← Back
Primarily 3 family with 1 store or office
782 46 STREET
BROOKLYN · BIN 3012064
💬 Discuss this project
1925Year Built
4Stories
S3Building Class
R6Zoning
8,056 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 782 46 MGT INC. · 2,003 sf lot · 4.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Penthouse2p · 1 filing · 20 docs
Floor 44p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
782 46 MGT3909/13/2026
SD DESIGN STUDIO504/09/2026
TLS CONSTRUCTION GROUP I*203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/23/2021$1.7M—Private party → 782 46 MGT INC.$207/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1103/21/2026
JIAN ENGINEERING PLLC109/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TLS CONSTRUCTION GROUP I*General Contractor904/09/2026
AMC PLBG, HTG & CLNG, INCPlumbing407/08/2026
ACER CONSTRUCTION INCGeneral Contractor204/09/2026
A.C. MORGAN ELECTRICElectrical103/22/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
HF GROUP PLMBG & SPNKLERFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC73971103/21/2026
Building Lifecycle
All (66)Filed (12)Permit Issued (15)Signed Off (7)Violation (2)Special Inspection (30)
07/17/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-S6
05/03/2026
Special inspection requirement — Fenestration air leakage
JIAN DENG
05/03/2026
Special inspection requirement — Maintenance information
JIAN DENG
05/03/2026
Special inspection requirement — Insulation placement and R values
JIAN DENG
05/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
05/03/2026
Special inspection requirement — Metering
JIAN DENG
05/03/2026
Special inspection requirement — Interior lighting power
JIAN DENG
05/03/2026
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
05/03/2026
Special inspection requirement — Lighting controls
JIAN DENG
05/03/2026
Special inspection requirement — Lighting in dwelling units
JIAN DENG
05/03/2026
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
05/03/2026
Special inspection requirement — Exterior lighting power
JIAN DENG
05/03/2026
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
05/03/2026
Special inspection requirement — Fenestration areas
JIAN DENG
05/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
05/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
05/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
05/03/2026
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
05/03/2026
Special inspection requirement — Electrical motors and elevators
JIAN DENG
05/03/2026
Special inspection requirement — Masonry
JIAN DENG
05/03/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
JIAN DENG
04/30/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-S7
04/21/2026
Permit issued — Sprinklers
B00803738-S7-EW-SP
04/03/2026
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD SIDEWALK SHED WORK IN CONJUNCTION WITH D.O.B. ALT-CO NB APPLICATION #: B00939202. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939202-I1
03/21/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-P4
03/13/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-Z2
03/11/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-S5
03/02/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-S9
03/02/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-S8
10/03/2025
Permit issued — Sprinklers
B00803738-S7-EW-SP
09/05/2025
Permit issued — Plumbing
B00803738-S6-PL
04/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
04/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
04/10/2025
Special inspection requirement — Maintenance information
JIAN DENG
04/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
04/10/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
04/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
03/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-P3
03/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-P1
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
03/05/2025
Special inspection requirement — Maintenance information
JIAN DENG
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
11/07/2024
Permit issued — Boiler Equipment
B00803738-Z2-BE
10/24/2024
Violation issued (ECB, closed)
Construction
08/20/2024
Permit issued — General Construction
B00803738-I1-GC
08/16/2024
Permit issued — Construction Fence
B00803738-S5-FN
01/10/2024
Violation issued (ECB, closed)
Construction
12/20/2023
Permit issued — Plumbing
B00803738-S6-PL
11/27/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-Z2
10/13/2023
Permit issued — Sidewalk Shed
B00939202-I1-SH
09/26/2023
Permit issued — Sidewalk Shed
B00939202-I1-SH
09/25/2023
Filed — Alteration
THIS APPLICATION IS FILED TO ADD SIDEWALK SHED WORK IN CONJUNCTION WITH D.O.B. ALT-CO NB APPLICATION #: B00939202. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00939202-I1
08/16/2023
Permit issued — General Construction
B00803738-I1-GC
07/06/2023
Permit issued — Structural
B00803738-S9-ST
07/06/2023
Permit issued — Foundation
B00803738-S8-FO-EA
06/27/2023
Permit issued — General Construction
B00803738-I1-GC
06/15/2023
Permit issued — Plumbing
B00803738-S6-PL
06/09/2023
Permit issued — Construction Fence
B00803738-S5-FN
04/18/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
SUBSEQUENT FILING FOR GAS & PLUMBING WORK FOR INSTALLING NEW GAS EQUIPMENTS AND NEW PLUMING FIXTURES AS PLAN. IN CONJUNCTION WITH ALT CO JOB#B00803738-I1.
B00803738-Z1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offHF GROUP PLMBG & SPNKLER04/21/2026
DOB NOWSprinklersSigned-offBLETSAS P&H CORP10/03/2025
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC09/05/2025
DOB NOWBoiler EquipmentSigned-offAMC PLBG, HTG & CLNG, INC11/07/2024
DOB NOWGeneral ConstructionPermit IssuedTLS CONSTRUCTION GROUP I*08/20/2024
DOB NOWConstruction FenceSigned-offTLS CONSTRUCTION GROUP I*08/16/2024
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC12/20/2023
DOB NOWSidewalk ShedSigned-offACER CONSTRUCTION INC10/13/2023
DOB NOWSidewalk ShedSigned-offACER CONSTRUCTION INC09/26/2023
DOB NOWGeneral ConstructionPermit IssuedTLS CONSTRUCTION GROUP I*08/16/2023
DOB NOWStructuralSigned-offTLS CONSTRUCTION GROUP I*07/06/2023
DOB NOWFoundationSigned-offTLS CONSTRUCTION GROUP I*07/06/2023
DOB NOWGeneral ConstructionPermit IssuedTLS CONSTRUCTION GROUP I*06/27/2023
DOB NOWPlumbingSigned-offAMC PLBG, HTG & CLNG, INC06/15/2023
DOB NOWConstruction FenceSigned-offTLS CONSTRUCTION GROUP I*06/09/2023
1 project · most recent 03/21/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/21/2026Signed-offAMC PLBG, HTG & CLNG, INCGas, Storm, Water/Sanitary
4 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026CompleteGOODALL ELECTRIC CORP—
02/05/2026CompleteGOODALL ELECTRIC CORPGeneral Wiring
11/07/2024CompleteGOODALL ELECTRIC CORP—
10/15/2023Permit IssuedGOODALL ELECTRIC CORP—
1 project · most recent 03/21/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/21/2026Signed-offHF GROUP PLMBG & SPNKLERSteel, Concrete, Masonry
1 project · most recent 03/21/2026
Fence
FiledStatusContractorScope
03/21/2026Signed-offHF GROUP PLMBG & SPNKLERFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/06/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
05/03/2026Construction Operations Influencing Adjacent StructuresJIAN DENGspecial
05/03/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
05/03/2026Concrete - Cast-In-PlaceJIAN DENGspecial
05/03/2026Structural Stability – Alterations of existing buildingsJIAN DENGspecial
05/03/2026Electrical motors and elevatorsJIAN DENGenergy_progress
05/03/2026Fenestration areasJIAN DENGenergy_progress
05/03/2026Protection of exposed foundation insulationJIAN DENGenergy_progress
05/03/2026Fire-Resistance Rated ConstructionJIAN DENGprogress
05/03/2026Energy Code Compliance InspectionsJIAN DENGprogress
05/03/2026MasonryJIAN DENGspecial
05/03/2026MeteringJIAN DENGenergy_progress
05/03/2026Exterior lighting powerJIAN DENGenergy_progress
05/03/2026Fenestration air leakageJIAN DENGenergy_progress
05/03/2026Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
05/03/2026Air barrier - visual inspectionJIAN DENGenergy_progress
05/03/2026Interior lighting powerJIAN DENGenergy_progress
05/03/2026Maintenance informationJIAN DENGenergy_progress
05/03/2026Lighting in dwelling unitsJIAN DENGenergy_progress
05/03/2026Insulation placement and R valuesJIAN DENGenergy_progress
05/03/2026Lighting controlsJIAN DENGenergy_progress
04/10/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
04/10/2025Energy Code Compliance InspectionsJIAN DENGprogress
04/10/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
04/10/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
04/10/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
Latest 25 of 74.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026B00939202-I1Request digital key ↗
08/17/2026B00803738-Z2Request digital key ↗
08/17/2026B00803738-S7Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-I1Open ↗
08/14/2026B00803738-P4Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-I1Open ↗
08/14/2026B00803738-P4Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B00803738-I1Open ↗
▸Seals & Professional Certifications86
▸DOB NOWProgress Inspector Seal & Signature50
09/02/2026B00803738-P3Open ↗
09/02/2026B00803738-P3Open ↗
09/02/2026B00803738-P3Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature24
09/02/2026B00803738-P3Open ↗
09/01/2026B00803738-S7Open ↗
09/01/2026B00803738-S7Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/17/2026B00803738-S9Open ↗
08/17/2026B00803738-Z1Open ↗
08/17/2026B00803738-P1Open ↗
Showing 3 of 12 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-I1Open ↗
08/14/2026B00803738-P4Open ↗
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B00803738-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026B00803738-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026B00803738-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/17/2026B00803738-Z2Open ↗
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-S6Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B00803738-S8Open ↗
▸DOB NOWSOIL REPORT1
08/15/2026B00803738-S8Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial3
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-I1Open ↗
08/14/2026B00803738-P4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-I1Open ↗
08/14/2026B00803738-P4Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026B00803738-P1Open ↗
08/17/2026B00803738-I1Open ↗
08/14/2026B00803738-P4Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B00803738-S8Open ↗
▸DOB NOWFinal Survey1
08/17/2026B00803738-I1Open ↗