← Back
Single or multiple dwelling with stores or offices
785 BURKE AVENUE
BRONX · BIN 2056368
💬 Discuss this project
1931Year Built
3Stories
S9Building Class
R6Zoning
5,550 sfGross Floor Area
6Units
Rent Stabilized134 Open Violations 132 unresolved · 2 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: 785 BRUKE AVE REALTY, LLC · 2,825 sf lot · 1.96 FAR built · Flood zone X
Locations of Work
Fire Protection
Roof2p · 1 filing · 3 docs
Floor 11p · 1 filing · 3 docs
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
785 BRUKE AVE REALTY, LLC903/22/2026
785 BURKE REALTY LLC503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/08/2018$1.3M—785 BURKE REALTY LLC → 785 BRUKE AVE REALTY, LLC$234/sf building
08/12/2015$850K—785 BURKE LLC → 785 BURKE REALTY LLC$153/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYRON HALL ENGINEERING LLC509/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIO CASTROElectrical103/21/2026
Building Lifecycle
All (155)Filed (5)Violation (60)Objection (64)Special Inspection (26)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
B
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
B
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
B
09/14/2025
Violation issued (HPD, closed)
C
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
C
09/14/2025
Violation issued (HPD, open)
B
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, closed)
C
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, open)
A
09/14/2025
Violation issued (HPD, closed)
C
06/04/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/29/2024
Violation issued (ECB, open)
Boilers
04/02/2024
Violation issued (HPD, closed)
A
02/07/2024
Violation issued (ECB, closed)
Construction
01/22/2024
Objection resolved — Resolved
01/22/2024
Objection resolved — Resolved
01/22/2024
Objection resolved — Resolved
01/22/2024
Objection resolved — Resolved
01/22/2024
Objection resolved — Resolved
01/02/2024
Objection resolved — Addressed
01/02/2024
Objection resolved — Addressed
11/06/2023
Objection resolved — Resolved
09/27/2023
Objection raised — Other
09/16/2023
Objection resolved — Addressed
09/12/2023
Objection raised — Scope
09/08/2023
Objection raised — Inspections
09/08/2023
Objection raised — Admin
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Inspections
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Inspections
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Admin
09/08/2023
Objection raised — Admin
09/07/2023
Filed — Alteration
REPLACE OIL BOILER WITH GAS BOILER, INSTALL WASTE LINES AND VENT LINES FOR NEW SANITY FIXTURES IN NEWLY CREATED APARTMENTS CAP AND RELOCATE EXISTING FIXTURES WITH NEW.INSTALL NEW GAS PIPINGS, GAS METERS AND GAS STOVE IN EXISTING APARTMENTS.
X00925468-I1
09/07/2023
Filed — Alteration
INSTALL SPRINKLER PIPING HEADS AS PER PLANS.
X00925222-I1
09/07/2023
Filed — Alteration
PROPOSE TO REMOVE OIL BURNER AND REPLACE WITH GAS FIRED SYSTEM ,INSTALL RADIATORS AND SPLIT TYPE AC UNITS IN NEWLY CREATED APARTMENTS AS PER PLANS.
X00925255-I1
09/03/2023
Objection resolved — Addressed
09/03/2023
Objection resolved — Addressed
08/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
08/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
08/25/2023
Special inspection requirement — Shutoff dampers
08/25/2023
Special inspection requirement — Mechanical Systems
08/25/2023
Special inspection requirement — Final
08/08/2023
Objection resolved — Resolved
08/08/2023
Objection resolved — Resolved
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/12/2002
1 job · most recent 09/07/2023
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/07/2023——Heating Systems, Ventilation Systems
Heating
__Junk__ 165 243 14,321 BTU · Boiler ×1
Ventilation
Jencofan 764 JENNCO 7,563 CFM · Exhaust Fan ×8
1 job · most recent 09/07/2023
FiledStatusContractorScope
09/07/2023——46 heads
1 job · most recent 09/07/2023
Gas Water/Sanitary
FiledStatusContractorScope
09/07/2023——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
08/27/2023Fire-Resistant Penetrations and Joints—special
08/25/2023HVAC-R and service water heating system controls—energy_progress
08/25/2023HVAC-R and service water piping design and insulation—energy_progress
08/25/2023Shutoff dampers—energy_progress
08/25/2023Mechanical Systems—special
08/25/2023Final—progress
07/07/2023Tenant Protection Plan Compliance—special
06/29/2023Fire-Resistance Rated Construction—progress
06/29/2023Structural Stability – Alterations of existing buildings—special
06/29/2023Preliminary—progress
06/29/2023Structural Cold-Formed Steel—special
06/29/2023Structural Steel - Details—special
06/29/2023Final—progress
06/29/2023Footing and Foundation—progress
06/29/2023Protection of exposed foundation insulation—energy_progress
06/29/2023Subsurface Investigations (Borings/Test Pits)—special
05/22/2023Interior lighting power—energy_progress
05/22/2023Air barrier - visual inspection—energy_progress
05/22/2023Lighting controls—energy_progress
05/22/2023Fenestration areas—energy_progress
05/22/2023Lighting in dwelling units—energy_progress
05/22/2023Fenestration and door U-factor and product ratings—energy_progress
05/22/2023Fenestration air leakage—energy_progress
05/22/2023Tenant Protection Plan Compliance—special
05/22/2023Fire-Resistant Penetrations and Joints—special
Latest 25 of 26.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/22/2026X00925255-I1Request digital key ↗
08/22/2026X00925468-I1Request digital key ↗
08/15/2026X00925222-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026X00925255-I1Open ↗
08/22/2026X00925468-I1Open ↗
08/22/2026X00925222-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/22/2026X00925255-I1Open ↗
08/22/2026X00925468-I1Open ↗
08/15/2026X00925222-I1Open ↗