← Back
Two family brick
79-10 ANKENER AVENUE
QUEENS · Elmhurst · BIN 4058334
💬 Discuss this project
1945Year Built
2Stories
B1Building Class
R4Zoning
2,055 sfGross Floor Area
2Units
Two family brick · 1,512 sf lot · 1.36 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 24p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/05/2024$1.0M—— → —$510/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI606/30/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
S & L PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394306/30/2025
Building Lifecycle
All (23)Filed (6)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (9)
05/26/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER,BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123902-I1
07/11/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123903-I1
07/07/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/30/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123903-P2
06/30/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER,BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123902-P2
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
03/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER,BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123902-P1
03/04/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123903-P1
03/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
03/04/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
03/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
01/03/2025
Permit issued — Plumbing
Q01123902-I1-PL
12/10/2024
Permit issued — General Construction
Q01123903-I1-GC
12/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM, WASHER, DRYER,BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123902-I1
12/03/2024
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT FRONT YARD. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01123903-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offS & L PLUMBING INC01/03/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC12/10/2024
BIS—ISSUEDNA04/17/2001
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/07/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/30/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/30/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/30/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/30/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/30/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/30/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
03/04/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
03/04/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
03/04/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01123902-P1Request digital key ↗
08/21/2026Q01123902-P2Request digital key ↗
08/21/2026Q01123902-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 14
08/20/2026Q01123903-I1Open ↗
08/13/2026Q01123902-P2Open ↗
08/13/2026Q01123903-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026Q01123903-P1Open ↗
08/20/2026Q01123903-I1Open ↗
08/13/2026Q01123902-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/20/2026Q01123903-P2Open ↗
08/27/2026Q01123903-P1Open ↗
08/23/2026Q01123903-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/20/2026Q01123903-P2Open ↗
08/27/2026Q01123903-P1Open ↗
08/23/2026Q01123903-I1Open ↗