← Back
Condo, residential unit in 2-10 unit building
79 1 PLACE
💬 Discuss this project
1900Year Built
4Stories
R1Building Class
R6AZoning
6,260 sfGross Floor Area
5Units
Rent Stabilized4 Open Violations ▸
Condo, residential unit in 2-10 unit building · 2,500 sf lot · 2.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Floor 11p · 1 filing · 5 docs
Cellar3p · 2 filings · 17 docs
Basement2p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
79 1ST PLACE CONDOMINIUM403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ME ENGINEERS203/16/2023
JON POWELL ARCHITECTURE PLLC602/13/2023
SILMAN207/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GAUDIOSO CONTRACTING INCGeneral Contractor1107/08/2026
PLUMB-IT MECHANICAL INCPlumbing407/08/2026
GMN CONSTRUCTION & CONTRAGeneral Contractor303/21/2026
DEMETRIOS ILIOPOULOSElectrical203/21/2026
SUNBIRD ELECTRICAL CONTRElectrical203/22/2026
JVR PLBG HEATINGGeneral Contractor103/22/2026
HIGHLAND PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HANSEN ENGINEERING PC8174403/16/2023
JON POWELL ARCHITECTURE P7806202/13/2023
LEO Y LEE ASSOCIATES2481208/07/2020
Building Lifecycle
All (88)Filed (10)Permit Issued (8)Signed Off (6)Violation (18)Inspection (5)Objection (12)Special Inspection (29)
04/30/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
05/05/2023
Signed off — Alteration
INSTALLATION OF VRF HEAT PUMP SYSTEM AND ASSOCIATED DUCTWORK AND PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00578564-I1
05/03/2023
Signed off — Alteration
B00549290-I1
04/18/2023
Signed off — Alteration
INSTALLING AND RELOCATING NEW PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH MAIN GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00578574-I1
04/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2023
Signed off — Alteration
B00800476-I1
03/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
03/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
03/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
03/24/2023
Special inspection requirement — Mechanical Systems
Ryan Hansen
03/24/2023
Special inspection requirement — Final
Ryan Hansen
03/22/2023
Objection resolved — Addressed
03/20/2023
Objection raised — Scope
03/17/2023
Violation issued (HPD, closed)
A
03/16/2023
Filed — Alteration
INSTALLATION OF VRF HEAT PUMP SYSTEM AND ASSOCIATED DUCTWORK AND PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00578564-P1
03/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
03/09/2023
Special inspection requirement — Final
Ryan Hansen
03/09/2023
Special inspection requirement — Mechanical Systems
Ryan Hansen
03/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
03/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
03/08/2023
Signed off — Alteration
STRUCTURAL WORK FOR STAIR RELOCATION AND ASSOCIATED FRAMING AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH ASSOCIATED APPROVED GENERAL CONSTRUCTION APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00578543-I1
02/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Powell
02/13/2023
Filed — Alteration
INSTALLING AND RELOCATING NEW PLUMBING FIXTURES AND ASSOCIATED PIPING AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH MAIN GC APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00578574-P1
01/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonathan Powell
01/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2022
Filed — Alteration
B00800476-I1
12/16/2022
Special inspection requirement — Lighting in dwelling units
Jonathan Powell
12/16/2022
Special inspection requirement — Final
Jonathan Powell
12/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Jonathan Powell
12/16/2022
Special inspection requirement — Lighting controls
Jonathan Powell
11/14/2022
Violation issued (HPD, closed)
I
07/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/05/2022
Filed — Alteration
STRUCTURAL WORK FOR STAIR RELOCATION AND ASSOCIATED FRAMING AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH ASSOCIATED APPROVED GENERAL CONSTRUCTION APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00578543-P1
07/05/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ryan Hansen
07/05/2022
Special inspection requirement — Structural Steel - Welding
Ryan Hansen
07/05/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Ryan Hansen
07/05/2022
Special inspection requirement — Post-installed Anchors
Ryan Hansen
07/05/2022
Special inspection requirement — Structural Steel - Details
Ryan Hansen
07/05/2022
Special inspection requirement — Final
Ryan Hansen
07/01/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/01/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/01/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Ryan Hansen
07/01/2022
Special inspection requirement — Final
Ryan Hansen
07/01/2022
Special inspection requirement — Structural Steel - Welding
Ryan Hansen
07/01/2022
Special inspection requirement — Post-installed Anchors
Ryan Hansen
07/01/2022
Special inspection requirement — Structural Steel - Details
Ryan Hansen
07/01/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ryan Hansen
05/18/2022
Permit issued — Mechanical Systems
B00578564-I1-MS
05/17/2022
Permit issued — Structural
B00578543-I1-ST
05/17/2022
Permit issued — General Construction
B00549290-I1-GC
03/28/2022
Permit issued — Mechanical Systems
B00578564-I1-MS
03/28/2022
Permit issued — Structural
B00578543-I1-ST
03/17/2022
Permit issued — Plumbing
B00578574-I1-PL
03/07/2022
Permit issued — General Construction
B00549290-I1-GC
02/18/2022
Violation issued (HPD, closed)
A
11/26/2021
Filed — Alteration
INSTALLATION OF VRF HEAT PUMP SYSTEM AND ASSOCIATED DUCTWORK AND PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00578564-I1
09/30/2021
Filed — Alteration
STRUCTURAL WORK FOR STAIR RELOCATION AND ASSOCIATED FRAMING AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH ASSOCIATED APPROVED GENERAL CONSTRUCTION APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00578543-I1
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offGAUDIOSO CONTRACTING05/18/2022
DOB NOWStructuralSigned-offGAUDIOSO CONTRACTING05/17/2022
DOB NOWGeneral ConstructionSigned-offGAUDIOSO CONTRACTING05/17/2022
DOB NOWMechanical SystemsSigned-offGAUDIOSO CONTRACTING03/28/2022
DOB NOWStructuralSigned-offGAUDIOSO CONTRACTING03/28/2022
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC03/17/2022
DOB NOWGeneral ConstructionSigned-offGAUDIOSO CONTRACTING03/07/2022
DOB NOWPlumbingSigned-offHIGHLAND PLUMBING LLC07/23/2020
BISOTISSUEDABCAT ASSOCIATES INC10/08/2020
BISOTISSUEDRAUL CONSTRUCTION LLC08/11/2020
BISOTISSUEDRAUL CONSTRUCTION LLC06/10/2020
BISPLISSUEDARCO PLBG AND HTG INC10/14/2015
BISOTISSUEDMAGNIFICENT URBAN RESTORA05/27/2015
2 projects · most recent 02/17/2023
General Wiring HVAC Wiring
FiledStatusContractorScope
02/17/2023CompleteSUNBIRD ELECTRICAL CONTRGeneral Wiring, HVAC Wiring
06/27/2022CompleteTJN ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
03/24/2023HVAC-R and service water heating equipmentRyan Hansenenergy_progress
03/24/2023HVAC-R and service water heating system controlsRyan Hansenenergy_progress
03/24/2023HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
03/24/2023Mechanical SystemsRyan Hansenspecial
03/24/2023FinalRyan Hansenprogress
03/09/2023HVAC-R and service water heating system controlsRyan Hansenenergy_progress
03/09/2023FinalRyan Hansenprogress
03/09/2023Mechanical SystemsRyan Hansenspecial
03/09/2023HVAC-R and service water heating equipmentRyan Hansenenergy_progress
03/09/2023HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
02/14/2023Fire-Resistant Penetrations and JointsJonathan Powellspecial
01/30/2023Fire-Resistant Penetrations and JointsJonathan Powellspecial
12/16/2022Lighting in dwelling unitsJonathan Powellenergy_progress
12/16/2022FinalJonathan Powellprogress
12/16/2022Energy Code Compliance InspectionsJonathan Powellprogress
12/16/2022Lighting controlsJonathan Powellenergy_progress
07/05/2022Structural Stability – Alterations of existing buildingsRyan Hansenspecial
07/05/2022Structural Steel - WeldingRyan Hansenspecial
07/05/2022Structural Steel - High Strength BoltingRyan Hansenspecial
07/05/2022Post-installed AnchorsRyan Hansenspecial
07/05/2022Structural Steel - DetailsRyan Hansenspecial
07/05/2022FinalRyan Hansenprogress
07/01/2022Structural Steel - High Strength BoltingRyan Hansenspecial
07/01/2022FinalRyan Hansenprogress
07/01/2022Structural Steel - WeldingRyan Hansenspecial
Latest 25 of 29.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch8
09/01/2026B00549290-I1Request digital key ↗
09/01/2026B00578574-P1Request digital key ↗
09/01/2026B00578543-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00327093-I1Request digital key ↗
08/15/2026B00327093-P1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION6
09/22/2020340758790Open ↗
04/22/2020322044444Open ↗
08/17/2015340215467Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
10/08/2020340758790Open ↗
06/10/2020322044444Open ↗
10/15/2015340215467Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026B00549290-I1Open ↗
09/01/2026B00578574-P1Open ↗
09/01/2026B00578574-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00800476-I1Open ↗
09/01/2026B00800476-I1Open ↗
08/28/2026B00578564-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00578574-P1Open ↗
09/01/2026B00578574-I1Open ↗
08/31/2026B00327093-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
08/25/2020340758790Open ↗
03/27/2015340215467Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/13/2020322044444Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING4
10/07/2015340215467Open ↗
10/07/2015340215467Open ↗
08/17/2015340215467Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
04/16/2020322044444Open ↗
12/04/2020340758790Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00327093-P1Open ↗
08/13/2026B00327093-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
05/21/2015340215467Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00549290-I1Open ↗
09/01/2026B00578574-P1Open ↗
09/01/2026B00578543-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/25/2020340758790Open ↗
04/16/2020322044444Open ↗
04/20/2015340215467Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/04/2020340758790Open ↗
11/19/2020322044444Open ↗
10/08/2020340758790Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
12/04/2020340758790Open ↗
11/19/2020322044444Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00578564-I1Open ↗
08/13/2026B00549290-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/13/2020322044444Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/04/2020340758790Open ↗
12/04/2020340758790Open ↗
12/04/2020322044444Open ↗
Showing 3 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/10/2020322044444Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION6
04/17/2020322044444Open ↗
04/17/2020322044444Open ↗
04/17/2020322044444Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/04/2020340758790Open ↗
12/04/2020322044444Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
12/04/2020340758790Open ↗
11/19/2020322044444Open ↗
09/09/2020340758790Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE1
05/21/2015340215467Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
10/22/2014320984716Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION7
09/09/2020340758790Open ↗
04/21/2020322044444Open ↗
04/17/2020322044444Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
08/25/2020340758790Open ↗
03/27/2015340215467Open ↗
▸BISBOROUGH INTAKE FORM1
04/22/2020322044444Open ↗
▸BISEFILING COVER SHEET1
10/03/2014320984716Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/21/2015340215467Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/21/2015340215467Open ↗