← Back
Over six families without stores
788 LINDEN BOULEVARD
BROOKLYN · BIN 3102155
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R5Zoning
20,880 sfGross Floor Area
23Units
Rent Stabilized104 Open Violations 101 unresolved · 3 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: E S D LLC · 6,000 sf lot · 3.48 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
784 LINDEN BOULEVARD1207/08/2026
E S D LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.305/20/2022
KMP DESIGN & ENGINEERING PLLC105/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMP DESIGN ENGINEERING203/21/2026
NEW YORK ENGINEERING ASSOCIATES P C603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SERVICE TECH MECH&PLBG INPlumbing607/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851205/20/2022
KMP DESIGN & ENGINEERING1630105/13/2021
Building Lifecycle
All (85)Filed (4)Permit Issued (7)Signed Off (3)Violation (60)Inspection (5)Special Inspection (6)
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
A
04/21/2025
Violation issued (HPD, open)
C
04/21/2025
Violation issued (HPD, open)
C
11/15/2024
Signed off — Alteration
REPLACE BOILER AND GAS BURNER. FILED IN CONJUNCTION WITH EMERGENCY LAA NO. B00715565-I1.
B00717514-I1
11/15/2024
Signed off — Alteration
B00730516-I1
11/15/2024
Signed off — Alteration
GAS CONNECTION FOR REPLACEMENT BURNER.
B00717618-I1
09/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/24/2024
Permit issued — Boiler Equipment
B00730516-I1-BE
06/24/2024
Permit issued — Plumbing
B00717618-I1-PL
06/24/2024
Permit issued — Boiler Equipment
B00717514-I1-BE
06/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/10/2024
Violation issued (HPD, closed)
A
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/23/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
09/12/2022
Violation issued (HPD, closed)
C
09/12/2022
Violation issued (HPD, open)
B
09/12/2022
Violation issued (HPD, open)
C
09/12/2022
Violation issued (HPD, open)
B
09/12/2022
Violation issued (HPD, open)
B
09/12/2022
Violation issued (HPD, open)
C
09/12/2022
Violation issued (HPD, open)
B
09/12/2022
Violation issued (HPD, closed)
C
09/12/2022
Violation issued (HPD, closed)
C
09/12/2022
Violation issued (HPD, open)
B
05/28/2022
Permit issued — Boiler Equipment
B00730516-I1-BE
05/20/2022
Filed — Alteration
B00730516-I1
05/20/2022
Permit issued — Plumbing
B00717618-I1-PL
05/20/2022
Permit issued — Boiler Equipment
B00717514-I1-BE
05/05/2022
Filed — Alteration
REPLACE BOILER AND GAS BURNER. FILED IN CONJUNCTION WITH EMERGENCY LAA NO. B00715565-I1.
B00717514-I1
05/05/2022
Filed — Alteration
GAS CONNECTION FOR REPLACEMENT BURNER.
B00717618-I1
04/13/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/12/2022
Special inspection requirement — Heating Systems
LOUIS ARENA
04/12/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
04/12/2022
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/12/2022
Special inspection requirement — Maintenance information
LOUIS ARENA
04/12/2022
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
04/02/2022
Violation issued (HPD, closed)
C
04/02/2022
Violation issued (HPD, closed)
C
04/02/2022
Violation issued (HPD, closed)
C
04/02/2022
Violation issued (HPD, closed)
B
04/02/2022
Violation issued (HPD, closed)
C
03/30/2022
Violation issued (HPD, closed)
A
03/30/2022
Violation issued (HPD, closed)
C
03/30/2022
Violation issued (HPD, closed)
B
03/27/2022
Violation issued (HPD, closed)
C
03/27/2022
Violation issued (HPD, closed)
C
03/27/2022
Violation issued (HPD, closed)
C
02/25/2022
Violation issued (HPD, closed)
A
12/17/2021
Violation issued (HPD, closed)
A
12/17/2021
Violation issued (HPD, open)
B
12/17/2021
Violation issued (HPD, closed)
B
12/17/2021
Violation issued (HPD, closed)
B
12/17/2021
Violation issued (HPD, closed)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN06/24/2024
DOB NOWPlumbingSigned-offSERVICE TECH MECH&PLBG IN06/24/2024
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN06/24/2024
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN05/28/2022
DOB NOWPlumbingSigned-offSERVICE TECH MECH&PLBG IN05/20/2022
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN05/20/2022
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN06/04/2021
BISPLISSUEDMETROPOLITAN HEAT & POWER CO09/16/1993
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/18/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/13/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
04/12/2022Heating SystemsLOUIS ARENAspecial
04/12/2022HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
04/12/2022HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
04/12/2022Maintenance informationLOUIS ARENAenergy_progress
04/12/2022HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00513160-I1Request digital key ↗
08/29/2026B00717618-I1Request digital key ↗
08/29/2026B00717514-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00513160-I1Open ↗
08/29/2026B00717618-I1Open ↗
08/29/2026B00730516-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/23/2026B00717514-I1Open ↗
08/25/2026B00717618-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B00717514-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00513160-I1Open ↗
08/29/2026B00717618-I1Open ↗
08/13/2026B00717514-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00717514-I1Open ↗
08/13/2026B00730516-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026B00730516-I1Open ↗
08/13/2026B00717514-I1Open ↗