Predominantly retail with other uses
79-28 METROPOLITAN AVENUE
QUEENS · Middle Village · BIN 4437889
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R5Zoning
6,380 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: 7928 METRO LLC · 7,300 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 1Under Construction17p · 2 filings · 20 docs
Mezzanine15p · 1 filing · 20 docs
Cellar17p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BREWER CAPITAL MGMT2507/08/2026
RECORD GROUP103/22/2026
TAVERNA VITO 1103/22/2026
MONDE KNITTING MILLS INC103/22/2026
NYRON HALL ENGINEERING SERVICES203/21/2026
RDMC ENTERPRISES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2025$2.2M—— → —$349/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EL CHOUM CONSULTING603/21/2026
GERALD J. CALIENDO R.A., P.C.503/21/2026
GERALD J CALIENDO R A P C503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IMPACT BUILDERS CORPGeneral Contractor804/09/2026
GK GROUP CONSTRUCTION CORGeneral Contractor303/21/2026
RECORD GROUP INCGeneral Contractor104/09/2026
TOPLINE NYC INCGeneral Contractor107/08/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
CN PLUMBING INCFire Protection107/08/2026
WATER WORKS PIPING INCPlumbing107/08/2026
JH CREW INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE93231401/16/2026
Building Lifecycle
All (171)Filed (19)Permit Issued (11)Signed Off (8)Violation (37)Inspection (18)Objection (48)Special Inspection (30)
07/31/2026
Signed off — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-S6
06/09/2026
Inspection — Pass-Final PL Permit Withdrawal
Pass
View inspection ↗
06/02/2026
Signed off — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-S7
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2026
Signed off — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-S5
03/02/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/23/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-A2
12/23/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-A1
12/12/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-P9
12/08/2025
Signed off — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-S1
12/03/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-P8
12/03/2025
Special inspection requirement — Maintenance information
William Alicea
12/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
12/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
12/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/01/2025
Special inspection requirement — Electrical motors and elevators
William Alicea
12/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
12/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
12/01/2025
Special inspection requirement — Final
RICHARD MUESCH JR.
12/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/01/2025
Special inspection requirement — Mechanical Systems
William Alicea
12/01/2025
Special inspection requirement — Shutoff dampers
William Alicea
12/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
12/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
12/01/2025
Special inspection requirement — Maintenance information
William Alicea
11/25/2025
Violation issued (HPD, closed)
I
11/16/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-P7
11/16/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-P5
11/16/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-P6
11/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
11/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
11/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
11/16/2025
Special inspection requirement — Maintenance information
William Alicea
11/16/2025
Special inspection requirement — Sprinkler Systems
William Alicea
11/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
11/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2025
Permit issued — Plumbing
Q91772919-S6-PL
10/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/09/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/02/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2025
Special inspection requirement — Maintenance information
JEFFREY BELL
10/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
JEFFREY BELL
10/01/2025
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
10/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
10/01/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
10/01/2025
Special inspection requirement — Duct leakage testing, insulation and design
JEFFREY BELL
10/01/2025
Special inspection requirement — Fenestration air leakage
JEFFREY BELL
09/22/2025
Filed — Alteration CO
HEREWITH FILE ALTERATION IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE.
Q01188882-P2
09/17/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/15/2025
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01233266-I1
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSUPERIOR PIPING&MECH CORP11/12/2025
DOB NOWSprinklersSigned-offCN PLUMBING INC08/13/2025
DOB NOWPlumbingSigned-offFOUR POINTS P & H CORP08/12/2025
DOB NOWMechanical SystemsSigned-offIMPACT BUILDERS CORP07/22/2025
DOB NOWStructuralSigned-offIMPACT BUILDERS CORP07/02/2025
DOB NOWFoundationSigned-offIMPACT BUILDERS CORP06/20/2025
DOB NOWSidewalk ShedSigned-offTOPLINE NYC INC05/30/2025
DOB NOWGeneral ConstructionPermit IssuedRECORD GROUP INC05/20/2025
DOB NOWConstruction FenceSigned-offIMPACT BUILDERS CORP05/20/2025
DOB NOWConstruction FenceSigned-offJH CREW INC04/11/2025
DOB NOWGeneral ConstructionSigned-offGK GROUP CONSTRUCTION COR05/30/2023
BISOTISSUEDSAL'S CONSTRUCTION08/28/2007
BISEQISSUEDSAL'S CONSTRUCTION08/28/2007
BISFPISSUEDNY BUSINESS FIRE SYSTEM04/11/2007
BISPLISSUEDPINNACLE PLBG & HTG CORP03/12/2007
BIS—ISSUEDSUNG CONSTRUCTION INC02/01/2007
BISPLISSUEDPINNACLE PLBG & HTG CORP11/14/2006
BISOTISSUEDBONDEE ENTERPRISES INC05/04/1998
BISPLISSUEDDBA RANSHAW PRISES INC.D/B/A RAN05/04/1998
1 project · most recent 01/16/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/16/2026Signed-offIMPACT BUILDERS CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Johnstone Supply ZJ120S24R2D6LAA2A3, ZJ120S24R2D6LAA2A3 10 tons · Rooftop Unit ×4
ZE048H12B2A1AAA1A3 4 tons · Rooftop Unit ×2
Fujitsu AOUH36KWAS4, AOUH36KWAS4 4 tons · Heat Pump Outdoor ×2
Ventilation
Airzone S50, S50, BPT12-13D, BPT13-13EN2 75 CFM ×4
1 project · most recent 01/16/2026
Sprinkler System
FiledStatusContractorScope
01/16/2026Signed-offCN PLUMBING INCSprinkler System
1 project · most recent 01/16/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/16/2026Signed-offFOUR POINTS P & H CORPGas, Storm, Water/Sanitary
1 project · most recent 04/01/2026
General Wiring
FiledStatusContractorScope
04/01/2026CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 01/16/2026
Steel Wood
FiledStatusContractorScope
01/16/2026Signed-offCN PLUMBING INCSteel, Wood
1 project · most recent 01/16/2026
Fence
FiledStatusContractorScope
01/16/2026Signed-offCN PLUMBING INCFence
1 project · most recent 01/16/2026
Earthwork
FiledStatusContractorScope
01/16/2026Signed-offCN PLUMBING INCEarthwork
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
06/09/2026Pass-Final PL Permit WithdrawalPassView ↗
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/01/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/02/2026Pass-Final PL - UndergroundPassView ↗
02/23/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/29/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/09/2025Pass-Final PL - UndergroundPassView ↗
10/02/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
12/03/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/03/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
12/03/2025Maintenance informationWilliam Aliceaenergy_progress
12/03/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
12/03/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
12/01/2025Maintenance informationWilliam Aliceaenergy_progress
12/01/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
12/01/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
12/01/2025Electrical motors and elevatorsWilliam Aliceaenergy_progress
12/01/2025Shutoff dampersWilliam Aliceaenergy_progress
12/01/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
12/01/2025Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
12/01/2025Mechanical SystemsWilliam Aliceaspecial
12/01/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/01/2025FinalRICHARD MUESCH JR.progress
11/16/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/16/2025Sprinkler SystemsWilliam Aliceaspecial
11/16/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
11/16/2025Maintenance informationWilliam Aliceaenergy_progress
11/16/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
11/16/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
11/16/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
10/01/2025Fenestration air leakageJEFFREY BELLenergy_progress
10/01/2025Air barrier — testing JEFFREY BELLenergy_progress
10/01/2025Exterior Insulation and Finish Systems (EIFS)William Aliceaspecial
Latest 25 of 68.
▾Documents — 106 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch18
08/25/2026Q08013876-I1Request digital key ↗
08/24/2026Q00856883-I1Request digital key ↗
08/20/2026Q01233266-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/25/2026Q00847508-I1Request digital key ↗
▸Applications & Permits4
▸BISPLACE OF ASSEMBLY2
09/13/2011420296646Open ↗
12/14/2010420296646Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/26/2008410130834Open ↗
▸BISWORK PERMIT APPLICATION1
06/27/2008410130834Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01188882-I1Open ↗
08/13/2026Q01188882-P2Open ↗
▸Seals & Professional Certifications45
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/25/2026Q08013876-I1Open ↗
08/25/2026Q00847508-I1Open ↗
08/20/2026Q01233266-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026Q01188882-P5Open ↗
08/27/2026Q01188882-I1Open ↗
08/27/2026Q01188882-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026Q01188882-P5Open ↗
08/27/2026Q01188882-I1Open ↗
08/27/2026Q01188882-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
09/13/2011420296646Open ↗
09/13/2011420296646Open ↗
12/14/2010420296646Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01188882-I1Open ↗
08/13/2026Q01188882-P2Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/18/2026Q01188882-S6Open ↗
08/18/2026Q01188882-S5Open ↗
08/18/2026Q01188882-S3Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/18/2026Q01188882-S6Open ↗
08/13/2026Q01188882-S5Open ↗
▸BISEMERGENCY LIGHTING (IF NOT IN COMPLIANCE WITH MEMEO 2-18-81)1
09/13/2011420296646Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/13/2026Q01188882-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01188882-S2Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/13/2011420296646Open ↗
09/13/2011420296646Open ↗
04/08/2009410130834Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
12/14/2010420296646Open ↗
06/26/2008410130834Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/08/2009410130834Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/08/2009410130834Open ↗
06/27/2008410130834Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/26/2008410130834Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/18/2026Q01188882-I1Open ↗
08/18/2026Q01188882-P2Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
04/08/2009410130834Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01188882-S2Open ↗
▸DOB NOWFinal Survey1
08/18/2026Q01188882-I1Open ↗