Code Compliance InspectionsJoseph Smerinaprogress
02/16/2023FinalJoseph Smerinaprogress
02/16/2023Fenestration air leakageJoseph Smerinaenergy_progress
02/16/2023Fenestration and door U-factor and product ratingsJoseph Smerinaenergy_progress
02/16/2023HVAC-R and service water piping design and insulationJoseph Smerinaenergy_progress
02/16/2023HVAC-R and service water heating equipmentJoseph Smerinaenergy_progress
02/16/2023Interior lighting powerJoseph Smerinaenergy_progress
02/16/2023HVAC-R and service water heating system controlsJoseph Smerinaenergy_progress
02/16/2023Lighting in dwelling unitsJoseph Smerinaenergy_progress
02/16/2023Maintenance informationJoseph Smerinaenergy_progress
02/16/2023Fenestration areasJoseph Smerinaenergy_progress
02/16/2023Lighting controlsJoseph Smerinaenergy_progress
▾Documents — 86 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/28/2026B08008584-P1Request digital key ↗
08/28/2026B08008584-I1Request digital key ↗
08/28/2026B07995308-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION12
12/11/2023321591960Open ↗
11/13/2023321591960Open ↗
10/28/2022321591960Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/09/2023321591960Open ↗
▸BISWORK PERMIT APPLICATION1
11/06/2023321591960Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING DIAGRAM2
11/30/2021321591960Open ↗
11/30/2021321591960Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
08/26/2021321591960Open ↗
03/12/2021322093079Open ↗
▸BISZONING EXHIBIT V: CERTIFICATION1
11/30/2021321591960Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/12/2021322093079Open ↗
▸BISVERIFY TAX LOT1
01/25/2024321591960Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/26/2021321591960Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
11/30/2021321591960Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/12/2021322093079Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
11/30/2021321591960Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B07995308-S2Open ↗
08/28/2026B07995308-P2Open ↗
08/28/2026B07995308-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B08008584-I1Open ↗
08/28/2026B08008584-I1Open ↗
08/25/2026B00855469-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026B08008584-I1Open ↗
08/28/2026B08008584-I1Open ↗
08/25/2026B00855469-I1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST1
08/26/2021321591960Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
11/30/2021321591960Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/22/2023321591960Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B07995308-I1Open ↗
08/28/2026B07995308-S2Open ↗
08/28/2026B07995308-P2Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/01/2009320002153Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/30/2021321591960Open ↗
08/26/2021321591960Open ↗
08/26/2020321591960Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
11/13/2023321591960Open ↗
11/12/2021321591960Open ↗
04/01/2009320002153Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/01/2009320002153Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
11/30/2021321591960Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/25/2024321591960Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
12/05/2023321591960Open ↗
09/22/2023321591960Open ↗
09/22/2023321591960Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
02/19/2021322093079Open ↗
04/01/2009320002153Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM6
08/26/2021321591960Open ↗
03/12/2021322093079Open ↗
03/12/2021322093079Open ↗
Showing 3 of 6 on file for this type