← Back
Office, 20+ stories, with or without commercial
AXA Equitable Center
787 7 AVENUE · BIN 1023157
💬 Discuss this project
1985Year Built
51Stories
O4Building Class
C6-6.5Zoning
1,633,544 sfGross Floor Area
48Units
LL97 Covered4 Open Violations ▸FISP: SWARMPFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: FSP 787 SEVENTH, LLC · 80,333 sf lot · 20.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 14 docs
Floor 47Under Construction31p · 9 filings · 20 docs
Floor 46Under Construction54p · 7 filings · 20 docs
Floor 45106p · 15 filings · 20 docs
Floor 44Under Construction89p · 12 filings · 20 docs
Floor 43Under Construction88p · 11 filings · 20 docs
Floor 42Under Construction37p · 10 filings · 20 docs
Floor 41Under Construction35p · 8 filings · 20 docs
Floor 40Under Construction29p · 6 filings · 20 docs
Floor 39Under Construction69p · 9 filings · 20 docs
Floor 3816p · 9 filings · 20 docs
Floor 37109p · 20 filings · 20 docs
Floor 36Under Construction72p · 14 filings · 20 docs
Floor 35112p · 18 filings · 20 docs
Floor 34Under Construction110p · 14 filings · 20 docs
Floor 33
Floor 323p · 2 filings · 8 docs
Floor 3119p · 11 filings · 20 docs
Floor 3016p · 10 filings · 20 docs
Floor 2913p · 9 filings · 20 docs
Floor 2815p · 10 filings · 20 docs
Floor 2726p · 7 filings · 20 docs
Floor 2615p · 4 filings · 20 docs
Floor 256p · 3 filings · 20 docs
Floor 244p · 2 filings · 20 docs
Floor 2348p · 7 filings · 20 docs
Floor 2260p · 6 filings · 20 docs
Floor 213p · 3 filings · 20 docs
Floor 201p · 1 filing · 8 docs
Floor 19
Floor 18
Floor 175p · 1 filing · 5 docs
Floor 16
Floor 1530p · 4 filings · 20 docs
Floor 144p · 2 filings · 12 docs
Floor 131p · 1 filing · 4 docs
Floor 126p · 4 filings · 20 docs
Floor 119p · 8 filings · 20 docs
Floor 106p · 6 filings · 20 docs
Floor 930p · 11 filings · 20 docs
Floor 819p · 10 filings · 20 docs
Floor 713p · 6 filings · 20 docs
Floor 62p · 2 filings · 17 docs
Floor 521p · 12 filings · 20 docs
Floor 424p · 18 filings · 20 docs
Floor 314p · 10 filings · 20 docs
Floor 221p · 13 filings · 20 docs
Floor 113p · 12 filings · 20 docs
Mezzanine12p · 6 filings · 20 docs
Cellar9p · 2 filings · 20 docs
Sub-Cellar16p · 5 filings · 20 docs
4 jobs · most recent 03/24/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/24/2026Signed-offGANNON CONTRACTING LLCAir Conditioning Systems
Cooling
Aaon V3-ERB-3-0-26FB-000 165,900 BTU · Rooftop Unit ×1
International Enviro-Tec MQL 165,900 BTU ×1
12/16/2025Permit IssuedJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Stulz CCD-121-W-EC 5 tons · Crac Unit ×2
COS-042-W-U-EC 3 tons · Wshp ×2
Water Furnace Versatec 500 024 2 tons · Wshp ×1
Versatec 500-024 2 tons · Wshp ×1
05/01/2025Signed-offJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Water Furnace VERSATEC 500 024 25,210 BTU · Wshp ×3
Stulz COS-042-W-U-EC 44,300 BTU · Wshp ×2
05/01/2025Permit IssuedJAMES E FITZGERALD INCAir Conditioning Systems
Cooling
Water Furnace VERSATEC 500 048 48,540 BTU · Wshp ×3
VERSATEC 500 036 35,130 BTU · Wshp ×1
VERSATEC 500 UD 240048 294,210 BTU · Wshp ×1
Versatec 500 0024 25,210 BTU · Wshp ×1
Versatec 500 036 35,130 BTU · Wshp ×1
Stulz COS-060-W-U-EC 57,200 BTU · Wshp ×1
15 jobs · most recent 09/02/2026
FiledStatusContractorScope
09/02/2026———
08/17/2026Permit IssuedPAR FIRE PROTECTION LLC—
06/15/2026Signed-offPREFERRED SPKLR AND MECH494 heads
05/27/2026Signed-offPREFERRED SPKLR AND MECH504 heads
04/30/2026Signed-offPREFERRED SPKLR AND MECH—
02/03/2026Signed-offPREFERRED SPKLR AND MECH1,548 heads
09/10/2025Signed-offPAR FIRE PROTECTION LLC10 heads
06/04/2025Signed-offPREFERRED SPKLR AND MECH98 heads
05/01/2025Signed-offPREFERRED SPKLR AND MECH2 outlets
05/01/2025Permit IssuedPREFERRED SPKLR AND MECH127 heads
05/01/2025Signed-offPREFERRED SPKLR AND MECH2 outlets
05/01/2025Signed-offPREFERRED SPKLR AND MECH6 outlets
01/22/2025Permit IssuedPREFERRED SPKLR AND MECH—
11/13/2024Permit IssuedPAR FIRE PROTECTION LLC18 heads
———31 heads
12 jobs · most recent 09/10/2026
Water/Sanitary
FiledStatusContractorScope
09/10/2026Permit IssuedPAR PLUMBING CO., INCWater/Sanitary
09/02/2026———
08/17/2026———
06/15/2026———
03/24/2026Signed-offPREFERRED MECHANICAL INCWater/Sanitary
12/16/2025Permit IssuedPREFERRED MECHANICAL INCWater/Sanitary
09/10/2025———
09/10/2025Signed-offASHLAND PLUMBING CORPWater/Sanitary
06/04/2025Signed-offPREFERRED PIPING, INCWater/Sanitary
05/01/2025Signed-offPREFERRED MECHANICAL INCWater/Sanitary
05/01/2025Signed-offPREFERRED MECHANICAL INCWater/Sanitary
05/01/2025Signed-offPREFERRED MECHANICAL INCWater/Sanitary
25 jobs · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026Permit IssuedTF ELECTRICAL CORPGeneral Wiring
04/07/2026Permit IssuedTF ELECTRICAL CORPGeneral Wiring
12/19/2025Permit IssuedFOREST ELECTRIC CORP.General Wiring
12/19/2025Permit IssuedP.E. STONE INCGeneral Wiring
12/18/2025Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
12/18/2025Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
12/18/2025Permit IssuedKLEINKNECHT ELEC. CO.,INCGeneral Wiring
10/14/2025CompleteFOREST ELECTRIC CORP.General Wiring
09/11/2025Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
08/26/2025Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
07/24/2025Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
07/24/2025Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
07/21/2025Permit IssuedP.E. STONE INCGeneral Wiring
07/21/2025CompleteP.E. STONE INCGeneral Wiring
07/11/2025CompleteBOROWIDE ELECT'L CONTR'S—
7 jobs · most recent 08/18/2026
Steel
FiledStatusContractorScope
08/18/2026Permit IssuedJT MAGEN & COMPANY INC1 scope_items
08/18/2026Permit IssuedJT MAGEN & COMPANY INC1 scope_items
04/20/2026Permit IssuedJAMES E FITZGERALD INCSteel
05/02/2025Signed-offJAMES E FITZGERALD INCSteel
05/02/2025Signed-offJAMES E FITZGERALD INCSteel
05/02/2025Signed-offJAMES E FITZGERALD INCSteel
01/17/2023Permit IssuedJT MAGEN & COMPANY INC1 scope_items
1 job · most recent 06/11/2026
Fence Scaffold
FiledStatusContractorScope
06/11/2026Permit IssuedKING HOIST & SCAFFOLDINGFence, Scaffold
1 job · most recent 04/13/2025
FiledStatusContractorScope
04/13/2025———
Building Lifecycle
All (300)Filed (65)Permit Issued (77)Signed Off (35)Facade (FISP) (3)Violation (12)Inspection (60)Objection (18)Special Inspection (30)
09/24/2026
Permit issued — Plumbing
M01448427-I1-PL
09/15/2026
Permit issued — General Construction
M01448340-I1-GC
09/15/2026
Permit issued — Mechanical Systems
M01448418-I1-MS
09/10/2026
Filed — Alteration
Install Plumbing fixtures for New bathrooms, pantry and wellness room and associated CW/sanitary piping on the 4th Floor as per plans (BNP Paribas Annex.) No change to use, egress or occupancy.
M01448427-I1
09/10/2026
Filed — Alteration
Modifications to the existing HVAC System: demolition and disconnections of HVAC equipment and ductwork on the 4th Floor as per plans (BNP Paribas Asset Management.) No change to use, egress or occupancy.
M01448418-I1
09/02/2026
Filed — Alteration
Modifications to the existing Sprinkler System: Remove existing Sprinkler heads and Install (15) new temporary sprinkler heads and associated piping for temp loop on the 48th Floor as per plans (Sidley NYC - Demo Phase.)
M01442357-I1
09/02/2026
Permit issued — Sprinklers
M01412874-I1-EW-SP
09/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ari Kamo
09/01/2026
Permit issued — General Construction
M01411752-I1-GC
09/01/2026
Permit issued — Mechanical Systems
M01412865-I1-MS
08/20/2026
Special inspection requirement — Interior lighting power
James Sullivan Jr
08/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
James Sullivan Jr
08/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
James Sullivan Jr
08/20/2026
Special inspection requirement — Shutoff dampers
James Sullivan Jr
08/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
James Sullivan Jr
08/19/2026
Special inspection requirement — Lighting controls
James Sullivan Jr
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
James Sullivan Jr
08/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
James Sullivan Jr
08/19/2026
Special inspection requirement — Final
James Sullivan Jr
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/19/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
08/19/2026
Special inspection requirement — Mechanical Systems
James Sullivan Jr
08/19/2026
Special inspection requirement — Maintenance information
James Sullivan Jr
08/18/2026
Filed — Alteration
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 2nd Floor as per plans (BNPP - Huddle Rooms.) No change to use, egress or occupancy.
M01411752-I1
08/18/2026
Filed — Alteration
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 2nd Floor as per plans (BNP/ Huddle Rooms.) No change to use, egress or occupancy.
M01412865-I1
08/17/2026
Signed off — Alteration
Install new walls, office front system, doors, new suspended ceiling, flooring and finishes on the 5th floor as per plans (Stifel/ North Floor Buildout.) No change to use, egress or occupancy.
M01246932-I1
08/17/2026
Signed off — Alteration
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 5th Floor as per plans (Stifel/ North Floor Buildout.) No change to use, egress or occupancy.
M01246958-I1
08/17/2026
Filed — Alteration
Modifications to the existing Sprinkler System: Install (2) new sprinkler heads and associated piping each on the 2nd Floor as per plans (BNP/ Huddle Room.) No change to use, egress or occupancy.
M01412874-I1
08/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
08/07/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
08/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2026
Filed — Alteration
Roof Setback Replacement at 13th floor. No change in use, egress or occupancy.
M01430691-I1
07/31/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2026
Signed off — Alteration
Minor interior demo. Removal of new suspended ceiling, ceiling tiles, flooring and finishes on the 5th floor as per plans (Stifel/ North Floor Demo.) No change to use, egress or occupancy.
M01230339-I1
07/29/2026
Signed off — Alteration
Modifications to the existing Sprinkler System: Remove (80) existing sprinkler heads and Install (18) new temporary sprinkler heads and associated piping on the 5th Floor as per plans (Stifel/ North Floor Demo.) No change to use, egress or occupancy.
M01230540-I1
07/27/2026
Signed off — Alteration
Modifications to the existing Sprinkler System: Remove (225) sprinkler heads, Install (36) temporary heads and (243) new heads and associated piping on the 45th Floor as per plans (Willkie Farr & Gallagher/ Phase 1.) No change to use, egress or occupancy.
M01209842-I1
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/21/2026
Filed — No Work
M01432556-I1
07/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/06/2026
Signed off — Alteration
Modifications to the existing HVAC System: removal of ductwork, insulations, air outlets, controls, control wiring & accessories on the 5th Floor as per plans (Stifel/ North Floor Demo.) No change to use, egress or occupancy.
M01230523-I1
07/06/2026
Signed off — Alteration
Remove Plumbing Fixtures: (1) WC, (1) Lav, (6) FDs, (5) sinks, (3) DW, (1) WD, (1) refrigerator, (2) IM and associated CW/sanitary piping on the 5th Floor as per plans (Stifel/ North Floor Demo.) No change to use, egress or occupancy.
M01230532-I1
07/02/2026
Special inspection requirement — Public Assembly Emergency Lighting
HATIM ELSAID
07/01/2026
Signed off — Alteration
Modifications to the existing Sprinkler System: Remove (242) existing heads, Install (39) temporary heads and (273) new heads and piping on the 36th Floor as per plans (WFG/ Phase 1 - Package #4.) No change to use, egress or occupancy.
M01209814-I1
06/30/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
06/30/2026
Special inspection requirement — Sprayed fire-resistant materials
James Sullivan Jr
06/22/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/22/2026
Objection resolved — Addressed
06/18/2026
Signed off — Alteration
Structural Modifications on the 36th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
M01209769-I1
06/18/2026
Signed off — Alteration
Structural Modifications on the 45-46th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
M01209772-I1
06/18/2026
Signed off — Alteration
Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
M01209777-I1
06/18/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
Latest 60 of 300 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIGNEXPO2007/08/2026
787 SEVENTH AVE607/08/2026
RXR PROPERTY MANAGEMENT LLC503/22/2026
FSP 787 SEVENETH30003/22/2026
CBRE65303/22/2026
BOSTON PROPERTIES103/22/2026
THE OWNER OF 781 SEVENTH203/22/2026
TO OWNER OF 781 SEVENTH A103/22/2026
COMPASS MANAGEMENT LEASEING7603/22/2026
EQUITABLE LIFE ASSURANCE SOC1303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/27/2016$1.9B—787 HOLDINGS, LLC → FSP 787 SEVENTH, LLC$1,183/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP27403/21/2026
A1 EXPEDITING SERVICE CORP.7803/21/2026
VSA403/21/2026
SKYLINE ACCESS103/21/2026
E-Z PERMIT NY403/21/2026
MUNICIPAL BUILDING CONSULTANTS403/21/2026
AE DESIGN SOLUTION803/21/2026
LOUIS STRIAR2403/21/2026
JS ARCHITECTURE DESIGN203/21/2026
CNS INSPECTION SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAMES E FITZGERALD INCGeneral Contractor9709/16/2026
JT MAGEN & COMPANY INCGeneral Contractor5809/02/2026
GANNON CONTRACTING LLCGeneral Contractor3507/08/2026
STRUCTURE TONE, LLCGeneral Contractor2607/08/2026
PREFERRED SPKLR AND MECHFire Protection2307/08/2026
PAR FIRE PROTECTION LLCFire Protection1809/03/2026
PREFERRED MECHANICAL INCPlumbing1707/08/2026
PAR PLUMBING CO., INCPlumbing1509/25/2026
ABCO-PEERLESS SPRKLR CORPFire Protection1407/08/2026
ASHLAND PLUMBING CORPPlumbing1107/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor1004/09/2026
EAGLE SCAFFOLDING SVCS INCGeneral Contractor907/08/2026
SIRINA FIRE PROT CORPFire Protection807/08/2026
RED HOOK SIGN ELECTScaffold607/08/2026
LHOTSE CORPGeneral Contractor507/08/2026
HENEGAN CONSTRUCTION CO.,General Contractor403/21/2026
RALPH OCCHIPINTIElectrical403/21/2026
ADCO ELEC'L CORPElectrical403/22/2026
CAD SIGNS NYCScaffold407/08/2026
STARR INDUSTRIES LLCGeneral Contractor303/21/2026
TRU-ART SIGNScaffold207/08/2026
BAYSIDE REFRIGERATION INC.General Contractor203/21/2026
COMMODORE CONSTRUCT CORPGeneral Contractor203/21/2026
CPM BUILDERS INCGeneral Contractor203/21/2026
KING HOIST & SCAFFOLDINGGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CODEGREEN5108409/10/2026
AK ENGINEERING PC6782409/02/2026
ALAN MARGOLIN & ASSOC4233306/15/2026
SKYLINE ENGINEERING, PLLC2672609/26/2025
MILROSE CONSULTANTS LLC20031110/25/2024
METROSPEC SIA6420108/22/2024
TAN ENGINEERING, P.C.1291308/22/2024
SOCOTEC ENGINEERING49834207/24/2024
KATZ ENGINEERING2382505/13/2024
GREEN RIVER ENVIRONMENTAL7841205/06/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC09/24/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC09/15/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC09/15/2026
DOB NOWSprinklersPermit IssuedPAR FIRE PROTECTION LLC09/02/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC09/01/2026
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC09/01/2026
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING06/11/2026
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING06/11/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC06/03/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC06/02/2026
DOB NOWStructuralSigned-offCARLITOS CONTRACTING CORP05/14/2026
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC05/14/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC05/14/2026
DOB NOWStructuralSigned-offJAMES E FITZGERALD INC05/14/2026
DOB NOWStructuralSigned-offJAMES E FITZGERALD INC05/14/2026
DOB NOWStructuralPermit IssuedJAMES E FITZGERALD INC05/13/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC05/13/2026
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC05/13/2026
DOB NOWPlumbingPermit IssuedPREFERRED MECHANICAL INC12/30/2025
DOB NOWStandpipePermit IssuedPREFERRED SPKLR AND MECH12/30/2025
DOB NOWSprinklersPermit IssuedPREFERRED SPKLR AND MECH12/30/2025
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC12/26/2025
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC12/26/2025
DOB NOWSprinklersPermit IssuedPREFERRED SPKLR AND MECH12/24/2025
DOB NOWPlumbingPermit IssuedPREFERRED MECHANICAL INC12/24/2025
DOB NOWStandpipePermit IssuedPREFERRED SPKLR AND MECH12/24/2025
DOB NOWPlumbingPermit IssuedPREFERRED MECHANICAL INC12/23/2025
DOB NOWGeneral ConstructionPermit IssuedJAMES E FITZGERALD INC12/23/2025
DOB NOWStandpipePermit IssuedPREFERRED SPKLR AND MECH12/23/2025
DOB NOWSprinklersPermit IssuedPREFERRED SPKLR AND MECH12/23/2025
DOB NOWStructuralPermit IssuedJAMES E FITZGERALD INC12/19/2025
DOB NOWStructuralPermit IssuedJAMES E FITZGERALD INC12/19/2025
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC12/19/2025
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC12/19/2025
DOB NOWMechanical SystemsPermit IssuedJAMES E FITZGERALD INC12/19/2025
DOB NOWMechanical SystemsSigned-offJT MAGEN & COMPANY INC10/02/2025
DOB NOWSprinklersSigned-offLAWRENCE J. LEVINE09/15/2025
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC09/15/2025
DOB NOWPlumbingSigned-offASHLAND PLUMBING CORP09/11/2025
+ 60 more permits on file
▾Field Inspections (DOB CAP) — 218
DateTypeResultReport
09/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/30/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/22/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
06/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/27/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/29/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2026Pass-Final PL - UndergroundPassView ↗
Latest 25 of 218.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/02/2026Fire-Resistant Penetrations and JointsAri Kamospecial
08/20/2026HVAC-R and service water piping design and insulationJames Sullivan Jrenergy_progress
08/20/2026Shutoff dampersJames Sullivan Jrenergy_progress
08/20/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
08/20/2026HVAC-R and service water heating equipmentJames Sullivan Jrenergy_progress
08/20/2026Interior lighting powerJames Sullivan Jrenergy_progress
08/20/2026HVAC-R and service water heating system controlsJames Sullivan Jrenergy_progress
08/19/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
08/19/2026Post-installed AnchorsJames Sullivan Jrspecial
08/19/2026Mechanical SystemsJames Sullivan Jrspecial
08/19/2026Energy Code Compliance InspectionsJames Sullivan Jrprogress
08/19/2026Maintenance informationJames Sullivan Jrenergy_progress
08/19/2026FinalJames Sullivan Jrprogress
08/19/2026Duct leakage testing, insulation and designJames Sullivan Jrenergy_progress
08/19/2026Lighting controlsJames Sullivan Jrenergy_progress
08/17/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
08/06/2026Sprinkler SystemsAri Kamospecial
07/02/2026Public Assembly Emergency LightingHATIM ELSAIDprogress
06/30/2026Sprayed fire-resistant materialsJames Sullivan Jrspecial
06/30/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
06/30/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
06/18/2026Sprinkler SystemsYoung Suhspecial
06/18/2026Post-installed AnchorsYoung Suhspecial
06/18/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/10/2026Sprinkler SystemsYoung Suhspecial
Latest 25 of 150.
▾Documents — 7,743 on file (BIS + DOB NOW)
▸Plans & Drawings361
▸DOB NOWPlans/Sketch277
09/15/2026M01448418-I1Request digital key ↗
09/15/2026M01448427-I1Request digital key ↗
09/14/2026M01442357-I1Request digital key ↗
Showing 3 of 277 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler17
09/05/2026M00200626-I1Request digital key ↗
09/05/2026M00229792-I1Request digital key ↗
09/05/2026M00229536-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems17
09/05/2026M00196761-I1Request digital key ↗
09/05/2026M00200605-I1Request digital key ↗
09/05/2026M00212060-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing16
09/05/2026M00212074-I1Request digital key ↗
09/05/2026M00229459-I1Request digital key ↗
09/05/2026M00301480-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly10
09/05/2026M00214510-I1Request digital key ↗
09/05/2026M00226989-I1Request digital key ↗
Showing 2 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sign3
09/05/2026M00260939-I1Request digital key ↗
09/05/2026M00260914-I1Request digital key ↗
09/05/2026M00260835-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00475141-I1Request digital key ↗
09/04/2026M00477163-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00247642-I1Request digital key ↗
09/04/2026M00375426-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00260852-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00424329-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00406160-I1Request digital key ↗
▸Applications & Permits1,119
▸BISPLAN / WORK APPROVAL APPLICATION660
03/04/2026140945798Open ↗
01/21/2025123806907Open ↗
01/09/2025123806907Open ↗
Showing 3 of 660 on file for this type
▸BISWORK PERMIT APPLICATION429
11/12/2021123858405Open ↗
Showing 1 of 429 on file for this type
▸BISPLACE OF ASSEMBLY21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISZONING RESOLUTION DETERMINATION3
10/29/2021123858405Open ↗
Showing 1 of 3 on file for this type
▸Seals & Professional Certifications2,286
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION964
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 964 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature359
09/15/2026M01448418-I1Open ↗
09/15/2026M01448427-I1Open ↗
09/14/2026M01442357-I1Open ↗
Showing 3 of 359 on file for this type
▸DOB NOWProgress Inspector Seal & Signature236
09/30/2026M00552822-I1Open ↗
09/30/2026M00552822-I1Open ↗
09/30/2026M01209696-I1Open ↗
Showing 3 of 236 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature220
09/30/2026M00552822-I1Open ↗
09/30/2026M01209696-I1Open ↗
09/28/2026M01318195-I1Open ↗
Showing 3 of 220 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST192
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 192 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT179
11/08/2021141005962Open ↗
Showing 1 of 179 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 101 on file for this type
▸BISPC FULL REPORT16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
11/08/2021141005962Open ↗
Showing 1 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
11/08/2021141005962Open ↗
Showing 1 of 9 on file for this type
▸Trade Schedules & Equipment522
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE134
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 134 on file for this type
▸BISSELF-CERT PLUMBING NOTICE128
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 128 on file for this type
▸BISSCHEDULE B - PLUMBING75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA66
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 66 on file for this type
▸BISEQUIPMENT USE PERMITS55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT40
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 40 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8524
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸Safety & Tenant Protection24
▸BISSTREET TREE CHECKLIST13
10/15/2021120559083Open ↗
06/25/2021120559083Open ↗
Showing 2 of 13 on file for this type
▸DOB NOWStreet Tree Checklist9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos665
▸DOB NOWDEP ACP-5: Asbestos Assessment Report312
09/15/2026M01448418-I1Open ↗
09/15/2026M01448427-I1Open ↗
09/14/2026M01442357-I1Open ↗
Showing 3 of 312 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)217
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 217 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'110
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 110 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸Energy Compliance372
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS203
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 203 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS79
05/16/2022123858398Open ↗
05/12/2022123858398Open ↗
04/12/2022123858398Open ↗
Showing 3 of 79 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY28
05/16/2022123858398Open ↗
03/17/2022123891814Open ↗
03/17/2022123858398Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: ENERGY17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)9
03/04/2026140945798Open ↗
04/01/2024140842097Open ↗
03/26/2024123224858Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS6
03/04/2026140945798Open ↗
03/20/2024140842097Open ↗
11/07/2023140988929Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL3
04/01/2024140842097Open ↗
08/02/2023123858405Open ↗
08/23/2022140935059Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports107
▸BISTECHNICAL REPORT: RESPONSIBILITY90
03/27/2023140971919Open ↗
02/14/2023140973007Open ↗
08/23/2022140935059Open ↗
Showing 3 of 90 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)5
11/11/2021123858405Open ↗
Showing 1 of 5 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)4
03/04/2026140945798Open ↗
11/07/2023140988929Open ↗
01/25/2022123086711Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS4
11/07/2023140988929Open ↗
02/09/2023140973007Open ↗
12/14/2021120559083Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs614
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST413
03/04/2026140945798Open ↗
04/01/2024140842097Open ↗
02/13/2024140988929Open ↗
Showing 3 of 413 on file for this type
▸BISADMINISTRATIVE OBJECTIONS115
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 115 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE33
03/12/2024120559083Open ↗
02/07/2022120559083Open ↗
12/23/2021120559083Open ↗
Showing 3 of 33 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISFINAL8
03/04/2026140945798Open ↗
04/01/2024140842097Open ↗
02/06/2024140988929Open ↗
Showing 3 of 8 on file for this type
▸Cost, Insurance & Ownership814
▸BISCOST AFFIDAVIT807
04/01/2024140842097Open ↗
02/14/2023140973007Open ↗
08/23/2022140935059Open ↗
Showing 3 of 807 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
03/04/2026140945798Open ↗
03/20/2024140842097Open ↗
11/07/2023140988929Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms715
▸BISEFILING COVER SHEET351
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 351 on file for this type
▸BISBOROUGH INTAKE FORM226
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 226 on file for this type
▸BISADDITIONAL INFORMATION120
04/08/2024120559083Open ↗
02/07/2022123858405Open ↗
01/04/2022123891814Open ↗
Showing 3 of 120 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
11/08/2021141005962Open ↗
Showing 1 of 18 on file for this type
▸Other Documents87
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
03/04/2026140945798Open ↗
Showing 1 of 11 on file for this type
▸BISPLOT DIAGRAM11
10/15/2021120559083Open ↗
06/25/2021120559083Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWProperty Ownership Certification9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWLuminous Egress Path Markings Report3
09/03/2026M00528579-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWAlternate Plan 242
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 172
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 162
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 152
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 142
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 82
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 62
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 102
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 212
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 222
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 182
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 202
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 112
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 192
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 232
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 92
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 122
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type