← Back
BuildNYC
General warehouse
788 EAST 92ND STREET
BROOKLYN · Canarsie · BIN 3430128
💬 Discuss this project
1965Year Built
1Stories
E1Building Class
M1-1Zoning
44,000 sfGross Floor Area
5Units
LL97 Covered2 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
General warehouse · Owner of record: Consolidated Edison Company of New York · 46,000 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofConedison Gateway Park SubstationUnder Construction8p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
Floor 1Conedison Gateway Park SubstationUnder Construction115p · 2 filings · 20 docs
MezzanineUnder Construction103p · 1 filing · 20 docs
Site & exteriorConedison Gateway Park SubstationUnder Construction149p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolidated Edison Company of New York2410/10/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCD Group1403/21/2026
Consolidated Edison Company of New York203/21/2026
Municipal Building Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GianfiaGeneral Contractor508/05/2026
GianfiaScaffold207/17/2026
Sal Vio ConstructionScaffold107/30/2026
JCC ConstructionPlumbing105/29/2026
Par Plumbing CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons1061005/08/2026
Building Lifecycle
All (82)Filed (15)Permit Issued (10)Signed Off (1)Violation (8)Inspection (2)Objection (19)Special Inspection (27)
10/17/2026
Objection raised — Other
10/09/2026
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-Z2
08/12/2026
Violation issued (ECB, open)
Cranes and Derricks
08/12/2026
Violation issued (ECB, open)
Cranes and Derricks
08/04/2026
Permit issued — General Construction
B01187717-I1-GC
08/03/2026
Permit issued — Structural
B01187717-Z3-ST
07/29/2026
Permit issued — Supported Scaffold
B01434377-I1-SF
07/28/2026
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01434377-I1
07/16/2026
Permit issued — Construction Fence
B01187717-S9-FN
07/15/2026
Signed off — Alteration
SITE IMPROVEMENT SCOPE INCLUDES THE INSTALLATION OF BELOW GRADE TRANSMISSION AND DISTRIBUTION CONDUIT WITH THEIR CORRESPONDING SUPPORTS.
B01214244-I1
07/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/15/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/15/2026
Objection resolved — Addressed
06/11/2026
Permit issued — Plumbing
B01187717-S3-PL
06/04/2026
Objection resolved — Addressed
05/27/2026
Permit issued — Plumbing
B01187717-S2-PL
05/16/2026
Objection raised — Other
05/08/2026
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-Z3
05/01/2026
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Structural Cold-Formed Steel
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
05/01/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
03/25/2026
Objection resolved — Addressed
02/27/2026
Objection resolved — Addressed
02/13/2026
Violation issued (ECB, closed)
Construction
02/13/2026
Violation issued (ECB, closed)
Construction
02/13/2026
Violation issued (ECB, closed)
Unknown
01/28/2026
Permit issued — Foundation
B01187717-S1-FO
11/14/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
11/14/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
11/07/2025
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-P1
11/03/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
11/03/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
10/30/2025
Permit issued — Support of Excavation
B01187717-Z1-SE
10/27/2025
Objection resolved — Addressed
10/09/2025
Objection raised — Other
09/26/2025
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-Z1
07/31/2025
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-S9
07/31/2025
Permit issued — Construction Fence
B01187717-S9-FN
07/14/2025
Permit issued — Support of Excavation
B01214244-I1-SE
07/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
06/27/2025
Filed — Alteration
SITE IMPROVEMENT SCOPE INCLUDES THE INSTALLATION OF BELOW GRADE TRANSMISSION AND DISTRIBUTION CONDUIT WITH THEIR CORRESPONDING SUPPORTS.
B01214244-P1
05/02/2025
Objection resolved — Addressed
05/01/2025
Objection resolved — Addressed
04/25/2025
Filed — Alteration
SITE IMPROVEMENT SCOPE INCLUDES THE INSTALLATION OF BELOW GRADE TRANSMISSION AND DISTRIBUTION CONDUIT WITH THEIR CORRESPONDING SUPPORTS.
B01214244-I1
04/18/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
03/27/2025
Objection raised — Other
03/27/2025
Objection raised — Other
03/27/2025
Objection raised — Other
03/27/2025
Objection raised — Other
03/27/2025
Objection raised — Other
03/27/2025
Objection raised — Other
03/27/2025
Objection raised — Other
03/14/2025
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-S3
03/13/2025
Filed — New Building
EARLY FOUNDATIONS INSTALLATION OF DETENTION TANK, SITE CONNECTION - SANITARY, SITE CONNECTION- STORM & TWO WATER CONNECTIONS. THE ERECTION OF A 33,551.88 SF SINGLE STORY NEW BUILDING FOR USE BY CON EDISON AS AN ELECTRIC UTILITY SUBSTATION - USE GROUP IV(B
B01187717-S2
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGianfia08/04/2026
DOB NOWStructuralPermit IssuedGianfia08/03/2026
DOB NOWSupported ScaffoldPermit IssuedSal Vio Construction07/29/2026
DOB NOWConstruction FencePermit IssuedGianfia07/16/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co06/11/2026
DOB NOWPlumbingPermit IssuedJCC Construction05/27/2026
DOB NOWFoundationPermit IssuedGianfia01/28/2026
DOB NOWSupport of ExcavationPermit IssuedGianfia10/30/2025
DOB NOWConstruction FencePermit IssuedGianfia07/31/2025
DOB NOWSupport of ExcavationSigned-offGianfia07/14/2025
1 project · most recent 10/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/09/2026Permit IssuedPar Plumbing CoStorm, Water/Sanitary
2 projects · most recent 10/09/2026
Steel Concrete
FiledStatusContractorScope
10/09/2026Permit IssuedGianfiaSteel, Concrete
06/27/2025Signed-offGianfia2 scope_items
2 projects · most recent 10/09/2026
Fence Scaffold
FiledStatusContractorScope
10/09/2026Permit IssuedGianfiaFence
07/28/2026Permit IssuedSal Vio ConstructionScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
05/01/2026Post-installed AnchorsGEORGE GHEBRYALspecial
05/01/2026Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
05/01/2026Structural Steel - DetailsGEORGE GHEBRYALspecial
05/01/2026Structural Cold-Formed SteelGEORGE GHEBRYALspecial
05/01/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
05/01/2026FinalGEORGE GHEBRYALprogress
05/01/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
05/01/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
11/14/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
11/14/2025Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
11/03/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
11/03/2025Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
07/11/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
02/27/2025Subgrade InspectionsGEORGE GHEBRYALspecial
02/27/2025Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
02/27/2025Underpinning and alternate methods of support of buildings and adjacent propertyGEORGE GHEBRYALspecial
02/27/2025Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
02/27/2025FinalGEORGE GHEBRYALprogress
02/27/2025Footing and FoundationGEORGE GHEBRYALprogress
02/27/2025Structural Steel - WeldingGEORGE GHEBRYALspecial
02/27/2025Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
02/27/2025Structural Steel - DetailsGEORGE GHEBRYALspecial
02/27/2025Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
02/27/2025Post-installed AnchorsGEORGE GHEBRYALspecial
02/27/2025Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
Latest 25 of 27.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Conedison Gateway Park SubstationTelecom site—
Project B01434377 Alteration · Permit Entire · 07/28/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/21/2026B01214244-P1Request digital key ↗
08/21/2026B01214244-I1Request digital key ↗
08/17/2026B01187717-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits4
▸DOB NOWDEP Stormwater Construction Permit3
08/15/2026B01187717-S1Open ↗
08/15/2026B01187717-I1Open ↗
08/14/2026B01187717-S4Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/11/2025340916646Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01187717-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01187717-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01187717-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/21/2026B01214244-I1Open ↗
08/21/2026B01214244-P1Open ↗
08/17/2026B01187717-Z3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01187717-Z3Open ↗
08/27/2026B01214244-I1Open ↗
08/27/2026B01187717-S1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/11/2025340916646Open ↗
07/11/2025340916646Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01187717-Z3Open ↗
08/27/2026B01187717-S1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026B01187717-I1Open ↗
08/14/2026B01187717-S4Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist2
08/15/2026B01187717-I1Open ↗
08/14/2026B01187717-S4Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/15/2026B01187717-I1Open ↗
08/14/2026B01187717-S4Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/17/2026B01187717-P1Open ↗
08/15/2026B01187717-S1Open ↗
08/14/2026B01187717-Z1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026B01187717-S1Open ↗
08/14/2026B01187717-Z1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/11/2025340916646Open ↗
▸Other Documents8
▸DOB NOWAdjoining Owners Notification3
08/15/2026B01187717-S7Open ↗
08/14/2026B01187717-Z1Open ↗
08/13/2026B01214244-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026B01187717-I1Open ↗
08/14/2026B01187717-S4Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01187717-I1Open ↗
08/14/2026B01187717-S4Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01187717-I1Open ↗