← Back
BuildNYC
Elevator apt, semi-fireproof without stores
788 ARNOW AVENUE
BRONX · BIN 2053720
💬 Discuss this project
1929Year Built
6Stories
D1Building Class
R6Zoning
46,008 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized141 Active Violations 6 likely answered 1 old, status unconfirmed ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: 788 Arnow Estates · 10,000 sf lot · 4.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade restoration work with suspended scaffold3p · 2 filings · 11 docs
Floor 6Facade repair work5p · 1 filing · 8 docs
Floor 5Facade repair work5p · 1 filing · 8 docs
Floor 4Facade repair work5p · 1 filing · 8 docs
Floor 3Facade repair work5p · 1 filing · 8 docs
Floor 2Facade repair work5p · 1 filing · 8 docs
Floor 1Facade repair work5p · 1 filing · 8 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction6p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Arnow303/21/2026
788 Arnow Estates103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Empire Design109/15/2025
Arquitectura Varela112/02/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DNS Fine BuildersGeneral Contractor207/08/2026
Alpha ScaffoldingScaffold207/08/2026
J G GNRL ContractGeneral Contractor103/21/2026
A-Awan ConstructionGeneral Contractor206/27/2011
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Empire Design5474109/15/2025
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
09/29/2026
Signed off — Alteration
APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLANS AND LIFTING OF NYC DOB-ISSUED ECB VIOLATION # 35716897P & 35689225L. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01287741-I1
09/25/2026
Elevator Category 1 inspection report filed
09/11/2026
Signed off — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM AT 788 ARNOW AVENUE, BRONX, FOR FACADE RESTORATION WORK. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
X01419773-I1
09/10/2026
Permit issued — Suspended Scaffold
X01419773-I1-SC
215 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedDNS Fine Builders09/10/2026
DOB NOWGeneral ConstructionSigned-offDNS Fine Builders05/19/2026
DOB NOWSidewalk ShedPermit IssuedAlpha Scaffolding12/04/2025
DOB NOWGeneral ConstructionSigned-offDNS Fine Builders10/22/2025
DOB NOWSidewalk ShedPermit IssuedAlpha Scaffolding12/13/2024
BISOTISSUEDA-Awan Construction06/27/2011
BISOTISSUEDA-Awan Construction05/13/2011
BISEQISSUEDJ & G GNRL04/27/2011
BISFBISSUEDG Bauer03/25/2009
1 project · most recent 12/14/2024
FiledStatusContractorScope
12/14/2024Permit IssuedWCK Electric—
1 project · most recent 06/21/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/21/2026Permit IssuedDNS Fine BuildersSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/15/2025MasonryMd Rashidspecial
09/15/2025Structural Stability – Alterations of existing buildingsMd Rashidspecial
09/15/2025Tenant Protection Plan ComplianceMd Rashidspecial
09/15/2025FinalMd Rashidprogress
52 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account