79-11 262 STREET
QUEENS · BIN 4177652
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 0.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR104/17/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281104/17/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
11/12/2025
Signed off — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 30 modules, 12.9 KW
Q01211980-I1
04/18/2025
Permit issued — Solar
Q01211980-I1-SL
04/17/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 30 modules, 12.9 KW
Q01211980-I1
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
04/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
04/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
04/17/2025
Special inspection requirement — Final
Mina Makar
04/17/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
10/29/2006
Violation issued (ECB, closed)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR04/18/2025
BISPLRE-ISSUEDDC BUILDING SERVICES INC02/12/2007
BISEQISSUEDGST CONTRACTING INC09/20/2006
BIS—ISSUEDGST CONTRACTING INC09/20/2006
BISEQISSUEDGST CONTRACTING INC06/14/2006
1 project · most recent 04/17/2025
FiledStatusContractorScope
04/17/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/17/2025Fire-Resistant Penetrations and JointsMina Makarspecial
04/17/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
04/17/2025Energy Code Compliance InspectionsMina Makarprogress
04/17/2025FinalMina Makarprogress
04/17/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01211980-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q01211980-I1Open ↗
08/28/2026Q01211980-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01211980-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q01211980-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01211980-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01211980-I1Open ↗