← Back
Two family converted from one family
79-12 152 STREET
QUEENS · BIN 4145201
💬 Discuss this project
1925Year Built
2.5Stories
B3Building Class
R4Zoning
1,516 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · 2,175 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS ENGINEERING, PLLC501/27/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&E SMOOTH TRANSFORMATIONGeneral Contractor107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS ENGINEERING PLLC6232501/27/2022
Building Lifecycle
All (20)Filed (5)Permit Issued (2)Signed Off (2)Violation (3)Inspection (4)Special Inspection (4)
02/22/2022
Signed off — Alteration
Refiling plumbing work associated with job application #402413410; At cellar floor: installation of a laundry area and legalization of a two-piece bathroom
Q00495665-I1
02/18/2022
Signed off — Alteration
Q00495660-I1
01/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
01/27/2022
Filed — Alteration
Refiling plumbing work associated with job application #402413410; At cellar floor: installation of a laundry area and legalization of a two-piece bathroom
Q00495665-P3
01/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
11/04/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/01/2021
Filed — Alteration
Refiling plumbing work associated with job application #402413410; At cellar floor: installation of a laundry area and legalization of a two-piece bathroom
Q00495665-P2
09/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
08/05/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/30/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/17/2021
Filed — Alteration
Refiling plumbing work associated with job application #402413410; At cellar floor: installation of a laundry area and legalization of a two-piece bathroom
Q00495665-P1
06/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Darlyn Alvarez
05/21/2021
Permit issued — Plumbing
Q00495665-I1-PL
05/05/2021
Permit issued — General Construction
Q00495660-I1-GC
04/23/2021
Filed — Alteration
Refiling plumbing work associated with job application #402413410; At cellar floor: installation of a laundry area and legalization of a two-piece bathroom
Q00495665-I1
04/07/2021
Filed — Alteration
Q00495660-I1
02/18/2009
Violation issued (HPD, open)
B
02/18/2009
Violation issued (HPD, open)
B
07/15/2008
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/21/2021
DOB NOWGeneral ConstructionSigned-offJ&E SMOOTH TRANSFORMATION05/05/2021
BISPLISSUEDTHE PLG COMP INC07/05/2006
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/04/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/05/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/30/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/28/2022Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
01/27/2022Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
09/08/2021Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
06/17/2021Fire-Resistant Penetrations and JointsDarlyn Alvarezspecial
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00495660-I1Request digital key ↗
08/27/2026Q00495665-P1Request digital key ↗
08/27/2026Q00495665-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
05/05/2022402413410Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00495660-I1Open ↗
08/27/2026Q00495665-I1Open ↗
08/27/2026Q00495665-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00495665-P1Open ↗
09/01/2026Q00495665-I1Open ↗
08/27/2026Q00495665-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00495660-I1Open ↗
08/27/2026Q00495665-P1Open ↗
08/27/2026Q00495665-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00495660-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLetter from Homeowner for Withdrawal1
03/30/2022402413410Open ↗