← Back
Five to six families
786 PRESIDENT STREET
BROOKLYN · BIN 3427239
💬 Discuss this project
1900Year Built
3Stories
C2Building Class
R6BZoning
7,000 sfGross Floor Area
6Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: TOWNHOUSE RENTAL VIII, L.L.C. · 3,475 sf lot · 2.01 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 31p · 2 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 11 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS3404/09/2026
ACE GROUP NY404/09/2026
TOWNHOUSE RENTAL VIII, L.L.C.203/22/2026
TOWNHOUSE RENTAL 7 LLC103/22/2026
EMCON GROUP203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/02/2024$8.9M—— → —$1,272/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AN SHEN MA ARCHITECT211/19/2025
VOLUME SPACE CONSULTING INC.111/04/2024
AUVER ARCHITECTURE D.P.C.1009/23/2024
POLISE CONSULTING ENGINEER909/22/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASA GROUP2403/21/2026
JM ZONING, LLC.703/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMCON GROUP INCGeneral Contractor904/09/2026
NEPTUNE MECHANICAL INCFire Protection107/08/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
METACOMET CONSTRUCTIONGeneral Contractor104/09/2026
FLINT MECHANICAL CORPPlumbing107/08/2026
NEPTUNE MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AN SHEN MA ARCHITECT2968211/19/2025
PSI AGENCY INC.2541309/22/2023
Building Lifecycle
All (154)Filed (22)Permit Issued (13)Signed Off (6)Violation (6)Inspection (11)Objection (66)Special Inspection (30)
12/24/2025
Signed off — Alteration
TO INSTALL (6) SIX SPLIT SYSTEM HEAT PUMP HVAC UNITS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01257750-I1
11/20/2025
Special inspection requirement — Permanent certificate
AN MA
11/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
11/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
11/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
11/20/2025
Special inspection requirement — Final
AN MA
11/20/2025
Special inspection requirement — Mechanical Systems
AN MA
11/20/2025
Special inspection requirement — Maintenance information
AN MA
11/19/2025
Filed — Alteration
TO INSTALL (6) SIX SPLIT SYSTEM HEAT PUMP HVAC UNITS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01257750-P2
11/19/2025
Special inspection requirement — Permanent certificate
AN MA
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
AN MA
11/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
AN MA
11/06/2025
Special inspection requirement — Mechanical Systems
AN MA
11/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
AN MA
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AN MA
11/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
AN MA
11/06/2025
Special inspection requirement — Final
AN MA
11/06/2025
Special inspection requirement — Maintenance information
AN MA
10/01/2025
Permit issued — Mechanical Systems
B01257750-I1-MS
09/04/2025
Filed — Alteration
TO INSTALL (6) SIX SPLIT SYSTEM HEAT PUMP HVAC UNITS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01257750-I1
05/29/2025
Violation issued (ECB, closed)
Construction
01/24/2025
Violation issued (HPD, closed)
C
11/06/2024
Permit issued — Sidewalk Shed
B01136801-I1-SH
11/04/2024
Filed — Alteration
B01136801-I1
09/30/2024
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
09/30/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MAURICIO ANDRADE
09/30/2024
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
09/30/2024
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
09/30/2024
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
09/30/2024
Special inspection requirement — Air barrier - visual inspection
MAURICIO ANDRADE
09/23/2024
Filed — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-A4
09/20/2024
Special inspection requirement — Air barrier - visual inspection
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
09/20/2024
Special inspection requirement — Insulation placement and R values
MAURICIO ANDRADE
05/09/2024
Filed — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-A3
04/18/2024
Violation issued (HPD, closed)
A
02/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2024
Filed — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-A2
01/04/2024
Filed — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-A1
11/22/2023
Signed off — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-S1
11/21/2023
Signed off — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-S3
11/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2023
Objection resolved — Addressed
11/06/2023
Signed off — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-S4
10/26/2023
Permit issued — Mechanical Systems
B00533405-S1-MS
10/19/2023
Signed off — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-S2
10/11/2023
Permit issued — General Construction
B00533405-I1-GC
10/11/2023
Permit issued — General Construction
B00533405-I1-GC
10/03/2023
Objection resolved — Addressed
09/26/2023
Objection raised — Other
09/22/2023
Filed — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-P9
09/22/2023
Objection raised — Structural
09/21/2023
Objection resolved — Addressed
09/18/2023
Objection raised — Scope
09/17/2023
Signed off — Alteration CO
RENOVATION & CONVERSION OF EXISTING CONVENT INTO 6-UNIT OLD-LAW TENEMENT AND REMOVE & INSTALL NEW INTERIOR NON-LOAD BEARING PARTITIONS & FINISHES AS PER PLANS. APPLICATION FILED TO SPLIT TAX LOT UNDER A SINGLE ZONING LOT. (786 PRESIDENT ST.)
B00533405-S5
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMETACOMET CONSTRUCTION10/01/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP11/06/2024
DOB NOWMechanical SystemsSigned-offEMCON GROUP INC10/26/2023
DOB NOWGeneral ConstructionPermit IssuedEMCON GROUP INC10/11/2023
DOB NOWGeneral ConstructionPermit IssuedEMCON GROUP INC10/11/2023
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP09/26/2022
DOB NOWSprinklersSigned-offBLETSAS P&H CORP09/22/2022
DOB NOWSprinklersSigned-offNEPTUNE MECHANICAL INC07/22/2022
DOB NOWStructuralSigned-offEMCON GROUP INC07/20/2022
DOB NOWEarth WorkSigned-offEMCON GROUP INC07/19/2022
DOB NOWPlumbingSigned-offNEPTUNE MECHANICAL INC06/15/2022
DOB NOWMechanical SystemsSigned-offEMCON GROUP INC06/14/2022
DOB NOWGeneral ConstructionPermit IssuedEMCON GROUP INC06/14/2022
BISBLISSUEDEAST COAST MECHANICAL LLC12/07/2000
1 project · most recent 09/23/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2024Signed-offEMCON GROUP INCAir Conditioning Systems, Ventilation Systems
Cooling
Friedrich KES12A33A 12,000 BTU · Ptac ×20
KEM18A34A 20,000 BTU · Ptac ×6
Ventilation
N/A n/a 12,000 BTU ×20
1 project · most recent 09/23/2024
Sprinkler System
FiledStatusContractorScope
09/23/2024Signed-offBLETSAS P&H CORPSprinkler System
1 project · most recent 09/23/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/23/2024Signed-offROLANDO MECHANICAL OF NYGas, Storm, Water/Sanitary
2 projects · most recent 07/17/2025
HVAC Wiring General Wiring
FiledStatusContractorScope
07/17/2025Permit IssuedZIN ELECTRICAL, INCHVAC Wiring
06/16/2022CompleteCONDE ELECTRIC INCGeneral Wiring
1 project · most recent 09/23/2024
Steel
FiledStatusContractorScope
09/23/2024Signed-offEMCON GROUP INCSteel
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
02/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/23/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
06/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/07/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/07/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
11/20/2025FinalAN MAprogress
11/20/2025Fire-Resistant Penetrations and JointsAN MAspecial
11/20/2025Mechanical SystemsAN MAspecial
11/20/2025Energy Code Compliance InspectionsAN MAprogress
11/20/2025Permanent certificateAN MAenergy_progress
11/20/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
11/20/2025HVAC-R and service water heating equipmentAN MAenergy_progress
11/20/2025HVAC-R and service water heating system controlsAN MAenergy_progress
11/20/2025Maintenance informationAN MAenergy_progress
11/19/2025Permanent certificateAN MAenergy_progress
11/06/2025HVAC-R and service water heating system controlsAN MAenergy_progress
11/06/2025Maintenance informationAN MAenergy_progress
11/06/2025HVAC-R and service water heating equipmentAN MAenergy_progress
11/06/2025Mechanical SystemsAN MAspecial
11/06/2025Fire-Resistant Penetrations and JointsAN MAspecial
11/06/2025Energy Code Compliance InspectionsAN MAprogress
11/06/2025FinalAN MAprogress
11/06/2025HVAC-R and service water piping design and insulationAN MAenergy_progress
09/30/2024Insulation placement and R valuesMAURICIO ANDRADEenergy_progress
09/30/2024Air barrier - visual inspectionMAURICIO ANDRADEenergy_progress
09/30/2024Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
09/30/2024Fenestration areasMAURICIO ANDRADEenergy_progress
09/30/2024Fenestration and door U-factor and product ratingsMAURICIO ANDRADEenergy_progress
09/30/2024Fenestration air leakageMAURICIO ANDRADEenergy_progress
09/20/2024Fenestration areasMAURICIO ANDRADEenergy_progress
Latest 25 of 74.
▾Documents — 104 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
08/31/2026B00533405-P4Request digital key ↗
08/31/2026B00533405-A3Request digital key ↗
08/31/2026B00533405-A2Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/06/2024301106568Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B00533405-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature24
09/23/2026B01257750-I1Open ↗
09/23/2026B01257750-I1Open ↗
09/23/2026B01257750-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/31/2026B00533405-A1Open ↗
08/31/2026B00533405-P9Open ↗
08/31/2026B00533405-P8Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/23/2026B01257750-I1Open ↗
09/22/2026B00533405-S1Open ↗
09/18/2026B00533405-S2Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/31/2026B00533405-A4Open ↗
08/31/2026B00533405-A3Open ↗
08/31/2026B00533405-A2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/14/2026B00533405-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B00533405-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026B00533405-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/31/2026B00533405-P5Open ↗
08/31/2026B00533405-P4Open ↗
08/19/2026B01257750-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/15/2026B00533405-S1Open ↗
08/15/2026B00533405-S2Open ↗
08/15/2026B00533405-S4Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/15/2026B00533405-S1Open ↗
08/14/2026B00533405-I1Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification2
08/31/2026B00533405-P4Open ↗
08/31/2026B00533405-P5Open ↗
▸DOB NOWFinal Survey1
08/14/2026B00533405-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B00533405-S5Open ↗