← Back
Primarily 2 family with 1 store or office
7819 17 AVENUE
BROOKLYN · Bensonhurst · BIN 3162124
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R5Zoning
3,135 sfGross Floor Area
3Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: J&E LUCKY CORP · 1,710 sf lot · 1.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 10 docs
Floor 18p · 2 filings · 20 docs
Cellar7p · 2 filings · 20 docs
Site & exterior1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J E LUCKY CORP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2020$1.4M—Private party → J&E LUCKY CORP$453/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN FENG, ARCHITECT205/10/2024
J&R DESIGN AND INSPECTION CORP.207/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH QUALITY 338803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
J&R DESIGN AND INSPECTION6637305/10/2024
NKM ENGINEERING PLLC6244112/12/2022
Building Lifecycle
All (55)Filed (4)Permit Issued (2)Signed Off (2)Violation (18)Inspection (3)Special Inspection (26)
11/24/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/04/2024
Violation issued (HPD, open)
I
05/16/2024
Signed off — Alteration
RENOVATION OF PROPOSED COMM. SPACE WITH,REPAIR/REPLACE/NEW PARTITION,WALL,FLOOR,CEILING,DOOR,WINDOW,STOREFRONT,AWNING,ROLLING GATE,PAINTING,MAKEUP AIR FAN,WALK-IN COOLER/FREEZER,ALSO INSTALL HVAC WITH STEEL BEAM AS PER PLAN.NO CHANGE IN USE,EGR. OR OCCUP.
B08052198-I1
05/13/2024
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
05/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
05/13/2024
Special inspection requirement — Masonry
NARESH MAHANGU
05/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
05/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
Chun Feng
05/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Chun Feng
05/13/2024
Special inspection requirement — Final
Chun Feng
05/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
05/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
05/13/2024
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
05/13/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
05/13/2024
Special inspection requirement — Fenestration areas
NARESH MAHANGU
05/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
05/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
05/10/2024
Filed — Alteration
RENOVATION OF PROPOSED COMM. SPACE WITH,REPAIR/REPLACE/NEW PARTITION,WALL,FLOOR,CEILING,DOOR,WINDOW,STOREFRONT,AWNING,ROLLING GATE,PAINTING,MAKEUP AIR FAN,WALK-IN COOLER/FREEZER,ALSO INSTALL HVAC WITH STEEL BEAM AS PER PLAN.NO CHANGE IN USE,EGR. OR OCCUP.
B08052198-P1
02/26/2024
Signed off — Alteration
RENOVATION OF EXISTING MIXED USE BUILDING WITH, REPLACE / NEW PLUMBING FIXTURE AND H.W.H.. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08052699-I1
11/28/2023
Violation issued (HPD, closed)
I
11/17/2023
Violation issued (ECB, closed)
Construction
09/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/31/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
07/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
Robert Truskosky
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
07/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
07/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
07/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
07/24/2023
Filed — Alteration
RENOVATION OF EXISTING MIXED USE BUILDING WITH, REPLACE / NEW PLUMBING FIXTURE AND H.W.H.. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08052699-P1
07/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
07/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
07/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
07/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2023
Permit issued — Plumbing
B08052699-I1-PL
02/20/2023
Filed — Alteration
RENOVATION OF EXISTING MIXED USE BUILDING WITH, REPLACE / NEW PLUMBING FIXTURE AND H.W.H.. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08052699-I1
12/13/2022
Permit issued — Mechanical Systems
B08052198-I1-GC-CX
12/12/2022
Filed — Alteration
RENOVATION OF PROPOSED COMM. SPACE WITH,REPAIR/REPLACE/NEW PARTITION,WALL,FLOOR,CEILING,DOOR,WINDOW,STOREFRONT,AWNING,ROLLING GATE,PAINTING,MAKEUP AIR FAN,WALK-IN COOLER/FREEZER,ALSO INSTALL HVAC WITH STEEL BEAM AS PER PLAN.NO CHANGE IN USE,EGR. OR OCCUP.
B08052198-I1
11/17/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (ECB, closed)
Construction
05/14/2005
Violation issued (HPD, closed)
B
05/14/2005
Violation issued (HPD, closed)
B
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.02/22/2023
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION12/13/2022
BISOTISSUEDSTUART ISER, INC03/15/2012
BISPLISSUEDNAT'L MECH. SVCS PLBG LLC03/15/2012
1 project · most recent 01/08/2024
General Wiring
FiledStatusContractorScope
01/08/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/13/2024Mechanical SystemsNARESH MAHANGUspecial
05/13/2024Tenant Protection Plan ComplianceNARESH MAHANGUspecial
05/13/2024MasonryNARESH MAHANGUspecial
05/13/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
05/13/2024Fire-Resistance Rated ConstructionChun Fengprogress
05/13/2024Energy Code Compliance InspectionsChun Fengprogress
05/13/2024FinalChun Fengprogress
05/13/2024HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
05/13/2024HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
05/13/2024Fenestration air leakageNARESH MAHANGUenergy_progress
05/13/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
05/13/2024Fenestration areasNARESH MAHANGUenergy_progress
05/13/2024HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
05/13/2024Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
07/25/2023Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
07/25/2023Tenant Protection Plan ComplianceRobert Truskoskyspecial
07/25/2023Energy Code Compliance InspectionsRobert Truskoskyprogress
07/25/2023HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
07/25/2023HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
07/25/2023HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
07/24/2023Tenant Protection Plan Compliance—special
07/24/2023Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
07/24/2023Energy Code Compliance InspectionsRobert Truskoskyprogress
07/24/2023HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
07/24/2023HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
Latest 25 of 26.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B08052198-P1Request digital key ↗
08/28/2026B08052198-I1Request digital key ↗
08/27/2026B08052699-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
03/19/2012320448486Open ↗
03/19/2012320448486Open ↗
03/19/2012320448486Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/19/2012320448486Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
08/30/2026B08052699-P1Open ↗
08/30/2026B08052699-P1Open ↗
08/25/2026B08052699-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/30/2026B08052699-P1Open ↗
08/25/2026B08052699-I1Open ↗
08/25/2026B08052699-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B08052198-I1Open ↗
08/28/2026B08052198-P1Open ↗
08/27/2026B08052699-P1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/19/2012320448486Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/19/2012320448486Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/19/2012320448486Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE1
06/04/2012320448486Open ↗
▸BISSCHEDULE B - PLUMBING1
03/19/2012320448486Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/19/2012320448486Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B08052198-I1Open ↗
08/28/2026B08052198-P1Open ↗
08/27/2026B08052699-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/01/2020320448486Open ↗
10/01/2020320448486Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/01/2020320448486Open ↗
09/09/2020320448486Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/01/2020320448486Open ↗
10/01/2020320448486Open ↗
09/09/2020320448486Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
03/19/2012320448486Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/01/2020320448486Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/09/2020320448486Open ↗
03/19/2012320448486Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/19/2012320448486Open ↗