← Back
BuildNYC
Church, synagogue, chapel
79-27 78TH AVENUE
QUEENS · Glendale · BIN 4092930
💬 Discuss this project
1931Year Built
2Stories
M1Building Class
R4-1Zoning
6,048 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · Owner of record: Myanmar Baptist Church · 4,000 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMyanmar Baptist Church1p · 1 filing · 4 docs
Floor 2Myanmar Baptist Church3p · 1 filing · 15 docs
Floor 1
CellarMyanmar Baptist Church2p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Myanmar Baptist Church New York1007/08/2026
Glendale Baptist Church203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC Engineering510/06/2023
Lysaght & Associates, P.A103/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Times Buildings Engineering Service503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QMB Plumbing & HeatingPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABC Engineering1515510/06/2023
Lysaght and Associates8380103/08/2022
Building Lifecycle
All (45)Filed (6)Permit Issued (3)Signed Off (3)Violation (14)Inspection (6)Objection (2)Special Inspection (11)
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2023
Signed off — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-S1
10/13/2023
Signed off — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-I1
10/06/2023
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-P3
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
10/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
10/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
10/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Scope
08/30/2023
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-P2
08/30/2023
Special inspection requirement — Heating Systems
HUI ZENG
08/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
08/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2023
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-P1
08/14/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
08/14/2023
Special inspection requirement — Heating Systems
HUI ZENG
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/03/2023
Permit issued — Boiler Equipment
Q08045865-S1-BE
03/03/2023
Permit issued — Plumbing
Q08045865-I1-PL
12/12/2022
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-S1
12/06/2022
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-I1
10/11/2022
Signed off — Alteration
Q00679135-I1
09/08/2022
Permit issued — Structural
Q00679135-I1-ST
03/08/2022
Filed — Alteration
Q00679135-I1
02/21/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHARLES LYSAGHT
02/11/2022
Special inspection requirement — Final
CHARLES LYSAGHT
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offQMB Plumbing & Heating03/03/2023
DOB NOWPlumbingSigned-offQMB Plumbing & Heating03/03/2023
DOB NOWStructuralSigned-offLysaght & Associates, P.A09/08/2022
BISFBISSUEDAllison A. Heaney04/07/2006
1 project · most recent 12/09/2024
General Wiring
FiledStatusContractorScope
12/09/2024Permit IssuedElectric A/CGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/05/2023Energy Code Compliance InspectionsHUI ZENGprogress
10/05/2023Fire-Resistant Penetrations and JointsHUI ZENGspecial
10/05/2023HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
10/05/2023HVAC-R and service water heating equipmentHUI ZENGenergy_progress
10/05/2023HVAC-R and service water heating system controlsHUI ZENGenergy_progress
08/30/2023Heating SystemsHUI ZENGspecial
08/30/2023HVAC-R and service water heating equipmentHUI ZENGenergy_progress
08/14/2023HVAC-R and service water heating equipmentHUI ZENGenergy_progress
08/14/2023Heating SystemsHUI ZENGspecial
02/21/2022Structural Stability – Alterations of existing buildingsCHARLES LYSAGHTspecial
02/11/2022FinalCHARLES LYSAGHTprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Myanmar Baptist ChurchReligiousCellar, Floor 2, Roof
Project Q08045865 Alteration · LOC Issued · 12/06/2022
Project Q00679135 Alteration · LOC Issued · 03/08/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00679135-I1Request digital key ↗
08/25/2026Q08045865-S1Request digital key ↗
08/25/2026Q08045865-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08045865-S1Open ↗
08/25/2026Q08045865-I1Open ↗
08/25/2026Q08045865-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q08045865-P3Open ↗
08/31/2026Q08045865-P3Open ↗
08/28/2026Q00679135-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q08045865-P3Open ↗
08/28/2026Q00679135-I1Open ↗
08/27/2026Q08045865-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q08045865-S1Open ↗
08/25/2026Q08045865-I1Open ↗
08/25/2026Q08045865-P3Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/25/2026Q08045865-I1Open ↗
08/25/2026Q08045865-P1Open ↗
08/25/2026Q08045865-S1Open ↗
Showing 3 of 6 on file for this type