782 WEST END AVENUE
MANHATTAN · BIN 1056391
💬 Discuss this project
1913Year Built
12Stories
D4Building Class
R8Zoning
53,971 sfGross Floor Area
43Units
LL97 CoveredRent Stabilized34 Active Violations 33 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator cooperative · Owner of record: 782 West End Avenue Owners · 5,042 sf lot · 10.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 8Unit 823p · 1 filing · 9 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 339p · 2 filings · 20 docs
Floor 2
Floor 1
Cellar14p · 1 filing · 17 docs
Sub-CellarOil tank room repairs1 filing · 6 docs
Site & exteriorJerrick Associates, INC.5p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
782 Westend Ave Owners Co2803/22/2026
Solstice Residential Group607/08/2026
S & E Group303/21/2026
Sequoia Property303/21/2026
782W Owners Corp Sequoia Properties M303/21/2026
Gotham Construction Co103/21/2026
Not on File Owner of103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Zaidi Christo Design203/05/2026
Cowley Engineering112/09/2024
David Schwartz RA204/01/2024
Jason E Roberts501/23/2024
Green Design102/18/2021
Scalar Architecture107/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Theresa Voltaggio103/21/2026
Self Employed203/21/2026
Code1003/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prishtina ConstructionGeneral Contractor603/21/2026
Practical Plumbing & HeatingPlumbing207/08/2026
MXM ContractorsGeneral Contractor203/21/2026
Xinos ConstructionGeneral Contractor203/21/2026
Jerrick AssociatesScaffold203/21/2026
Phoenix Sutton STRScaffold203/21/2026
C.Q. Electr'l ContractingElectrical103/21/2026
Quizhpe ContractingGeneral Contractor107/08/2026
Alef Electrical ContractingElectrical103/21/2026
Elpo Electrical ContgElectrical103/22/2026
Norway ElectricElectrical103/21/2026
Cresco ElectricalElectrical103/21/2026
Peter Miceli PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Project Tactical Solution5859203/05/2026
AG Engineering8899112/09/2024
Cowley Engineering186112/09/2024
Buildtech Engineering6369104/01/2024
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
07/23/2026
Signed off — Alteration
Minor Interior Renovation at superintendent apt in Cellar. Remove and construct non-bearing and non-structural partitions. All work as per plan. No change in use, egress and occupancy.
M01124217-I1
05/06/2026
Elevator Category 1 inspection report filed
04/11/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Max Lee
221 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPeter Miceli Plumbing08/04/2025
DOB NOWGeneral ConstructionSigned-offMXM Contractors06/17/2025
DOB NOWGeneral ConstructionSigned-offQuizhpe Contracting06/12/2025
DOB NOWGeneral ConstructionPermit IssuedXinos Construction01/27/2025
DOB NOWPlumbingSigned-offPractical Plumbing & Heating11/01/2023
DOB NOWGeneral ConstructionSigned-offPrishtina Construction03/07/2023
DOB NOWPlumbingSigned-offPractical Plumbing & Heating09/23/2022
DOB NOWGeneral ConstructionSigned-offPrishtina Construction09/13/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR02/18/2021
DOB NOWSidewalk ShedSigned-offGE 2A Construction07/19/2019
BISOTISSUEDJerrick Associates08/08/2019
BISPLISSUEDWynne Plumbing & Heating05/10/2018
BISOTISSUEDPrishtina Construction04/10/2018
BISPLISSUEDWNW & Sons Plumbing & Heating09/13/2017
BISOTISSUEDAlbeto08/28/2017
BISPLISSUEDAccurate Mechanical10/05/2015
BISOTISSUEDGotham General Carpentry08/11/2015
BISOTISSUEDAG Classic05/16/2013
BISPLISSUEDMega Plumbing04/23/2013
BISOTISSUEDAG Classic04/03/2013
BISOTISSUEDJerrick Associates03/08/2012
BISPLISSUEDWater Works Mechanical02/06/2012
BISOTISSUEDA D Renovation Solution01/10/2012
BISPLISSUEDCharles J. Dehart JR P&H11/28/2011
BISOTISSUEDMetro Tristate Construction11/16/2011
BISPLISSUEDWasoff Plumbing & Utility Co08/01/2011
BISPLISSUEDDemar Plumbing05/24/2011
BISOTISSUEDJerrick Associates03/21/2011
BISEQISSUEDJerrick Associates03/11/2011
BISEQISSUEDJerrick Associates12/30/2010
BISPLISSUEDDemar Plumbing02/10/2010
BISBLISSUEDHI-Tech Heating02/10/2010
BISOTISSUEDWonder Works Construction02/18/2009
BISEQISSUEDS&E Bridge & Scaffold04/14/2008
BISEQISSUEDS&E Bridge & Scaffold04/08/2008
BISOTISSUEDWonder Works Construction02/15/2008
BISEQISSUEDJerrick Associates01/14/2008
BISOTISSUEDWonder Works Construction05/18/2007
BISOTISSUEDFountainhead Construction05/15/2007
BISEQISSUEDJerrick Associates01/18/2007
+ 13 more permits on file
7 projects · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025CompleteCresco ElectricalGeneral Wiring
10/28/2022CompleteArgon ElectricalGeneral Wiring
01/27/2021CompleteElpo Electrical Contg—
10/20/2020Permit IssuedBelmont ElectricalGeneral Wiring
07/11/2019CompleteBorowide Elect'l Contractors—
12/06/2018CompleteBelmont ElectricalGeneral Wiring
07/16/2018CompleteBelmont ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/10/2026Energy Code Compliance InspectionsMax Leeprogress
04/10/2026FinalROBERT CHRISTOprogress
04/10/2026Lighting in dwelling unitsMax Leeenergy_progress
04/10/2026Fire-Resistant Penetrations and JointsMax Leespecial
02/04/2026Fire-Resistant Penetrations and JointsMax Leespecial
02/04/2026Lighting in dwelling unitsMax Leeenergy_progress
02/04/2026FinalROBERT CHRISTOprogress
02/04/2026Energy Code Compliance InspectionsMax Leeprogress
12/02/2024FinalEric Cowleyprogress
12/02/2024Tenant Protection Plan ComplianceARIEL GOLSHANspecial
12/02/2024Structural Stability – Alterations of existing buildingsEric Cowleyspecial
03/17/2024Fire-Resistant Penetrations and JointsLuis Pichardospecial
09/12/2022FinalJASON ROBERTSprogress
08/26/2022FinalJASON ROBERTSprogress
304 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account