General warehouse
789 EAST 91ST STREET
BROOKLYN · Canarsie · BIN 3228472
💬 Discuss this project
1965Year Built
1Stories
E1Building Class
M1-1Zoning
44,000 sfGross Floor Area
5Units
LL97 Covered2 Active Violations ▸FDNY Report ↗
General warehouse · Owner of record: Consolidated Edison Company of New York · 46,000 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofConsolidated Edison6p · 1 filing · 20 docs
Floor 1Consolidated Edison1p · 1 filing · 20 docs
MezzanineConsolidated Edison2p · 1 filing · 20 docs
Site & exteriorConsolidated Edison5p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolidated Edison Company of New York1307/08/2026
Dino & Sons Realty603/21/2026
GSPP203/21/2026
Troy Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Breeze National311/08/2024
FL&M Engineering Design & Inspection210/01/2024
Paul Perdek, Prof. Engineering104/12/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter303/21/2026
A1 Expediting Service203/21/2026
Geiger E A Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Breeze NationalScaffold307/08/2026
Joma Electrical Contracting CoElectrical103/21/2026
Breeze NationalGeneral Contractor107/08/2026
MC SuperstructureScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106311/08/2024
Building Lifecycle
All (28)Filed (6)Permit Issued (5)Signed Off (3)Violation (8)Objection (2)Special Inspection (4)
05/19/2025
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01020963-I1
02/19/2025
Signed off — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-I1
12/31/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01099927-I1
11/08/2024
Filed — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-P2
11/06/2024
Special inspection requirement — Demolition
GEORGE GHEBRYAL
11/06/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE GHEBRYAL
10/04/2024
Objection resolved — Addressed
10/02/2024
Objection raised — Admin
10/01/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01099927-P1
09/18/2024
Filed — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-P1
09/06/2024
Special inspection requirement — Demolition
GEORGE GHEBRYAL
09/06/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
GEORGE GHEBRYAL
08/22/2024
Permit issued — Sidewalk Shed
B01099927-I1-SH
08/21/2024
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01099927-I1
08/02/2024
Permit issued — Construction Fence
B01020963-I1-FN
07/31/2024
Permit issued — Full Demolition
B00994544-I1-FD
06/03/2024
Permit issued — Construction Fence
B01020963-I1-FN
04/12/2024
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING BLDG DEMOLITION, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01020963-I1
04/12/2024
Permit issued — Construction Fence
B01020963-I1-FN
03/26/2024
Filed — Full Demolition
Full demolition of 1-story steel framed gateway substation/warehouse building
B00994544-I1
02/22/2022
Violation issued (FDNY_NOV, closed)
08/25/2021
Violation issued (FDNY_NOV, closed)
08/25/2021
Violation issued (FDNY_NOV, closed)
02/23/2021
Violation issued (FDNY_NOV, closed)
11/22/2019
Violation issued (FDNY_NOV, closed)
08/21/2000
Violation issued (FDNY_NOV, closed)
01/27/1994
Violation issued (FDNY_NOV, closed)
11/17/1988
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offMC Superstructure08/22/2024
DOB NOWConstruction FenceSigned-offBreeze National08/02/2024
DOB NOWFull DemolitionSigned-offBreeze National07/31/2024
DOB NOWConstruction FenceSigned-offBreeze National06/03/2024
DOB NOWConstruction FenceSigned-offBreeze National04/12/2024
BISOTISSUEDSolar Energy Systems11/27/2020
BISSPISSUEDAllstate Sprinkler02/07/2006
BISSPISSUEDAllstate Sprinkler02/22/2001
2 projects · most recent 08/28/2024
FiledStatusContractorScope
08/28/2024CompleteNash Electric Services—
12/03/2020CompleteAntonio Ceriello Electric4 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
11/06/2024DemolitionGEORGE GHEBRYALspecial
11/06/2024Structural Stability – Alterations of existing BuildingsGEORGE GHEBRYALspecial
09/06/2024DemolitionGEORGE GHEBRYALspecial
09/06/2024Structural Stability – Alterations of existing BuildingsGEORGE GHEBRYALspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonIndustrial / WarehouseFloor 1
Project B01020963 Alteration · LOC Issued · 04/12/2024
Project B00994544 Full Demolition · LOC Issued · 03/26/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026B00994544-I1Request digital key ↗
08/25/2026B00994544-P2Request digital key ↗
08/25/2026B01020963-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/22/2020340766763Open ↗
▸BISWORK PERMIT APPLICATION1
11/27/2020340766763Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026B00994544-I1Open ↗
08/25/2026B00994544-P1Open ↗
08/24/2026B01099927-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026B00994544-P1Open ↗
09/27/2026B00994544-P1Open ↗
08/28/2026B00994544-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/22/2020340766763Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/13/2026B00994544-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B00994544-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00994544-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00994544-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
09/22/2020340766763Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/22/2020340766763Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00994544-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00994544-I1Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/21/2021340766763Open ↗
11/23/2020340766763Open ↗
11/23/2020340766763Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/21/2021340766763Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
09/22/2020340766763Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/21/2021340766763Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/21/2021340766763Open ↗
09/24/2020340766763Open ↗
09/24/2020340766763Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs3
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/21/2021340766763Open ↗
11/23/2020340766763Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/21/2021340766763Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/22/2020340766763Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/21/2021340766763Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
09/22/2020340766763Open ↗
▸BISADDITIONAL INFORMATION1
11/23/2020340766763Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/25/2026B00994544-I1Open ↗
08/15/2026B00994544-P1Open ↗
08/13/2026B00994544-P2Open ↗
▸DOB NOWStructure Photographs3
08/25/2026B00994544-I1Open ↗
08/15/2026B00994544-P1Open ↗
08/13/2026B00994544-P2Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00994544-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00994544-I1Open ↗