← Back
Single or multiple dwelling with stores or offices
788 LINCOLN PLACE
BROOKLYN · BIN 3032653
💬 Discuss this project
1900Year Built
3Stories
S9Building Class
R6AZoning
6,650 sfGross Floor Area
5Units
30 Open Violations 27 unresolved · 3 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 788 LINCOLN PLACE LLC · 2,500 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingOther
Roof2p · 1 filing · 17 docs
Floor 120p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GIANT CLEANERS INC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2016$1.3M—— → —$195/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TSF ENGINEERING, PC207/07/2026
EDIFICE DRAFTING AND SERVICES104/16/2026
H G LEE ARCHITECT PC706/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLBG P & H INCPlumbing207/08/2026
GERBERT BONHOMMEElectrical103/21/2026
ILLUMINATIONS UNLMTD ELECElectrical103/22/2026
BONHOMME GERBERTElectrical103/21/2026
TAYLOR MADE CONTR. LLCGeneral Contractor107/08/2026
PP COUSIN INCPlumbing103/22/2026
JEFFERSON NECKLESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HG LEE ARCHITECT PC2554706/15/2023
Building Lifecycle
All (122)Filed (10)Permit Issued (2)Violation (33)Objection (54)Special Inspection (23)
08/26/2026
Objection resolved — Addressed
08/20/2026
Objection raised — Scope
08/18/2026
Objection resolved — Addressed
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
08/12/2026
Special inspection requirement — Maintenance information
08/10/2026
Objection resolved — Addressed
07/16/2026
Objection resolved — Addressed
07/15/2026
Objection raised — Scope
07/14/2026
Objection resolved — Addressed
07/14/2026
Objection resolved — Addressed
07/08/2026
Objection raised — Admin
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Scope
07/08/2026
Objection raised — Scope
07/07/2026
Filed — Alteration CO
Addition of one unit on the third floor. No change to bulk of existing building.
B01373562-S1
07/06/2026
Filed — Alteration CO
Addition of one unit on the third floor. No change to bulk of existing building.
B01373562-S2
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/02/2026
Special inspection requirement — Maintenance information
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/09/2026
Special inspection requirement — Final
06/09/2026
Special inspection requirement — Mechanical Systems
04/20/2026
Objection raised — Zoning
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection raised — Scope
04/20/2026
Objection resolved — Resolved
04/16/2026
Filed — Alteration CO
Addition of one unit on the third floor. No change to bulk of existing building.
B01373562-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/15/2023
Filed — Alteration
NO CHANGE IN USE, EGRESS, AND OCCUPANCY; 1- NEW 2 PIECE BATH RM W/ LAV. SINK & TOILET TO BE ADA ACCESSIBLE ON FIRST FLOOR 2- NEW COOKING EQUIPMENT (1 GAS GRIDDLE, 1 GAS FRYER, 1 NEW 6 BURNER GAS RANGE, 2 NATURAL GAS HOT FOOD); SEE COMMENT
B00588685-P3
06/12/2023
Special inspection requirement — Energy Code Compliance Inspections
He Gin Lee
06/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
He Gin Lee
05/16/2023
Filed — Alteration
NO CHANGE IN USE, EGRESS, AND OCCUPANCY; 1- NEW 2 PIECE BATH RM W/ LAV. SINK & TOILET TO BE ADA ACCESSIBLE ON FIRST FLOOR 2- NEW COOKING EQUIPMENT (1 GAS GRIDDLE, 1 GAS FRYER, 1 NEW 6 BURNER GAS RANGE, 2 NATURAL GAS HOT FOOD); SEE COMMENT
B00588685-P2
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/16/2023
Permit issued — Plumbing
B00588685-I1-PL
10/31/2022
Filed — Alteration
B00659168-I1
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLBG P & H INC02/16/2023
DOB NOWGeneral ConstructionPermit IssuedTAYLOR MADE CONTR. LLC03/22/2022
BISPLISSUEDPP COUSIN INC08/25/2021
BISOTISSUEDNY GENESIS BUILDERS CORP01/13/2021
BISOTISSUEDSJ EMPIRE CORP12/12/2019
BISOTISSUEDSJ EMPIRE CORP04/25/2019
BISFBISSUEDAPRA FO BYERS GRP INC03/21/2008
1 project · most recent 07/07/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026——Air Conditioning Systems
Cooling
Lg ZRUM024GSSSO 27,000 BTU · Vrf Outdoor ×1
ZRUN024GSSSO 27,000 BTU · Vrf Outdoor ×1
2 projects · most recent 07/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/07/2026——Gas, Water/Sanitary
06/15/2023Permit IssuedPLBG P & H INCGas, Water/Sanitary
4 projects · most recent 06/13/2022
General Wiring HVAC Wiring
FiledStatusContractorScope
06/13/2022Permit IssuedSPICE ELECTRIC COMPANYGeneral Wiring
10/13/2021CompleteILLUMINATIONS UNLMTD ELECGeneral Wiring
09/03/2019Permit IssuedILLUMINATIONS UNLMTD ELECHVAC Wiring
07/18/2019CancelledILLUMINATIONS UNLMTD ELECGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/12/2026Energy Code Compliance Inspections—progress
08/12/2026Maintenance information—energy_progress
07/02/2026HVAC-R and service water heating equipment—energy_progress
07/02/2026Maintenance information—energy_progress
07/02/2026HVAC-R and service water piping design and insulation—energy_progress
07/02/2026Tenant Protection Plan Compliance—special
07/02/2026Fire-Resistant Penetrations and Joints—special
07/02/2026HVAC-R and service water heating system controls—energy_progress
06/22/2026HVAC-R and service water piping design and insulation—energy_progress
06/22/2026HVAC-R and service water heating system controls—energy_progress
06/22/2026HVAC-R and service water heating equipment—energy_progress
06/09/2026Tenant Protection Plan Compliance—special
06/09/2026Final—progress
06/09/2026Mechanical Systems—special
06/12/2023Energy Code Compliance InspectionsHe Gin Leeprogress
06/12/2023Fire-Resistant Penetrations and JointsHe Gin Leespecial
08/31/2022Interior lighting powerHe Gin Leeenergy_progress
08/31/2022Lighting controlsHe Gin Leeenergy_progress
08/31/2022Energy Code Compliance InspectionsHe Gin Leeprogress
08/31/2022Fire-Resistance Rated ConstructionHe Gin Leeprogress
08/31/2022Fire-Resistant Penetrations and JointsHe Gin Leespecial
08/18/2022Energy Code Compliance InspectionsHe Gin Leeprogress
08/18/2022Fire-Resistant Penetrations and JointsHe Gin Leespecial
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026B01373562-S2Request digital key ↗
09/03/2026B01373562-I1Request digital key ↗
08/28/2026B00659168-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits22
▸DOB NOWLPC Approval/Permit11
08/14/2026B01373562-S1Open ↗
08/14/2026B01373562-S2Open ↗
08/13/2026B00659168-P1Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION6
01/19/2021321944526Open ↗
12/13/2019321944526Open ↗
07/16/2019321944526Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
08/19/2021321944526Open ↗
10/30/2020321944526Open ↗
11/07/2019321944526Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01373562-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B00588672-I1Open ↗
08/28/2026B00588672-P1Open ↗
08/28/2026B00659168-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/30/2026B00659168-P1Open ↗
09/30/2026B00659168-P1Open ↗
09/30/2026B00659168-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026B00659168-P1Open ↗
09/01/2026B00588672-I1Open ↗
08/28/2026B00588685-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/26/2019321944526Open ↗
03/21/2008310077813Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/26/2019321944526Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/26/2019321944526Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING1
10/30/2020321944526Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/26/2019321944526Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/10/2008310077813Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
04/26/2019321944526Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01373562-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01373562-I1Open ↗
08/15/2026B00588672-I1Open ↗
08/14/2026B00588672-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
04/26/2019321944526Open ↗
04/26/2019321944526Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/10/2008310077813Open ↗
▸DOB NOWACP5/20/21 or V51
08/27/2026B00588685-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/13/2019321944526Open ↗
04/26/2019321944526Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/26/2021321944526Open ↗
12/26/2021321944526Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/26/2021321944526Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/03/2022321944526Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSUPERSEDING LETTER1
01/19/2021321944526Open ↗
▸BISLANDMARKS SIGNOFF1
03/11/2022321944526Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/10/2008310077813Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/26/2019321944526Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
04/26/2019321944526Open ↗
03/21/2008310077813Open ↗
03/21/2008310077813Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/03/2022321944526Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
08/19/2021321944526Open ↗
11/12/2020321944526Open ↗
11/14/2019321944526Open ↗
▸BISEFILING COVER SHEET1
04/26/2019321944526Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026B01373562-I1Open ↗