← Back
BuildNYC
Condo, office space
Park Madison
787 11TH AVENUE · BIN 1027156
💬 Discuss this project
1929Year Built
10Stories
RBBuilding Class
M2-4Zoning
369,656 sfGross Floor Area
6Units
LL97 Covered0 Active ViolationsFISP: SAFE
Condo, office space · Owner of record: Georgetown Eleventh Avenue Owners · 45,187 sf lot · 8.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMount Sinai Health System5 filings
RoofTrue North, Oxman Studio +119p · 10 filings · 20 docs
BulkheadTrue North, Oxman Studio8p · 5 filings · 20 docs
PenthouseMount Sinai Health System1p · 2 filings · 20 docs
Floor 12Temporary system scaffold installation1 filing · 2 docs
Floor 11Temporary system scaffold installation1 filing · 2 docs
Floor 10True North, Oxman Studio28p · 12 filings · 20 docs
Floor 9True North, Oxman Studio13p · 9 filings · 20 docs
Floor 8Mount Sinai Health System, 787 11th ASC7p · 9 filings · 10 docs
Floor 7787 11th ASC, Merritt Healthcare +239p · 15 filings · 20 docs
Floor 6787 11th ASC, Mount Sinai Health System +224p · 14 filings · 20 docs
Floor 5Mount Sinai Health System, 787 11th ASCUnder Construction6p · 7 filings · 20 docs
Floor 4Mount Sinai Health SystemUnder Construction8p · 5 filings · 18 docs
Floor 3Georgetown Eleventh Avenue Owners1p · 1 filing · 7 docs
Floor 2Mount Sinai Health System6p · 4 filings · 7 docs
Floor 1Mount Sinai Health System, 787 11th ASCUnder Construction10p · 10 filings · 20 docs
MezzanineOxman Studio, True NorthUnder Construction7p · 6 filings · 20 docs
CellarTrue North, Oxman Studio +2Under Construction24p · 13 filings · 20 docs
Site & exteriorMount Sinai Health System8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Georgetown51010/04/2026
787 Auto Investors1203/21/2026
Safeway Atlantic203/21/2026
Ford Motor Land Development203/21/2026
Benenson Capital Company203/21/2026
Loews203/21/2026
Hunter Roberts Construction Group103/22/2026
Potamkin NY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Milrose Consultants4103/21/2026
Outsource Consultants4703/21/2026
Rite One Expediting103/21/2026
Municipal Building Consultants303/21/2026
Patuxent Engineering203/21/2026
A1 Expediting Service2203/21/2026
Signs Cad403/21/2026
AE Design Solution403/21/2026
Direct Access Expediting403/21/2026
Outsourceconsultants Company603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sciame Homes NYGeneral Contractor3407/08/2026
Hunter Roberts ConstructionGeneral Contractor3307/08/2026
S&E Bridge & ScaffoldScaffold1107/08/2026
Manengeering BureauFire Protection1007/08/2026
Safway AtlanticScaffold707/08/2026
Unity Construction ServicesGeneral Contractor707/08/2026
Par Fire ProtectionFire Protection707/08/2026
Par Plumbing CoPlumbing707/08/2026
Cardoza PlumbingPlumbing507/08/2026
Albco TechGeneral Contractor404/09/2026
Accurate MechanicalPlumbing307/08/2026
Aura PlumbingPlumbing306/28/2026
Core Scaffold SystemsScaffold307/08/2026
Lawrence J. LevineFire Protection303/21/2026
Urban IntelligenceScaffold207/08/2026
Benny & Son ConstructionGeneral Contractor207/08/2026
Alltype Fire ProtectionFire Protection208/25/2026
DD&G ElectricalElectrical203/22/2026
Full Capacity FireFire Protection207/08/2026
Pace PlumbingPlumbing207/08/2026
Atlas-Acon Electric ServiceElectrical103/21/2026
Zatos Plumbing and HeatingPlumbing108/25/2026
Stat ElectricElectrical103/21/2026
Katz Electric CoElectrical103/21/2026
Nash Electric ServicesElectrical103/22/2026
Robert B. SamuelsElectrical103/22/2026
Star Electrical ContractorsElectrical103/22/2026
Transel Elev. & ElectricElectrical103/22/2026
Warren Ostroff ElectricElectrical103/22/2026
Classic Consulting GroupScaffold107/08/2026
King Hoist & ScaffoldingScaffold107/08/2026
York Scaffold EquipmentScaffold107/08/2026
Signs CadSign hanger107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
Alliance PlumbingPlumbing107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Louis L.buttermark & SonsPlumbing107/08/2026
Louis L.buttermark & SonsFire Protection107/08/2026
Pace PlumbingFire Protection106/28/2026
Sean Coakley P & HFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8432105/07/2026
Framework Engineering8217106/04/2025
MEP Inspections1102901/03/2025
Joseph Martines PE1428312/19/2024
Codegreen5101104/05/2024
Outsource Special Inspection28273509/14/2023
Madsen Engineering5423410/28/2022
Building Lifecycle
All (300)Filed (50)Permit Issued (62)Signed Off (44)Facade (FISP) (9)Violation (32)Inspection (47)Objection (26)Special Inspection (30)
10/02/2026
Objection resolved — Addressed
10/02/2026
Objection resolved — Addressed
10/01/2026
Objection raised — Other
10/01/2026
Objection raised — Other
09/11/2026
Filed — Alteration
FILING FOR INSTALLATION OF 30'-0" LINEAR FEET CURB CUT AS INDICATED ONHE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01445701-I1
08/31/2026
Signed off — Alteration
Additions & modifications to existing plumbing and sprinkler systems and related piping. No change in use, egress or occupancy.
M00345507-I1
08/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2026
Permit issued — Sprinklers
M00516908-I1-EW-SP
08/24/2026
Permit issued — Sprinklers
M00558061-I1-PL
08/20/2026
Permit issued — Plumbing
M00558061-I1-EW-SP
06/18/2026
Signed off — Alteration
(Manager's Office and ladies locker room) Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
M00572259-I1
05/07/2026
Filed — Alteration
Removal and installation of new sprinkler heads on 4th and 5th floor. Modification of standpipe riser, floor control valve assembly and standpipe drain on 1st floor and cellar level. No change in use, egress or occupancy.
M00516908-P1
05/05/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
05/05/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
05/05/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
05/05/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
05/05/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
05/05/2026
Special inspection requirement — Final
James Herr
04/30/2026
Filed — Alteration
(Manager's Office and ladies locker room) Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
M00572259-P1
04/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
04/23/2026
Special inspection requirement — Final
James Herr
04/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/23/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
04/23/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
04/23/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Sprinkler Systems
JOHN MCMONAGLE
04/01/2026
Signed off — Alteration
Renovation/changes. No change in use, egress or occupancy.
M00558040-I1
12/12/2025
Signed off — Alteration
Additions & modifications to existing sprinkler system. 709 total sprinkler heads being installed (331 heads on 6th floor, 378 heads on 7th floor). Associated standpipe work filed in DOB, BIS #123731505. No change in use, egress or occupancy.
M00250717-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2025
Signed off — Alteration
concrete repairs to garage, cellar through 5th floor as per plans herewith filed.
M01225887-I1
09/08/2025
Signed off — Alteration
Installation of water and sanitary piping connections for a capsule in a laboratory space . No change in use, egress or occupancy
M00861936-I1
07/21/2025
Permit issued — General Construction
M01225887-I1-GC
06/24/2025
Signed off — Alteration
Tenant fitout for labs and offices. No change in use, egress or occupancy.
M00582816-I1
06/04/2025
Filed — Alteration
concrete repairs to garage, cellar through 5th floor as per plans herewith filed.
M01225887-I1
05/30/2025
Special inspection requirement — Concrete - Cast-In-Place
JAMES NAPOLI
05/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES NAPOLI
05/14/2025
Special inspection requirement — Final
JAMES NAPOLI
04/07/2025
Signed off — Alteration
Relocation of lobby stair, new slab openings, new slab infills. No change in use, egress or occupancy.
M00560973-I1
03/10/2025
Filed — Alteration
Additions & modifications to existing plumbing and sprinkler systems and related piping. No change in use, egress or occupancy.
M00345507-P2
03/10/2025
Special inspection requirement — Sprinkler Systems
STEPHEN WOODCHEKE
03/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN WOODCHEKE
02/25/2025
Permit issued — Plumbing
M00582816-I1-PL
02/12/2025
Signed off — Alteration
Interior fit-out of partitions, interior feature stair, ceilings and doors. No change in use, egress or occupancy.
M00456359-I1
02/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/04/2025
Signed off — Alteration
Tenant fitout for labs and offices.. No change in use, egress or occupancy.
M00582786-I1
01/31/2025
Signed off — Alteration
INSTALLATION STEEL PIPE SCAFFOLD ON ROOF AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00040255-I1
01/21/2025
Signed off — Alteration
Facade restoration to include but not limited to terracotta repairs, Retrofit pinning, expansion joint replacement as per plans filed herewith. No change in use egress or occupancy.
M00965323-I1
01/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
01/06/2025
Permit issued — Plumbing
M00861936-I1-PL
01/06/2025
Special inspection requirement — Masonry
JOSEPH MARTINES
01/06/2025
Special inspection requirement — Post-installed Anchors
JOSEPH MARTINES
01/06/2025
Special inspection requirement — Air barrier - visual inspection
Benson Gillespie
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedZatos Plumbing and Heating08/24/2026
DOB NOWSprinklersPermit IssuedAlltype Fire Protection08/24/2026
DOB NOWSprinklersPermit IssuedAlltype Fire Protection08/20/2026
DOB NOWGeneral ConstructionSigned-offBenny & Son Construction07/21/2025
DOB NOWPlumbingSigned-offPar Plumbing Co02/25/2025
DOB NOWPlumbingSigned-offPar Plumbing Co01/06/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems10/03/2024
DOB NOWMechanical SystemsSigned-offSciame Homes NY09/10/2024
DOB NOWGeneral ConstructionSigned-offSciame Homes NY09/10/2024
DOB NOWGeneral ConstructionSigned-offSciame Homes NY08/13/2024
DOB NOWPlumbingPermit IssuedAura Plumbing06/12/2024
DOB NOWGeneral ConstructionSigned-offSciame Homes NY05/22/2024
DOB NOWStandpipeSigned-offFull Capacity Fire04/02/2024
DOB NOWGeneral ConstructionSigned-offBenny & Son Construction02/27/2024
DOB NOWSupported ScaffoldSigned-offClassic Consulting Group02/13/2024
DOB NOWSidewalk ShedSigned-offUrban Intelligence01/09/2024
DOB NOWPlumbingSigned-offPar Plumbing Co10/31/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems10/06/2023
DOB NOWSidewalk ShedSigned-offUrban Intelligence09/20/2023
DOB NOWStructuralSigned-offSciame Homes NY09/12/2023
DOB NOWGeneral ConstructionSigned-offSciame Homes NY09/12/2023
DOB NOWMechanical SystemsSigned-offSciame Homes NY09/12/2023
DOB NOWStandpipeSigned-offManengeering Bureau08/17/2023
DOB NOWSprinklersSigned-offManengeering Bureau08/16/2023
DOB NOWSprinklersSigned-offLawrence J. Levine08/15/2023
DOB NOWPlumbingSigned-offCardoza Plumbing Wmbe08/07/2023
DOB NOWStructuralSigned-offHunter Roberts Construction08/03/2023
DOB NOWBoiler EquipmentSigned-offAnthony Disabato07/25/2023
DOB NOWBoiler EquipmentSigned-offAnthony Disabato07/25/2023
DOB NOWBoiler EquipmentSigned-offAnthony Disabato07/25/2023
DOB NOWPlumbingSigned-offCardoza Plumbing06/22/2023
DOB NOWSprinklersSigned-offManengeering Bureau06/06/2023
DOB NOWStandpipeSigned-offManengeering Bureau06/06/2023
DOB NOWSprinklersSigned-offFull Capacity Fire06/05/2023
DOB NOWMechanical SystemsSigned-offUnity Construction Services05/23/2023
DOB NOWGeneral ConstructionSigned-offUnity Construction Services05/23/2023
DOB NOWStructuralSigned-offUnity Construction Services05/23/2023
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating05/19/2023
DOB NOWBoiler EquipmentSigned-offCardoza Plumbing05/11/2023
DOB NOWBoiler EquipmentSigned-offCardoza Plumbing05/11/2023
+ 60 more permits on file
3 projects · most recent 05/07/2026
FiledStatusContractorScope
05/07/2026Permit IssuedRolando Fire Supp Mechanical—
03/10/2025Signed-offLouis L.buttermark & Sons8 heads
12/03/2019——71 heads
1 project · most recent 03/10/2025
Water/Sanitary
FiledStatusContractorScope
03/10/2025Signed-offLouis L.buttermark & SonsWater/Sanitary
25 projects · most recent 05/11/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
05/11/2026Permit IssuedTeam ElectricGeneral Wiring
03/11/2026Permit IssuedTeam ElectricGeneral Wiring
02/26/2026CompleteDD&G ElectricalGeneral Wiring
02/26/2026CompleteDD&G ElectricalGeneral Wiring
02/26/2026CompleteDD&G ElectricalGeneral Wiring
02/26/2026CompleteDD&G ElectricalGeneral Wiring
02/26/2026CompleteDD&G ElectricalGeneral Wiring
02/26/2026CompleteDD&G ElectricalGeneral Wiring
10/16/2025CompleteDD&G Electrical—
10/16/2025CompleteDD&G Electrical—
10/16/2025CompleteDD&G ElectricalGeneral Wiring
10/08/2025CompleteUnity Electric Co—
09/03/2025CompleteUnity Electric Co2 meters, 2 new_meters
07/23/2025CompleteDD&G ElectricalGeneral Wiring
07/03/2025CompleteDD&G Electrical—
▾Field Inspections (DOB CAP) — 62
DateTypeResultReport
08/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/10/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/05/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/23/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/05/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
11/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/31/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/25/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/05/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
06/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 62.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
05/05/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
05/05/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
05/05/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
05/05/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
05/05/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
05/05/2026FinalJames Herrprogress
04/23/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
04/23/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
04/23/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
04/23/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/23/2026FinalJames Herrprogress
04/23/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
04/16/2026Sprinkler SystemsJOHN MCMONAGLEspecial
05/30/2025Concrete - Cast-In-PlaceJAMES NAPOLIspecial
05/30/2025Structural Stability – Alterations of existing buildingsJAMES NAPOLIspecial
05/14/2025FinalJAMES NAPOLIprogress
03/10/2025Sprinkler SystemsSTEPHEN WOODCHEKEspecial
03/10/2025Fire-Resistant Penetrations and JointsSTEPHEN WOODCHEKEspecial
01/10/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
01/06/2025Post-installed AnchorsJOSEPH MARTINESspecial
01/06/2025MasonryJOSEPH MARTINESspecial
01/06/2025FinalBenson Gillespieprogress
01/06/2025Air barrier - visual inspectionBenson Gillespieenergy_progress
12/24/2024Fire-Resistant Penetrations and JointsNicolas Crosettospecial
04/12/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Oxman StudioLaboratoryFloors 9, 10, Roof
Project M00861936 Alteration · LOC Issued · 05/05/2023
Project M00582786 Alteration · LOC Issued · 09/13/2021
Project M00456359 Alteration · LOC Issued · 02/12/2021
Project M00462866 Alteration · LOC Issued · 02/11/2021
787 11th ASCMedical / HealthcareCellar, Floors 1, 5–8
Project M08033233 Alteration · LOC Issued · 11/07/2022
Project M08033256 Alteration · LOC Issued · 11/07/2022
Project M08033261 Alteration · LOC Issued · 11/07/2022
Project M08033265 Alteration · LOC Issued · 11/04/2022
Merritt HealthcareMedical / HealthcareFloors 6, 7
Project M08033218 Alteration · LOC Issued · 11/05/2022
Mount Sinai Health SystemMedical / HealthcareCellar, Floors 1–10, Penthouse, Roof
Project M00789782 Alteration · LOC Issued · 08/24/2022
Project M00493720 Alteration · LOC Issued · 11/05/2021
Project M00493718 Alteration · LOC Issued · 11/02/2021
Project M00493758 Alteration · LOC Issued · 11/02/2021
Project M00493799 Alteration · LOC Issued · 11/02/2021
Project M00493811 Alteration · LOC Issued · 11/02/2021
Project M00520913 Alteration · LOC Issued · 11/02/2021
Project M00585841 Alteration · LOC Issued · 11/02/2021
Project M00493770 Alteration · LOC Issued · 10/20/2021
Project M00493697 Alteration · LOC Issued · 09/27/2021
Project M00493672 Alteration · LOC Issued · 08/03/2021
Project M00493651 Alteration · LOC Issued · 07/13/2021
True NorthLaboratoryCellar, Floors 9, 10, Mezzanine, Roof
Project M00572259 Alteration · LOC Issued · 09/15/2021
Project M00582816 Alteration · LOC Issued · 09/13/2021
Project M00582826 Alteration · LOC Issued · 09/13/2021
RegusOfficeFloors 6, 7
Project M00250717 Alteration · LOC Issued · 10/25/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,318 on file (BIS + DOB NOW)
▸Plans & Drawings117
▸DOB NOWPlans/Sketch98
10/04/2026M01445701-I1Request digital key ↗
09/06/2026M00002080-I1Request digital key ↗
09/06/2026M00040255-I1Request digital key ↗
Showing 3 of 98 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler8
09/05/2026M00230304-I1Request digital key ↗
09/05/2026M00230304-S1Request digital key ↗
09/05/2026M00250717-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Structural4
09/03/2026M00462866-P2Request digital key ↗
09/03/2026M00462866-I1Request digital key ↗
09/03/2026M00462866-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/02/2026M00456359-P1Request digital key ↗
09/02/2026M00456359-P2Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00345502-I1Request digital key ↗
▸Applications & Permits403
▸BISPLAN / WORK APPROVAL APPLICATION267
03/03/2026121190399Open ↗
02/26/2026123758175Open ↗
02/24/2026123758175Open ↗
Showing 3 of 267 on file for this type
▸BISWORK PERMIT APPLICATION120
01/03/2023121190399Open ↗
Showing 1 of 120 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit12
09/03/2026M00462866-I1Open ↗
09/03/2026M00462866-P1Open ↗
09/03/2026M00462866-P2Open ↗
Showing 3 of 12 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISZONING RESOLUTION DETERMINATION2
07/28/2022121190399Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications692
▸DOB NOWProgress Inspector Seal & Signature157
10/07/2026M00585841-P1Open ↗
10/07/2026M00585841-P1Open ↗
10/07/2026M00585841-P1Open ↗
Showing 3 of 157 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION144
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 144 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature141
10/07/2026M00585841-P1Open ↗
10/07/2026M00585841-P1Open ↗
10/07/2026M00585841-P1Open ↗
Showing 3 of 141 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature109
10/04/2026M01445701-I1Open ↗
09/06/2026M00002080-I1Open ↗
09/06/2026M00040255-I1Open ↗
Showing 3 of 109 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT69
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 69 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment126
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISSCHEDULE B - PLUMBING34
02/24/2026123758175Open ↗
11/13/2025123758175Open ↗
09/29/2025121190399Open ↗
Showing 3 of 34 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
01/20/2026123685958Open ↗
11/18/2025123685958Open ↗
09/25/2024121190399Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS9
01/20/2026123685958Open ↗
11/20/2025123685958Open ↗
09/25/2024121190399Open ↗
Showing 3 of 9 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
01/28/2026122625631Open ↗
11/23/2022122980961Open ↗
Showing 2 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT3
02/13/2025123685958Open ↗
02/13/2025123685958Open ↗
05/22/2024121190399Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS3
02/13/2025123685958Open ↗
05/22/2024121190399Open ↗
02/29/2024121190399Open ↗
▸BISSPRINKLER SYSTEMS2
03/17/2022122957498Open ↗
Showing 1 of 2 on file for this type
▸Safety & Tenant Protection126
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist87
10/04/2026M01445701-I1Open ↗
09/06/2026M00002080-I1Open ↗
09/06/2026M00040255-I1Open ↗
Showing 3 of 87 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWCertificate of No Harassment11
09/03/2026M00462866-P3Open ↗
09/03/2026M00462866-P2Open ↗
09/03/2026M00462866-I1Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos110
▸DOB NOWDEP ACP-5: Asbestos Assessment Report67
09/03/2026M00493044-I1Open ↗
09/03/2026M00493651-I1Open ↗
09/03/2026M00493651-P1Open ↗
Showing 3 of 67 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)37
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 37 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.14
09/03/2026M00558040-I1Open ↗
09/03/2026M00493799-I1Open ↗
09/03/2026M00493635-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/03/2021122628585Open ↗
Showing 1 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
01/29/2026121190399Open ↗
02/13/2025123685958Open ↗
08/28/2024122628585Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/01/2024122990424Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
02/13/2025123685958Open ↗
03/04/2024122990424Open ↗
▸BIS* HVAC INSULATION AND SEALING2
02/13/2025123685958Open ↗
02/29/2024121190399Open ↗
▸Inspections & Test Reports73
▸BISTECHNICAL REPORT: RESPONSIBILITY47
03/13/2025140477874Open ↗
03/13/2025140477874Open ↗
06/10/2024121190399Open ↗
Showing 3 of 47 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMECHANICAL SYSTEMS3
02/28/2025121190399Open ↗
08/28/2024122628585Open ↗
03/04/2024122990424Open ↗
▸BISPOST-INSTALLED ANCHORS2
08/28/2024122628585Open ↗
03/01/2024122990424Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
08/28/2024122628585Open ↗
03/01/2024122990424Open ↗
▸Approvals, Objections & Sign-offs153
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST75
12/11/2025123685958Open ↗
09/10/2025122628585Open ↗
07/25/2025122957498Open ↗
Showing 3 of 75 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION35
07/03/2024124039959Open ↗
07/03/2024124039959Open ↗
Showing 2 of 35 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE23
03/03/2026121190399Open ↗
01/15/2026121190399Open ↗
12/21/2022121190399Open ↗
Showing 3 of 23 on file for this type
▸BISSHED LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFINAL5
07/22/2025122957498Open ↗
08/28/2024122628585Open ↗
03/04/2024122990424Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership129
▸BISCOST AFFIDAVIT103
05/15/2025121190399Open ↗
05/09/2025121190399Open ↗
03/13/2025140477874Open ↗
Showing 3 of 103 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE10
01/03/2023121190399Open ↗
Showing 1 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
12/11/2025123685958Open ↗
11/12/2025121190399Open ↗
07/22/2025122957498Open ↗
Showing 3 of 8 on file for this type
▸BISDEPT OF FINANCE VERIFICATION4
07/01/2024124039959Open ↗
07/01/2024124039959Open ↗
06/28/2023123917431Open ↗
Showing 3 of 4 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
07/09/2024121190399Open ↗
02/02/2024121190399Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
01/03/2023121190399Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms252
▸BISADDITIONAL INFORMATION108
10/06/2025121190399Open ↗
09/19/2025123758175Open ↗
08/04/2025121190399Open ↗
Showing 3 of 108 on file for this type
▸BISEFILING COVER SHEET75
07/01/2024124039959Open ↗
06/28/2023123917431Open ↗
Showing 2 of 75 on file for this type
▸BISBOROUGH INTAKE FORM58
03/07/2023121190399Open ↗
01/03/2023121190399Open ↗
12/30/2022121190399Open ↗
Showing 3 of 58 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Other Documents33
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
10/27/2025123029551Open ↗
07/03/2024124039959Open ↗
06/28/2023123917431Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWWaiver Document7
09/03/2026M00558061-P1Open ↗
Showing 1 of 7 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION6
10/27/2025123029551Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation4
09/06/2026M00002080-I1Open ↗
09/06/2026M00040255-I1Open ↗
09/06/2026M00040255-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board4
09/06/2026M00002080-I1Open ↗
09/06/2026M00040255-I1Open ↗
09/06/2026M00040255-P2Open ↗
Showing 3 of 4 on file for this type