← Back
Church, synagogue, chapel
79-27 79 PLACE
QUEENS · BIN 4092930
💬 Discuss this project
1931Year Built
2Stories
M1Building Class
R4-1Zoning
6,048 sfGross Floor Area
1Units
0 Open Violations
Church, synagogue, chapel · Owner of record: MYANMAR BAPTIST CHURCH · 4,000 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MYANMAR BAPTIST CHURCH NEW YORK1007/08/2026
GLENDALE BAPTIST CHURCH203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABC ENGINEERING PLLC510/06/2023
LYSAGHT & ASSOCIATES, P.A.103/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TIMES BUILDINGS ENGINEERING SERVICE503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QMB PLUMBING & HEATING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABC ENGINEERING PLLC1515510/06/2023
LYSAGHT AND ASSOCIATES8380103/08/2022
Building Lifecycle
All (45)Filed (6)Permit Issued (3)Signed Off (3)Violation (14)Inspection (6)Objection (2)Special Inspection (11)
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2023
Signed off — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-S1
10/13/2023
Signed off — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-I1
10/06/2023
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-P3
10/05/2023
Special inspection requirement — Energy Code Compliance Inspections
HUI ZENG
10/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUI ZENG
10/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
HUI ZENG
10/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
10/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
HUI ZENG
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/11/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Scope
08/30/2023
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-P2
08/30/2023
Special inspection requirement — Heating Systems
HUI ZENG
08/30/2023
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
08/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2023
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-P1
08/14/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
HUI ZENG
08/14/2023
Special inspection requirement — Heating Systems
HUI ZENG
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/03/2023
Permit issued — Boiler Equipment
Q08045865-S1-BE
03/03/2023
Permit issued — Plumbing
Q08045865-I1-PL
12/12/2022
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-S1
12/06/2022
Filed — Alteration
FILE PLUMBING WORK FOR BOILERS AT CELLAR AND LEGALIZE KITCHEN & BATHROOM FIXTURES AT 2ND FLOOR OF EXISTING CHURCH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q08045865-I1
10/11/2022
Signed off — Alteration
Q00679135-I1
09/08/2022
Permit issued — Structural
Q00679135-I1-ST
03/08/2022
Filed — Alteration
Q00679135-I1
02/21/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHARLES LYSAGHT
02/11/2022
Special inspection requirement — Final
CHARLES LYSAGHT
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/01/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/08/1988
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offQMB PLUMBING & HEATING INC03/03/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC03/03/2023
DOB NOWStructuralSigned-offLYSAGHT & ASSOCIATES, P.A.09/08/2022
BISFBISSUEDALLISON A. HEANEY04/07/2006
1 project · most recent 12/09/2024
General Wiring
FiledStatusContractorScope
12/09/2024Permit IssuedELECTRIC A/C INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/15/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/05/2023Energy Code Compliance InspectionsHUI ZENGprogress
10/05/2023Fire-Resistant Penetrations and JointsHUI ZENGspecial
10/05/2023HVAC-R and service water piping design and insulationHUI ZENGenergy_progress
10/05/2023HVAC-R and service water heating equipmentHUI ZENGenergy_progress
10/05/2023HVAC-R and service water heating system controlsHUI ZENGenergy_progress
08/30/2023Heating SystemsHUI ZENGspecial
08/30/2023HVAC-R and service water heating equipmentHUI ZENGenergy_progress
08/14/2023HVAC-R and service water heating equipmentHUI ZENGenergy_progress
08/14/2023Heating SystemsHUI ZENGspecial
02/21/2022Structural Stability – Alterations of existing buildingsCHARLES LYSAGHTspecial
02/11/2022FinalCHARLES LYSAGHTprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00679135-I1Request digital key ↗
08/25/2026Q08045865-S1Request digital key ↗
08/25/2026Q08045865-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q08045865-S1Open ↗
08/25/2026Q08045865-I1Open ↗
08/25/2026Q08045865-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q08045865-P3Open ↗
08/31/2026Q08045865-P3Open ↗
08/28/2026Q00679135-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026Q08045865-P3Open ↗
08/28/2026Q00679135-I1Open ↗
08/27/2026Q08045865-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q08045865-S1Open ↗
08/25/2026Q08045865-I1Open ↗
08/25/2026Q08045865-P3Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/25/2026Q08045865-I1Open ↗
08/25/2026Q08045865-P1Open ↗
08/25/2026Q08045865-S1Open ↗
Showing 3 of 6 on file for this type