DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
ECB10/10/2024PARTIAL STOP WORK ORDER FOR CELLAR LEVEL THEY ARE CREATING A RELIGIOUS BATH (IE SMALL POOLS ) FOR PRAYING., OBTAIN PERMIT$2K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB06/26/20172 STORY BLDG W/BOWSTRING TRUSS ROOF.WITHIN 60DAYS OF THIS VIO DATE, OWNER TO ENAGAGE NYS LIC PE EXP.W/WOOD TRUSSES TO PROBE & EVALUATE THE STRUCTURAL SOUDNESS OF BOWSTRING USING FIELD VERIFICATION, CALC.PROBES STRUCTURAL DEFICIENCIES TOBE IMMEDIATELY SHORED REPAIR, DRAWINGS TO BE FILED WITH DOB WITHIN 45 DAYS AFTER INSPECTION/SUBMIT A REPORT TO DOB
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB10/01/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
DOB09/28/20151 STORY RETAIL BLDG W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60DAYS OF DATE OF VIO OWNER TO ENGAGE A NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATION CALCULATIONS PROBES ETC & SUBMIT A REPORT ACCEPTABLE TO THE DEPT. RPR DWGS T/BE FILED W/THE DOB W/IN 45 DAYS AFTER THE INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
DOB09/20/2014FAIURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED
DOB06/30/2014THIS BUILDING HAS A WOOD BOWSTRING TRUSS ROOF BY 60 DAYS FROM VIOLATION, HAVE NYS LICENSED PE EVAL. EACH BOWSTRING TRUSS AND BEARINGS VIA FIELD VERIFICATION, CALCULATIONS, PROBES, ETC ANY STRUCTURAL DEFICIENCIES TO BE IMMEDIATELY SHORED. REPAIR DRAWINGS TO BE FILED WITH THE DOB WITHIN 45 DAYS AFTER INSPECTION