← Back
Elevator apt, semi-fireproof without stores
Austin Condominium
78TH AVENUE · BIN 4624331
💬 Discuss this project
2023Year Built
7Stories
D1Building Class
—Zoning
149,635 sfGross Floor Area
98Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 78-29 AUSTIN STREET HOLDING LLC · 26,510 sf lot · 5.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivil
Roof22p · 1 filing · 20 docs
Floor 621p · 1 filing · 20 docs
Floor 513p · 1 filing · 20 docs
Floor 419p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 219p · 2 filings · 20 docs
Floor 122p · 2 filings · 20 docs
Cellar23p · 2 filings · 20 docs
Sub-Cellar22p · 1 filing · 20 docs
Basement22p · 2 filings · 20 docs
1 job · most recent 08/04/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2025Permit IssuedRYBAK DEVELOPMENT CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2 42,000 BTU · Condensing Unit ×82
PUHY-EP72TNU-A1 80,000 BTU · Vrf Outdoor ×34
MXZ-SM48NAM2 54,000 BTU · Condensing Unit ×20
MXZ-SM60NAM2 66,000 BTU · Condensing Unit ×18
PUHY-EP168TNU-A1 188,000 BTU · Vrf Outdoor ×10
Ventilation
Greenheck RVE-40-41D-10I-1-A1 4,100 CFM · Erv ×4
RVE-40-36D-5I-1-A1 2,850 CFM · Erv ×2
1 job · most recent 08/04/2025
Sprinkler System
FiledStatusContractorScope
08/04/2025Signed-offM&D FIRE SPRINKLER INCSprinkler System
1 job · most recent 08/04/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/04/2025Signed-offMMI PLUMBING & HEATING INStorm, Water/Sanitary
6 jobs · most recent 01/26/2026
General Wiring
FiledStatusContractorScope
01/26/2026CompletePOWER DIRECT ELECTRIC INC—
08/26/2025CompleteSHELBY ELECTRICAL CORPGeneral Wiring
06/12/2024CompleteSHELBY ELECTRICAL CORPGeneral Wiring
04/29/2024CompleteSHELBY ELECTRICAL CORP1 meters, 1 new_meters
10/05/2023CompleteA.L. ELECTRICAL CORP.General Wiring
11/01/2022CompleteSOLAS ELECTRICAL CORP—
1 job · most recent 08/04/2025
Concrete
FiledStatusContractorScope
08/04/2025Permit IssuedRYBAK DEVELOPMENT CORPConcrete
1 job · most recent 08/04/2025
Fence
FiledStatusContractorScope
08/04/2025Permit IssuedRYBAK DEVELOPMENT CORPFence
Building Lifecycle
All (194)Filed (36)Permit Issued (47)Signed Off (12)Violation (15)Inspection (18)Objection (36)Special Inspection (30)
04/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/05/2026
Signed off — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-S6
01/05/2026
Signed off — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-S7
12/08/2025
Signed off — Alteration
TENANT PROTECTION PLAN FILED IN CONJUNCTION WITH TEMPORARY USE PERMIT FOR MODEL APARTMENTS UNDER JOB #Q01140490-I1 DURING CONSTRUCTION OF NEW BUILDING #Q00775081-I1.
Q01140490-I1
11/25/2025
Permit issued — General Construction
Q00775081-I1-GC
11/03/2025
Signed off — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-S9
10/30/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/06/2025
Signed off — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-S4
10/06/2025
Signed off — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-S8
08/05/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — Shutoff dampers
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
08/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
SAMI HAJJAR P.E
08/04/2025
Filed — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-A5
07/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/11/2025
Permit issued — Mechanical Systems
Q00775081-S7-MS
07/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Protection of exposed foundation insulation
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Electrical motors and elevators
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Metering
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Air barrier continuity plan testing
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Maintenance information
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Masonry
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
07/03/2025
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
07/02/2025
Objection raised — Admin
07/02/2025
Objection resolved — Addressed
06/30/2025
Filed — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-A4
06/30/2025
Special inspection requirement — Exterior lighting power
SAMI HAJJAR P.E
06/24/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/16/2025
Objection resolved — Addressed
06/13/2025
Objection raised — Other
06/12/2025
Filed — New Building
Foundation in conjunction with NB #Q00775081-I1.
Q00775081-A3
06/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/15/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
05/08/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/08/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/08/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/06/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
05/06/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
Latest 60 of 194 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RYBAK DEVELOPMENT CONSTRUCTION8904/09/2026
OWNERS REP2204/09/2026
RYBAK DEVELOPMENT1604/09/2026
DEVELOPMENT CORP RYBAK403/22/2026
CORE SCAFFOLD SYSTEMS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2022$20.9M—THE KEW-FOREST SCHOOL, INC. → 78-29 AUSTIN STREET HOLDING LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&B WORLD CONSULTING208/04/2025
ZPROEKT ARCHITECTURE806/30/2025
ENGINEERING SOLUTIONS504/25/2025
WEXLER ASSOCIATES603/11/2025
PAUL PERDEK, PROF. ENG. PLLC1208/07/2024
MRCE312/19/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION2403/21/2026
RYBAK DEVELOPMENT4803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RYBAK DEVELOPMENT CORPGeneral Contractor2804/09/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor904/09/2026
M&D FIRE SPRINKLER INCFire Protection807/08/2026
SHELBY ELECTRICAL CORP 005280General Contractor503/22/2026
STANISLAV UMANSKIYElectrical503/21/2026
MMI PLUMBING & HEATING INC.Plumbing307/08/2026
STARLITE PLBG & HTG CORPPlumbing307/08/2026
FIREQUEST CORPFire Protection307/08/2026
RYBAK DEVELOPMENT AND CONSTRUCTGeneral Contractor104/09/2026
SHELBY ELECTRICAL CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS18031808/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRYBAK DEVELOPMENT CORP11/25/2025
DOB NOWMechanical SystemsSigned-offRYBAK DEVELOPMENT CORP07/11/2025
DOB NOWGeneral ConstructionPermit IssuedRYBAK DEVELOPMENT CORP04/23/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC04/07/2025
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC04/07/2025
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH04/03/2025
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH03/14/2025
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC03/14/2025
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC03/14/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC01/22/2025
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC01/22/2025
DOB NOWGeneral ConstructionSigned-offRYBAK DEVELOPMENT CORP12/17/2024
DOB NOWConstruction FenceSigned-offRYBAK DEVELOPMENT CORP11/18/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/21/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/18/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC10/18/2024
DOB NOWStandpipeSigned-offM&D FIRE SPRINKLER INC09/23/2024
DOB NOWSprinklersSigned-offM&D FIRE SPRINKLER INC09/23/2024
DOB NOWPlumbingSigned-offMICHAEL ITSKOVICH09/23/2024
DOB NOWPlumbingSigned-offSTARLITE PLBG & HTG CORP08/30/2024
DOB NOWSprinklersSigned-offFIREQUEST CORP08/26/2024
DOB NOWStructuralSigned-offRYBAK DEVELOPMENT CORP07/10/2024
DOB NOWGeneral ConstructionPermit IssuedRYBAK DEVELOPMENT CORP05/15/2024
DOB NOWFoundationSigned-offRYBAK DEVELOPMENT CORP02/28/2024
DOB NOWSupport of ExcavationSigned-offRYBAK DEVELOPMENT CORP02/28/2024
DOB NOWConstruction FenceSigned-offRYBAK DEVELOPMENT CORP11/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC10/30/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC10/30/2023
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC10/23/2023
DOB NOWStandpipeSigned-offFIREQUEST CORP08/21/2023
DOB NOWStructuralSigned-offRYBAK DEVELOPMENT CORP08/09/2023
DOB NOWSprinklersSigned-offSTARLITE PLBG & HTG CORP07/28/2023
DOB NOWStandpipeSigned-offFIREQUEST CORP07/28/2023
DOB NOWPlumbingSigned-offSTARLITE PLBG & HTG CORP07/26/2023
DOB NOWCurb CutSigned-offRYBAK DEVELOPMENT CORP07/05/2023
DOB NOWGeneral ConstructionPermit IssuedRYBAK DEVELOPMENT CORP05/12/2023
DOB NOWFoundationSigned-offRYBAK DEVELOPMENT CORP03/29/2023
DOB NOWSupport of ExcavationSigned-offRYBAK DEVELOPMENT CORP03/29/2023
DOB NOWSupport of ExcavationSigned-offRYBAK DEVELOPMENT CORP12/28/2022
DOB NOWFoundationSigned-offRYBAK DEVELOPMENT CORP12/28/2022
+ 7 more permits on file
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
04/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
07/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/24/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
06/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/15/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
05/08/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/08/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/06/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/06/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/29/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 119
DateRequirementInspectorRole
08/05/2025Duct leakage testing, insulation and designSAMI HAJJAR P.Eenergy_progress
08/05/2025Shutoff dampersSAMI HAJJAR P.Eenergy_progress
08/05/2025Mechanical SystemsSAMI HAJJAR P.Especial
08/05/2025FinalSAMI HAJJAR P.Eprogress
08/05/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/05/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
08/05/2025HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
08/05/2025Maintenance informationSAMI HAJJAR P.Eenergy_progress
08/05/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
07/03/2025Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
07/03/2025Electrical motors and elevatorsSAMI HAJJAR P.Eenergy_progress
07/03/2025Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
07/03/2025Fenestration areasSAMI HAJJAR P.Eenergy_progress
07/03/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
07/03/2025VestibulesSAMI HAJJAR P.Eenergy_progress
07/03/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
07/03/2025Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
07/03/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
07/03/2025Wall Panels, Curtain Walls, and VeneersSAMI HAJJAR P.Especial
07/03/2025Interior lighting powerSAMI HAJJAR P.Eenergy_progress
07/03/2025MasonrySAMI HAJJAR P.Especial
07/03/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
07/03/2025Protection of exposed foundation insulationSAMI HAJJAR P.Eenergy_progress
07/03/2025Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
07/03/2025Exterior lighting powerSAMI HAJJAR P.Eenergy_progress
Latest 25 of 119.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
08/25/2026Q08033700-I1Request digital key ↗
08/24/2026Q00775081-A1Request digital key ↗
08/24/2026Q00775081-A3Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
05/20/2025421841163Open ↗
07/13/2023440747514Open ↗
10/07/2022440747514Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation3
05/13/2025440747514Open ↗
04/18/2024440747514Open ↗
10/07/2022440747514Open ↗
▸Zoning, Tax Lot & Property Records78
▸DOB NOWRestrictive Declaration/Easement 321
08/13/2026Q00775081-P2Open ↗
08/13/2026Q00775081-P1Open ↗
08/13/2026Q00775081-S8Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWRestrictive Declaration/Easement 121
08/13/2026Q00775081-P2Open ↗
08/13/2026Q00775081-S9Open ↗
08/13/2026Q00775081-S8Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWRestrictive Declaration/Easement 221
08/13/2026Q00775081-P4Open ↗
08/13/2026Q00775081-S9Open ↗
08/13/2026Q00775081-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00775081-A4Open ↗
08/13/2026Q00775081-A3Open ↗
08/13/2026Q00775081-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q00775081-P8Open ↗
08/13/2026Q00775081-A3Open ↗
08/13/2026Q00775081-A4Open ↗
Showing 3 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/30/2024421841163Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
08/30/2024421841163Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/30/2024421841163Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
08/26/2024421841163Open ↗
▸BISZONING EXHIBIT IV: CERTIFICATION1
08/30/2024421841163Open ↗
▸BISZONING EXHIBIT II: CERTIFICATION1
08/30/2024421841163Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00775081-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWDPL-1: Design Professional Seal & Signature35
08/24/2026Q00775081-A2Open ↗
08/24/2026Q00775081-P6Open ↗
08/24/2026Q00775081-S8Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026Q00775081-P8Open ↗
09/02/2026Q00775081-P8Open ↗
09/02/2026Q00775081-P8Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/28/2026Q00775081-S2Open ↗
09/23/2026Q00775081-S8Open ↗
09/23/2026Q00775081-S8Open ↗
Showing 3 of 17 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/07/2022440747514Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2022440747514Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00775081-A3Open ↗
Showing 1 of 4 on file for this type
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00775081-A4Open ↗
08/13/2026Q00775081-I1Open ↗
08/13/2026Q00775081-P8Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES SITE PLAN1
07/21/2023440747514Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/07/2022440747514Open ↗
▸BISSTREET TREE CHECKLIST1
10/07/2022440747514Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00775081-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/24/2026Q00775081-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00775081-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT4
08/13/2026Q00775081-P2Open ↗
08/13/2026Q00775081-S1Open ↗
08/13/2026Q00775081-P6Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00775081-S1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISDOT APPROVAL FOR APEX CORNER PEDRAMPS1
05/13/2025440747514Open ↗
▸BISDOB APPROVAL FOR NEW CC1
05/13/2025440747514Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
08/30/2024421841163Open ↗
04/18/2024440747514Open ↗
▸BISEFILING COVER SHEET1
05/20/2025421841163Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2022440747514Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/13/2026Q00775081-I1Open ↗
08/13/2026Q00775081-A3Open ↗
08/13/2026Q00775081-A4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026Q00775081-A3Open ↗
08/24/2026Q00775081-P8Open ↗
08/24/2026Q00775081-A4Open ↗
Showing 3 of 4 on file for this type
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/30/2024421841163Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00775081-S2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00775081-I1Open ↗