Roof4p · 3 filings · 20 docs
ArchitectureStructural
FACADE RESTORATION, INSPECTIONS
On file for this job
14 documents · 1 drawing sheet
9th Floor Roofing Replacement as shown in filed drawings. No change in use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Installation of temporary access/supported scaffold for facade work at roof level per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this job
3 documents · 1 drawing sheet
Bulkhead2p · 1 filing · 14 docs
Architecture
FACADE RESTORATION, INSPECTIONS
On file for this job
14 documents · 2 drawing sheets
Floor 47Under Construction31p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this job
4 documents · 1 drawing sheet
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Miscellaneous Demolition; Installation of new partitions, doors, finishes and suspended ceilings on the 40-42, 47th Floors as per plans (Willkie Farr Gallagher - Phase 2/ Package #12.) No change to use, egress or occupancy.
On file for this job
3 documents
Latest 3 of 8 filings on this floor.
Floor 46Under Construction54p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Structural Modifications on the 45-46th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Install new plumbing fixtures (2) HWH, (2) WC, (2) Lavs, (3) DF/BF, (2) Sinks, (1) CM, (1) IM, (1) DW and associated CW/sanitary piping on the 39 & 46th Floors each as per plans (Willkie Farr & Gallagher/ Phase 3 - Package #13.
On file for this job
4 documents · 1 drawing sheet
Remove existing sprinkler heads; Install temporary heads and permanent heads and associated sprinkler piping on the 39 and 46th Floors as per plans (WFG/ Phase 3 - Package #13.) No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 45106p · 15 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Standpipe
Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and ceilings on the 45th Floor as per plans (WFG/ Phase 1 - Package #5.) No change to use, egress or occupancy.
On file for this job
6 documents · 10 drawing sheets
Modifications to add Places of Assembly on the 35th, 36th and 45th Floors as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this job
21 documents · 2 drawing sheets
Modifications to the existing plumbing system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 44Under Construction89p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 37, 43-44th Floor as per plans (WFG/ Phase 1 - Package #10.) No change to use, egress or occupancy.
On file for this job
12 documents · 8 drawing sheets
Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Modifications to the existing plumbing system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 43Under Construction88p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 37, 43-44th Floor as per plans (WFG/ Phase 1 - Package #10.) No change to use, egress or occupancy.
On file for this job
12 documents · 9 drawing sheets
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 37, 43-44th Floors as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing plumbing system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 42Under Construction37p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this job
4 documents
Miscellaneous Demolition; Installation of new partitions, doors, finishes and suspended ceilings on the 40-42, 47th Floors as per plans (Willkie Farr Gallagher - Phase 2/ Package #12.) No change to use, egress or occupancy.
On file for this job
3 documents
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 40-42nd and 47th Floor as per plans (Willkie Farr & Gallagher - Phase 2/ Package #12.) No change to use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 41Under Construction35p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this job
4 documents · 1 drawing sheet
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42, 47th Floors as per plans (Willkie Farr Gallagher/ Phase 2 - Package #12.)
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 40Under Construction29p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this job
4 documents
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42, 47th Floors as per plans (Willkie Farr Gallagher/ Phase 2 - Package #12.)
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 39Under Construction69p · 9 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Install new plumbing fixtures (2) HWH, (2) WC, (2) Lavs, (3) DF/BF, (2) Sinks, (1) CM, (1) IM, (1) DW and associated CW/sanitary piping on the 39 & 46th Floors each as per plans (Willkie Farr & Gallagher/ Phase 3 - Package #13.
On file for this job
4 documents
Remove existing sprinkler heads; Install temporary heads and permanent heads and associated sprinkler piping on the 39 and 46th Floors as per plans (WFG/ Phase 3 - Package #13.) No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Miscellaneous Demolition; Installation of new partitions, doors, finishes and suspended ceilings on the 39 and 46th Floors as per plans (Willkie Farr Gallagher - Phase 3/ Package #13.) No change to use, egress or occupancy.
On file for this job
6 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3816p · 9 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbing
Modifications to the existing HVAC system; Installation of new duct work, VAV boxes, Grilles, Diffusers and BMS as per plans (Willkie Farr - Buildout Phase.) No change to use, egress or occupancy.
On file for this job
6 documents · 3 drawing sheets
Remove existing pantry fixtures on the 34, 38 & 45th Floors; Install new: (1) sink, (1) coffeemaker, (1) Ice maker, (1) Water dispenser, (1) EEmax Water Heater and associated piping on 34, 38 and 45th Flrs as per plans. No change to use, egress or occup.
On file for this job
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new pantry fixtures, partitions, flooring, suspended ceilings and finishes as per plans (Willkie Farr Pantry Upgrade.) No change to use, egress or occupancy.
On file for this job
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 37109p · 20 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe
Modifications to the existing sprinkler system on the (37th Floor- WFG Mockup) as per plans. No change to use, egress or occupancy.
On file for this job
7 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (37th Floor- WFG Mockup) as per plans. No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Remove existing pantry fixtures on the 34, 38 & 45th Floors; Install new: (1) sink, (1) coffeemaker, (1) Ice maker, (1) Water dispenser, (1) EEmax Water Heater and associated piping on 34, 38 and 45th Flrs as per plans. No change to use, egress or occup.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 36Under Construction72p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe · Structural
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 36th Floor as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this job
6 documents · 8 drawing sheets
Structural Modifications and installation of stairs on the 34-36th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this job
10 documents · 2 drawing sheets
Modifications to add Places of Assembly on the 35th, 36th and 45th Floors as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this job
21 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 35112p · 18 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to the existing Sprinkler System: Removal of one hundred and eight (118) existing sprinkler heads and associated piping, Install twenty (38) new sprinkler heads on the 35th Floor as per plans (LL Work - Demo & Buildout.)
On file for this job
7 documents · 1 drawing sheet
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (34, 35, 36, 37, 43, 44, 45 Floors- Willkie Farr) as per plans. No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the (34, 35, 36, 37, 43, 44, 45 Floors - Willkie Farr) as per plans. No change to use, egress or occupancy.
On file for this job
3 documents
Latest 3 of 8 filings on this floor.
Floor 34Under Construction110p · 14 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and suspended ceilings on the 34-35th Floor as per plans (WFG/ Phase 1 - Package 3.)
On file for this job
12 documents · 11 drawing sheets
Structural Modifications and installation of stairs on the 34-36th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 34 and 35th Floors as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 33
Floor 323p · 2 filings · 8 docs
ArchitectureStructural
Minor interior demo. Installation of new low interior partitions, doors, exit signs and finishes on the 32nd floor as per plans (Stifel Swing Space - Interior Updates.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Removal and disposal of interior partitions, fixtures, suspended ceilings, floor finishes; Patching/ maintaining 2HR fire-rated Core walls, installation of new perimeter gypsum soffit on the 28-31st Floors as per plans (CWP - Tenant Demo & Prebuilt.)
On file for this job
4 documents · 1 drawing sheet
Floor 3119p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Install new plumbing fixtures: (4) HWH, (2) IM, (4) WD, (7) CM, (1) FD, (3) DW, (3) sink, (9) WC, (9) lavatories, (2) urinals and associated CW/sanitary piping on the 31st Floor as per plans (Holland & Knight.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Installation of (263) new sprinkler heads and associated piping on the 31st Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Modifications to the existing HVAC System: Installation of new AC Units and associated ductwork, VAV's, controls, diffusers and air purifications system on the 31st Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 3016p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Install new plumbing fixtures: (1) FD, (3) IM, (2) DW, (4) sinks, (3) HWH, (4) CM, (1) WD, (8) lavatories, (8) WC, (2) UR and associated CW/sanitary piping on the 30th Floor as per plans (Holland & Knight Renovation.) No change to use, egress or occupancy
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: Install new AC Units, ductwork, VAV's and controls on the 30th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 30th Floor as per plans (Holland & Knight.) No change to use, egress or occupancy.
On file for this job
5 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2913p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 28th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 29th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
3 documents · 5 drawing sheets
Modifications to the existing HVAC System: Installation of new ac units, ductwork, VAVs, vents and controls on the 29th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2815p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 28th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
5 documents · 6 drawing sheets
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 29th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: Installation and relocation of ductwork, AC Unit, VAV's, controls and vents on the 28th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2726p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Creation of a Place of Assembly space on the 31st floor (Meeting Hall), accessory to business occupancy.
On file for this job
7 documents
Increase in occupancy load on 27th floor. Minor interior construction work is proposed.
On file for this job
6 documents · 1 drawing sheet
Modifications to the existing HVAC System; Installation of new equipment and associated ductwork & distribution as per plans (BNPP Buildout.) No change to use, egress or occupancy.
On file for this job
7 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2615p · 4 filings · 20 docs
Fire ProtectionGeneralMechanicalStructural
Modifications to the existing Sprinkler System: Installation of (263) new sprinkler heads and associated piping on the 31st Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Filing for Structural modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this job
9 documents · 1 drawing sheet
Filing for alteration to Mechanical system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this job
10 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 256p · 3 filings · 20 docs
Fire ProtectionMechanicalStructural
Filing for Structural modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this job
9 documents · 1 drawing sheet
Filing for alteration to Mechanical system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this job
10 documents · 2 drawing sheets
FILING FOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
10 documents · 3 drawing sheets
Floor 244p · 2 filings · 20 docs
Fire ProtectionMechanical
Filing for alteration to Mechanical system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this job
10 documents · 2 drawing sheets
FILING FOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
10 documents · 2 drawing sheets
Floor 2348p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems
Modifications to existing sprinkler system as per plans filed herewith.
On file for this job
12 documents · 6 drawing sheets
FILING FOR HVAC MODIFICATIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
39 documents · 5 drawing sheets
Modifications to existing mechanical systems as per plans filed herewith.
On file for this job
8 documents · 6 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2260p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
FILING FOR HVAC MODIFICATIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
39 documents · 6 drawing sheets
FILING FOR MODIFICATION TO PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this job
10 documents · 15 drawing sheets
Filing structural steel and concrete per plans filed herewith. No change in use, egress or occupancy.
On file for this job
23 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 213p · 3 filings · 20 docs
ArchitectureFire Protection
Modifications to existing sprinkler system as per plans filed herewith.
On file for this job
12 documents · 1 drawing sheet
Removal and installation of non bearing partitions and interior finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
9 documents · 1 drawing sheet
additions/modifications to existing sprinkler system as per plans filed herewith . No change in use, egress or occupancy.
On file for this job
8 documents · 2 drawing sheets
Floor 201p · 1 filing · 8 docs
Fire Protection
additions/modifications to existing sprinkler system as per plans filed herewith . No change in use, egress or occupancy.
On file for this job
8 documents · 1 drawing sheet
Floor 19
Floor 18
Floor 175p · 1 filing · 5 docs
Mechanical
removal of FM- 200 system as shown on plans filed herewith. No change in use, egress or occupancy
On file for this job
5 documents · 5 drawing sheets
Floor 16
Floor 1530p · 4 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Filing for removal and installation of sprinkler heads and related piping as per plans filed herewith.
On file for this job
8 documents · 9 drawing sheets
Filing for plumbing fixture and associated piping removal and installation in pantry and bathrooms as per plans filed herewith.
On file for this job
9 documents · 7 drawing sheets
Demolition of the 15th floor in preparation for construction of new workspace on those floors with new offices, team rooms, lighting, finishes and MEP systems.
On file for this job
8 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 144p · 2 filings · 12 docs
Fire ProtectionMechanical
Modification to existing Sprinkler system as per plans filed herewith.
On file for this job
8 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
4 documents · 2 drawing sheets
Floor 131p · 1 filing · 4 docs
Mechanical
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this job
4 documents · 1 drawing sheet
Floor 126p · 4 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Mechanical Systems
Modifications to the existing HVAC system; Ductwork, Insulation, New Air Outlets, Relocate thermostats as per plans (1919 Investment Counsel/ Stifel.) No change to use, egress or occupancy.
On file for this job
8 documents · 2 drawing sheets
Modifications to the HVAC system installation of duct work, insulation, acoustical lining, air grills, VAV boxes, controls and balancing as per plans (Stifel Financial.) No change to use, egress or occupancy.
On file for this job
9 documents · 2 drawing sheets
Modifications to the existing Sprinkler System as per plans (Stifel Financial.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 119p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Modifications to the existing Sprinkler System: Install (6) new sprinkler heads on the 4th Floor and (237) new sprinkler heads and associated piping on the 11th Floor as per plans (Stifel Buildout & Restrooms.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Install (6) Lavs, (5) WCs, (2) UR on the 4th Floor and Install (8) Lavs, (7) WCs, (3) UR, (2) CM, (1) DW, (1) Water Dispenser, (1) Icemaker, (2) Sink, (1) refrigerator, (1) HWH on the 11th Floor and associated CW/sanitary piping on both as per plans.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: Install new ductwork, insulations, VAV boxes, acoustical lining, air outlets, controls, control wiring & air balancing on the 4th and 11th Floors as per plans (Stifel - Restrooms and Buildout.)
On file for this job
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 106p · 6 filings · 20 docs
MechanicalPlumbingStructural
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 7-8th Floors as per plans (BNP/ Restroom Expansion.) No change to use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Structural Modifications; Reinforcement of existing steel and miscellaneous steel supports on the 9th and 10th Floors as per plans (BNP - NYC HQ Renovation/ Upper Stack.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 9th and 10th Floors including rangehood cooking exhaust system as per plans (BNPP - NYC HQ.) No change to use, egress or occupancy.
On file for this job
19 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 930p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Interior gut demolition of floor; Installation of new partitions, doors, floor finishes and suspended ceilings on the 9th Floor as per plans (BNP - NYC HQ.) No change to use, egress or occupancy.
On file for this job
3 documents · 10 drawing sheets
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this job
15 documents · 2 drawing sheets
Structural Modifications; Reinforcement of existing steel and miscellaneous steel supports on the 9th and 10th Floors as per plans (BNP - NYC HQ Renovation/ Upper Stack.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 819p · 10 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 7-8th Floors as per plans (BNP/ Restroom Expansion.) No change to use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 7-8th floors as per plans (BNPP - Restroom Expansion.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Interior gut demolition; Installation of new partitions, doors, floor finishes and suspended ceilings on the 7th & 8th Floors as per plans (BNPP - NYC HQ.) No change to use, egress or occupancy.
On file for this job
7 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 713p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 7-8th floors as per plans (BNPP - Restroom Expansion.) No change to use, egress or occupancy.
On file for this job
3 documents
Minor interior demolition and removal of interior partitions and finishes; Installation of new interior partitions, suspended ceilings, flooring and finishes on the 7th Floor as per plans (BNPP Office Renovation.) No change to use, egress or occupancy.
On file for this job
5 documents · 4 drawing sheets
Interior gut demolition; Installation of new partitions, doors, floor finishes and suspended ceilings on the 7th & 8th Floors as per plans (BNPP - NYC HQ.) No change to use, egress or occupancy.
On file for this job
7 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 62p · 2 filings · 17 docs
Fire ProtectionMechanical
Modifications to the existing Sprinkler Systems: Relocation of eight (8) existing sprinkler heads and associated piping on the 6th Floor as per plans (Stifel Buildout.) No change to use, egress or occupancy.
On file for this job
7 documents · 1 drawing sheet
Modifications to the existing HVAC system: Installation of new ductwork, insulation, air outlets, VAV box and controls on the 6th Floor as per plans (Stifel - Buildout.) No change to use, egress or occupancy.
On file for this job
10 documents · 1 drawing sheet
Floor 521p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingOther
Remove Plumbing Fixtures: (1) WC, (1) Lav, (6) FDs, (5) sinks, (3) DW, (1) WD, (1) refrigerator, (2) IM and associated CW/sanitary piping on the 5th Floor as per plans (Stifel/ North Floor Demo.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: removal of ductwork, insulations, air outlets, controls, control wiring & accessories on the 5th Floor as per plans (Stifel/ North Floor Demo.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Remove (11) existing sprinkler heads and Install (10) new sprinkler heads and associated piping on the 5th Floor as per plans (Stifel Office Renovations.) No change to use, egress or occupancy.
On file for this job
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 424p · 18 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Installation of new plumbing fixtures: (7) WCs, (7) Lavs, (3) Urinals, (1) IM, (1) WD, (1) pantry sink, (1) DW, (1) CM and associated CW/sanitary piping on the 4th Floor as per plans (Stifel Buildout Phase.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Minor interior demolition of bathrooms. Installation of new partitions, office front system, suspended ceilings, flooring and finishes on the 4th Floor as per plans (Stifel - Buildout Phase.) No change to use, egress or occupancy.
On file for this job
4 documents · 6 drawing sheets
Minor interior demolition. Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the 4th Floor as per plans (Stifel Demo Phase.) No change to use, egress or occupancy.
On file for this job
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 314p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
Structural Modifications; Installation of structural steel reinforcement for walls and food service trough on 2-3, and masonry wall lintels and masonry wall details on the Mez (P1 Level) as per plans (BNP Paribas.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Modifications to the existing HVAC and disconnect existing Units as per plans (BNPP - Early Demo.) No change to use, egress or occupancy.
On file for this job
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on 2-3rd Floors as per plans (BNP Paribas.) No change to use, egress or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 221p · 13 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Remove three hundred and eighty three (383) sprinkler heads on the 2nd Floor and Install sixty-five (65) new temporary heads and associated piping on the 2nd Floor as per plans (LL Work - Demo.) No change to use, egress or occupancy.
On file for this job
5 documents · 1 drawing sheet
Structural Modifications; Installation of structural steel reinforcement for walls and food service trough on 2-3, and masonry wall lintels and masonry wall details on the Mez (P1 Level) as per plans (BNP Paribas.) No change to use, egress or occupancy.
On file for this job
6 documents · 1 drawing sheet
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on 2-3rd Floors as per plans (BNP Paribas.) No change to use, egress or occupancy.
On file for this job
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 113p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralPlumbing
Issued Permit Scope
General Construction
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this job
15 documents
Change use on part of Subcellar Mezz parking garage to business/offices. Reduce occupancy load on 7th and 8th floors.
On file for this job
15 documents
DIRECT REPLACEMENT OF AIR HANDLING UNIT
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine12p · 6 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction
Modifications to add Places of Assembly on the 35th, 36th and 45th Floors as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this job
21 documents
Creation of a Place of Assembly space on the 31st floor (Meeting Hall), accessory to business occupancy.
On file for this job
7 documents
Increase in occupancy load on 27th floor. Minor interior construction work is proposed.
On file for this job
6 documents
Latest 3 of 6 filings on this floor.
Cellar9p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this job
15 documents
Change use on part of Subcellar Mezz parking garage to business/offices. Reduce occupancy load on 7th and 8th floors.
On file for this job
15 documents
Sub-Cellar16p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneral
Issued Permit Scope
General Construction
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this job
15 documents
Change use on part of Subcellar Mezz parking garage to business/offices. Reduce occupancy load on 7th and 8th floors.
On file for this job
15 documents · 2 drawing sheets
Interior Renovations: Installation of new partitions, doors, floor finishes and suspended ceilings on the P1 Level (Marketing)/ Cellar Mezz (CO) as per plans (Publicis Groupe.) No change to use, egress or occupancy.
On file for this job
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.