← Back
Primarily 2 family with 1 store or office
783 ST JOHNS PLACE
BROOKLYN · BIN 3031898
💬 Discuss this project
1910Year Built
2Stories
S2Building Class
R6BZoning
1,800 sfGross Floor Area
3Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Primarily 2 family with 1 store or office · Owner of record: 783 ST. JOHNS 123 LLC · 1,667 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AJ CONSTRUCTION DESIGN GROUP109/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/20/2025$927K—Private party → 783 ST. JOHNS 123 LLC$515/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EAB ENGINEERING PC206/08/2026
Building Lifecycle
All (28)Filed (2)Violation (1)Objection (10)Special Inspection (15)
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Resolved
08/11/2026
Objection raised — Admin
08/11/2026
Objection raised — Fire_Protection
08/11/2026
Objection raised — Scope
08/11/2026
Objection raised — Other
08/11/2026
Objection raised — Admin
06/08/2026
Filed — Alteration CO
RENOVATION OF EXISITNG TWO FAMILY DWELLING AND COMMERCIAL MIXED USE BUILDING AND CONVERSION TO ONE FAMILY DWELLIGN. OBTAIN NEW CERTIFICATE OF OCCUPANCY
B01407525-S2
06/08/2026
Filed — Alteration CO
RENOVATION OF EXISITNG TWO FAMILY DWELLING AND COMMERCIAL MIXED USE BUILDING AND CONVERSION TO ONE FAMILY DWELLIGN. OBTAIN NEW CERTIFICATE OF OCCUPANCY
B01407525-I1
05/27/2026
Special inspection requirement — Maintenance information
05/27/2026
Special inspection requirement — Fenestration areas
05/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/27/2026
Special inspection requirement — Insulation placement and R values
05/27/2026
Special inspection requirement — Fenestration air leakage
05/27/2026
Special inspection requirement — Interior lighting power
05/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/27/2026
Special inspection requirement — Air barrier - visual inspection
05/26/2026
Special inspection requirement — Structural Cold-Formed Steel
05/26/2026
Special inspection requirement — Structural Steel - Details
05/26/2026
Special inspection requirement — Mechanical Systems
05/26/2026
Special inspection requirement — Final
05/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/01/2010
Violation issued (ECB, open)
Unknown
Nothing on file for this building.
1 project · most recent 06/08/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/08/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAMHZ2, MXZ-3C30NAHZ4-U1 78,514 BTU · Heat Pump Outdoor ×2
1 project · most recent 06/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/08/2026——Gas, Water/Sanitary
1 project · most recent 06/08/2026
Steel Wood
FiledStatusContractorScope
06/08/2026——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
05/27/2026Maintenance information—energy_progress
05/27/2026Fenestration areas—energy_progress
05/27/2026HVAC-R and service water heating system controls—energy_progress
05/27/2026Insulation placement and R values—energy_progress
05/27/2026Fenestration air leakage—energy_progress
05/27/2026Interior lighting power—energy_progress
05/27/2026Fenestration and door U-factor and product ratings—energy_progress
05/27/2026HVAC-R and service water heating equipment—energy_progress
05/27/2026HVAC-R and service water piping design and insulation—energy_progress
05/27/2026Air barrier - visual inspection—energy_progress
05/26/2026Structural Cold-Formed Steel—special
05/26/2026Structural Steel - Details—special
05/26/2026Mechanical Systems—special
05/26/2026Final—progress
05/26/2026Structural Stability – Alterations of existing buildings—special
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026B01407525-S2Request digital key ↗
08/14/2026B01407525-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026B01407525-I1Open ↗
08/16/2026B01407525-S2Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01407525-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026B01407525-S2Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/14/2026B01407525-I1Open ↗