← Back
Two family frame
79-14 SUTTER AVENUE
QUEENS · BIN 4244845
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R4AZoning
2,360 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,400 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR205/12/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281205/12/2025
Building Lifecycle
All (10)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
10/24/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 39 Panels, 15.99 kW
Q01149126-I1
05/12/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 39 Panels, 15.99 kW
Q01149126-P1
05/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/12/2025
Special inspection requirement — Final
Mina Makar
05/12/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
12/09/2024
Permit issued — Solar
Q01149126-I1-SL
11/29/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 39 Panels, 15.99 kW
Q01149126-I1
07/24/2009
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR12/09/2024
2 projects · most recent 12/12/2024
FiledStatusContractorScope
12/12/2024CompleteISLAND ELECTRIC CORP—
09/21/2021Permit IssuedL&B ELEC'L INTERNATIONAL2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/12/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/12/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/12/2025Energy Code Compliance InspectionsMina Makarprogress
05/12/2025FinalMina Makarprogress
05/12/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01149126-P1Request digital key ↗
08/21/2026Q01149126-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01149126-I1Open ↗
08/21/2026Q01149126-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01149126-P1Open ↗
08/23/2026Q01149126-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01149126-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01149126-I1Open ↗
08/21/2026Q01149126-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01149126-I1Open ↗