← Back
BuildNYC
Elevator cooperative
79 EAST 79TH STREET
MANHATTAN · BIN 1046442
💬 Discuss this project
1928Year Built
14Stories
D4Building Class
R10Zoning
60,150 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 79 East 79th Street · 6,479 sf lot · 9.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSupported scaffold, roof protection10p · 3 filings · 20 docs
PenthouseUnit PH46p · 1 filing · 20 docs
Floor 13Material hoist installation1p · 2 filings · 4 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 513p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 212p · 1 filing · 20 docs
Floor 1
Site & exteriorD.H.E. Company, INC.29p · 6 filings · 20 docs
Filed — no permit issuedFacade inspection industrial2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
79 East 79th St5803/22/2026
Studio Brandon Sanchez2007/08/2026
79 E 79 St Corp C/O Brown Harr703/21/2026
D.H.E. Company303/22/2026
Brown, Harris, Stevens203/21/2026
D.P. Consulting203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&A Construction Services502/10/2026
Rigid Structural Design306/16/2025
Me Engineers201/30/2025
Aditya Karmarkar301/27/2025
James Scheld103/26/2024
Clouds AO401/16/2024
PS Engineers111/02/2023
AG Engineering110/21/2023
Seth P. Roye Architect210/12/2023
Raymond Nerenberg PE110/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design603/21/2026
William Vitacco Associates603/21/2026
Hierarch-E203/21/2026
Edi Consulting Group1003/21/2026
Arsenal Building Consultants203/21/2026
NY Expediters103/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mea ConstructionGeneral Contractor807/08/2026
Think ConstructionGeneral Contractor707/08/2026
Intersystems Installation S&SScaffold603/21/2026
C-Squared ContractingGeneral Contractor403/21/2026
Andamio ScaffoldingScaffold303/21/2026
Two-Tone ContractingGeneral Contractor203/21/2026
Iceberg Mechanicalspecialty_contractor107/08/2026
Kings Group NYScaffold107/08/2026
Two-Tone ContractingScaffold107/08/2026
Master 2 Plumbing & HeatingPlumbing107/08/2026
PP CousinPlumbing107/08/2026
TJ Doyle Electric EntpsElectrical103/21/2026
Zerega ContractingPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Inter Connection ElectricElectrical103/22/2026
K & G Electric CoElectrical103/21/2026
Deboccia Electric ConstructionElectrical103/21/2026
Graham Plumbing CoFire Protection103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURE+CONSTRUCTION1326502/10/2026
Tectonic Engineering Cons106501/30/2025
AR Consulting Engineer P4054111/02/2023
Seth P Roye Architect8554210/12/2023
Ark Engineering7261101/16/2023
Amhac4867110/25/2022
Building Lifecycle
All (190)Filed (26)Permit Issued (24)Signed Off (12)Facade (FISP) (12)Violation (35)Inspection (7)Objection (44)Special Inspection (30)
09/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/06/2026
Permit issued — Mechanical Systems
M01234677-S1-MS
03/06/2026
Permit issued — General Construction
M01234677-I1-GC
03/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2026
Permit issued — Plumbing
M01234677-S2-PL
02/10/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT #2 ON THE 2ND FLOOR. INSTALL THROUGH-WALL AIR CONDITIONERS AND BATHROOM EXHAUST AS PER PLANS ASSOCIATED CONSTRUCTION FILING M10234677-I1 AND ASSOCIATED PLUMBING FILING M10234677-S2
M01234677-P2
02/10/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT #2 ON THE 2ND FLOOR. INSTALL THROUGH-WALL AIR CONDITIONERS AND BATHROOM EXHAUST AS PER PLANS ASSOCIATED CONSTRUCTION FILING M10234677-I1 AND ASSOCIATED PLUMBING FILING M10234677-S2
M01234677-P1
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joshua Pulver
02/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
02/09/2026
Special inspection requirement — Final
Joshua Pulver
02/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Joshua Pulver
02/09/2026
Special inspection requirement — Lighting controls
Joshua Pulver
02/09/2026
Special inspection requirement — Interior lighting power
Joshua Pulver
02/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joshua Pulver
02/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Joshua Pulver
01/01/2026
Filed — Alteration
facade inspection
M01337613-I1
10/17/2025
Permit issued — Mechanical Systems
M01234677-S1-MS
10/17/2025
Permit issued — General Construction
M01234677-I1-GC
09/02/2025
Permit issued — Plumbing
M01234677-S2-PL
08/22/2025
Permit issued — General Construction
M01234677-I1-GC
08/22/2025
Permit issued — Mechanical Systems
M01234677-S1-MS
08/21/2025
Objection resolved — Addressed
08/13/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/01/2025
Objection raised — Structural
08/01/2025
Objection raised — Fire_Protection
08/01/2025
Objection raised — Structural
08/01/2025
Objection raised — Fire_Protection
08/01/2025
Objection raised — Structural
08/01/2025
Objection raised — Structural
07/23/2025
Objection resolved — Addressed
07/22/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
M01239034-I1
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/22/2025
Objection resolved — Addressed
07/21/2025
Objection resolved — Addressed
07/16/2025
Objection raised — Admin
07/16/2025
Objection raised — Mechanical
07/16/2025
Objection raised — Scope
07/16/2025
Objection raised — Inspections
07/16/2025
Objection raised — Admin
07/16/2025
Objection raised — Scope
07/16/2025
Objection raised — Cost
07/16/2025
Objection raised — Scope
07/16/2025
Objection raised — Inspections
07/16/2025
Objection raised — Cost
07/16/2025
Objection raised — Cost
Latest 60 of 190 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMea Construction03/06/2026
DOB NOWGeneral ConstructionPermit IssuedMea Construction03/06/2026
DOB NOWPlumbingPermit IssuedMaster 2 Plumbing & Heating02/13/2026
DOB NOWMechanical SystemsPermit IssuedMea Construction10/17/2025
DOB NOWGeneral ConstructionPermit IssuedMea Construction10/17/2025
DOB NOWPlumbingPermit IssuedZerega Contracting09/02/2025
DOB NOWGeneral ConstructionPermit IssuedMea Construction08/22/2025
DOB NOWMechanical SystemsPermit IssuedMea Construction08/22/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offIntersystems Installation S&S10/10/2024
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S10/03/2024
DOB NOWGeneral ConstructionSigned-offThink Construction07/23/2024
DOB NOWStructuralSigned-offThink Construction07/23/2024
DOB NOWMechanical SystemsSigned-offThink Construction07/23/2024
DOB NOWStructuralSigned-offThink Construction07/23/2024
DOB NOWMechanical SystemsSigned-offIceberg Mechanical05/24/2024
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting02/22/2024
DOB NOWSuspended ScaffoldPermit IssuedTwo-Tone Contracting12/05/2023
DOB NOWSupported ScaffoldPermit IssuedTwo-Tone Contracting11/03/2023
DOB NOWSidewalk ShedSigned-offKings Group NY10/23/2023
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting04/25/2023
DOB NOWGeneral ConstructionSigned-offC-Squared Contracting04/06/2023
DOB NOWGeneral ConstructionSigned-offC-Squared Contracting02/01/2023
DOB NOWPlumbingSigned-offPP Cousin01/31/2023
BISPLISSUEDGBL Mechanical09/13/2018
BISOTISSUED212 Renovations Group09/07/2018
BISPLISSUEDJag Plumbing & Mechanical03/23/2017
BISOTISSUEDInterior Management02/22/2017
BISOTISSUEDRiconda Maintenance02/21/2017
BISOTISSUEDRiconda Maintenance02/21/2017
BISOTISSUEDBrady Construction10/26/2016
BISOTISSUEDRiconda Maintenance06/30/2016
BISEQISSUEDEverest Scaffolding04/20/2016
BISEQISSUEDEverest Scaffolding04/19/2016
BISOTISSUEDInterior Management02/29/2016
BISOTISSUEDInterior Management11/05/2015
BISPLISSUEDWalter J.grande P & H09/01/2015
BISOTISSUEDV. Disalvo Contracting Co06/03/2015
BISOTISSUEDC-Squared Contracting04/03/2014
BISPLISSUEDAssociated Mechanical02/04/2014
+ 34 more permits on file
1 project · most recent 02/10/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/10/2026Permit IssuedMea ConstructionHeating and Air Conditioning Systems
Heat / Cool
Ptac ICE AIR 8RSAN13A 13,000 BTU ×4
ICE AIR 8RSAN15A 15,000 BTU ×2
8RSAN15A 15,000 BTU ×1
ICE-AIR 8RSAN15A 15,000 BTU ×1
Rsan 8RSAN13A 13,000 BTU ×1
1 project · most recent 02/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/10/2026Permit IssuedMaster 2 Plumbing & HeatingGas, Water/Sanitary
7 projects · most recent 08/14/2025
General Wiring
FiledStatusContractorScope
08/14/2025Permit IssuedEmpire Lic Electrical ContractorsGeneral Wiring
06/20/2025CompleteBorowide Elect'l Contractors—
10/25/2023CompleteHigh Quality Electric of—
01/11/2023CompleteBanner ElectricGeneral Wiring
10/28/2021CompleteCentury ElectricGeneral Wiring
04/21/2021CompleteMarks ElectricGeneral Wiring
08/09/2019CompleteInter Connection ElectricGeneral Wiring
1 project · most recent 11/02/2023
Scaffold
FiledStatusContractorScope
11/02/2023Permit IssuedTwo-Tone ContractingScaffold
1 project · most recent 02/10/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
02/10/2026Permit IssuedMea ConstructionTenant Protection Plan 72 Hour
2 projects · most recent 01/01/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
01/01/2026———
12/01/2023Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/18/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
02/09/2026Fire-Resistant Penetrations and JointsJoshua Pulverspecial
02/09/2026Fire-Resistant Penetrations and JointsJoshua Pulverspecial
02/09/2026Energy Code Compliance InspectionsJoshua Pulverprogress
02/09/2026FinalJoshua Pulverprogress
02/09/2026Fire-Resistance Rated ConstructionJoshua Pulverprogress
02/09/2026Lighting controlsJoshua Pulverenergy_progress
02/09/2026Interior lighting powerJoshua Pulverenergy_progress
02/09/2026HVAC-R and service water piping design and insulationJoshua Pulverenergy_progress
02/09/2026Energy Code Compliance InspectionsJoshua Pulverprogress
06/30/2025Maintenance informationJoshua Pulverenergy_progress
06/30/2025HVAC-R and service water heating equipmentJoshua Pulverenergy_progress
06/30/2025HVAC-R and service water heating system controlsJoshua Pulverenergy_progress
06/30/2025HVAC-R and service water piping design and insulationJoshua Pulverenergy_progress
06/30/2025Energy Code Compliance InspectionsJoshua Pulverprogress
06/02/2025FinalJoshua Pulverprogress
06/02/2025Mechanical SystemsJoshua Pulverspecial
01/29/2025FinalGEORGE GHEBRYALprogress
01/29/2025Fenestration air leakageGEORGE GHEBRYALenergy_progress
01/29/2025Air barrier - visual inspectionGEORGE GHEBRYALenergy_progress
01/29/2025Fenestration areasGEORGE GHEBRYALenergy_progress
01/29/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
01/29/2025Fenestration and door U-factor and product ratingsGEORGE GHEBRYALenergy_progress
01/23/2025Tenant Protection Plan Compliance—special
01/17/2025FinalGEORGE GHEBRYALprogress
01/17/2025Tenant Protection Plan Compliance—special
Latest 25 of 52.
▾Documents — 408 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
09/01/2026M00776792-I1Request digital key ↗
09/01/2026M08006261-P1Request digital key ↗
09/01/2026M08006261-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION34
06/10/2024102596718Open ↗
06/06/2024102596718Open ↗
06/05/2024102596718Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION30
09/13/2018123575568Open ↗
09/10/2018123575568Open ↗
04/03/2017122746109Open ↗
Showing 3 of 30 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
09/26/2017120832000Open ↗
Showing 1 of 2 on file for this type
▸Seals & Professional Certifications123
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
07/19/2019123575568Open ↗
07/19/2019123575568Open ↗
09/07/2018123575568Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
10/02/2026M01004484-S3Open ↗
09/23/2026M01234677-S1Open ↗
09/23/2026M01234677-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/01/2026M00776792-I1Open ↗
09/01/2026M08006261-P1Open ↗
09/01/2026M08006261-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/02/2026M01004484-S3Open ↗
09/23/2026M01234677-S1Open ↗
08/28/2026M01004484-S2Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
04/21/2016122762199Open ↗
01/20/2016122642667Open ↗
Showing 2 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
04/21/2016122762199Open ↗
04/20/2016140483162Open ↗
04/18/2016140484394Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
04/20/2016140483162Open ↗
04/18/2016140484394Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
04/20/2016140483162Open ↗
04/18/2016140484394Open ↗
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/02/2015140394017Open ↗
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING7
01/06/2014121338276Open ↗
12/27/2013121338276Open ↗
12/05/2013121338276Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
06/26/2018123575568Open ↗
02/08/2017122746109Open ↗
08/11/2016122746109Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
12/01/2015122407895Open ↗
03/27/2014121338276Open ↗
03/04/2014121338276Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
06/26/2018123575568Open ↗
04/25/2016122746109Open ↗
04/21/2016122762199Open ↗
▸Environmental & Asbestos35
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/01/2026M00776792-I1Open ↗
08/28/2026M00776773-S2Open ↗
08/28/2026M00776773-P1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
06/26/2018123575568Open ↗
08/19/2016122746109Open ↗
04/21/2016122762199Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026M08006261-I1Open ↗
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
07/19/2019123575568Open ↗
09/07/2018123575568Open ↗
06/26/2018123575568Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
07/19/2019123575568Open ↗
02/26/2018122762199Open ↗
12/08/2017122746109Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections2
05/21/2013121569702Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
11/05/2015140394017Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/20/2016140483162Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/06/2024102596718Open ↗
04/20/2016140483162Open ↗
04/18/2016140484394Open ↗
Showing 3 of 5 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
06/18/2024102596718Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
06/20/2024102596718Open ↗
07/19/2019123575568Open ↗
02/26/2018122762199Open ↗
Showing 3 of 18 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
11/21/2014122181986Open ↗
08/02/2013121702425Open ↗
04/08/2013121569702Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
10/17/2016122746109Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT24
06/20/2024102596718Open ↗
07/19/2019123575568Open ↗
06/26/2018123575568Open ↗
Showing 3 of 24 on file for this type
▸Filing & Intake Forms37
▸BISEFILING COVER SHEET18
06/27/2018123575568Open ↗
08/11/2016122746109Open ↗
04/25/2016122746109Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM9
07/19/2019123575568Open ↗
06/24/2019123575568Open ↗
09/13/2018123575568Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
06/26/2019123575568Open ↗
02/22/2017122746109Open ↗
01/06/2014121338276Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/20/2016140483162Open ↗
04/18/2016140484394Open ↗
10/02/2015140394017Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/05/2018122746109Open ↗
09/26/2017120819748Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form2
09/07/2018123575568Open ↗
09/13/2013121702425Open ↗
▸DOB NOWIRA Certification2
08/13/2026M00999718-I1Open ↗
08/13/2026M01337613-I1Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
06/18/2024102596718Open ↗
▸DOB NOWCalculations1
08/13/2026M00970113-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00970113-I1Open ↗