DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
DOB02/24/2017VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB03/15/2000WORK WITHOUT A PERMIT. WORK NOTED: RENOVATION AT 2ND STORY THROUGHOUT: OBSERVED NEW SHEETROCK WALLS AND CEILING. NEW 2X4 WOOD FRAMING WITH NEW ELECTRICAL CABLES IN BATHROOM. NEW METAL ENTRANCE DOOR AND BUICK STOP ALL WORK. REMEDY: OBTAIN A PERMIT IF FEASIBLE, CONTACT THIS DEPT AT 802-3685 PRIOR TO RETURN TO WORK
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/01/1994V-DOB VIOLATION - ACTIVE
DOB08/16/1993V-DOB VIOLATION - ACTIVE
DOB06/01/1993V-DOB VIOLATION - ACTIVE
DOB09/22/1988V-DOB VIOLATION - ACTIVE
ECB03/15/2000WORK WITHOUT A PERMIT.WORK NOTED:RENOVATION AT 2ND STORY THROUGHOUT:OBSERVED NEW SHEETROCK WALLS AND CEILING.(2)NEW 2X4 WOOD FRAMING WITH NEW ELECTRICAL CABLES IN BATHROOM.(3)NEW METAL ENTRANCE DOOR AND BUCK.STNothing owed — awaiting certificate of correction
Single or multiple dwelling with stores or offices · Owner of record: 79 CHURCH AVE HOLDING CORP · 1,830 sf lot · 2.35 FAR built · Flood zone X