← Back
Two stories - detached, small or mid-size
79 OAKVILLE ST
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R3-1Zoning
1,664 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,100 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/20/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
05/05/2026
Signed off — Alteration
FILING HEREWITH APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01370692-I1
03/26/2026
Permit issued — Solar
S01370692-I1-SL
03/20/2026
Filed — Alteration
FILING HEREWITH APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01370692-I1
03/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/20/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/11/2026
Special inspection requirement — Final
Walid Abdulla
08/06/2003
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/26/2026
BISOTISSUEDSUNRUN INSTALLATION SVC10/17/2018
2 projects · most recent 03/20/2026
FiledStatusContractorScope
03/20/2026CompleteSUNRUN SOLAR ELECTL CORP—
10/17/2018CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/20/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/20/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/11/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/11/2026FinalWalid Abdullaprogress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01370692-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/16/2018540156472Open ↗
▸BISWORK PERMIT APPLICATION1
10/16/2018540156472Open ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026S01370692-I1Open ↗
08/29/2026S01370692-I1Open ↗
08/29/2026S01370692-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026S01370692-I1Open ↗
08/29/2026S01370692-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/16/2018540156472Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/16/2018540156472Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/16/2018540156472Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01370692-I1Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/16/2018540156472Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/16/2018540156472Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01370692-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/12/2018540156472Open ↗
10/16/2018540156472Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/12/2018540156472Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
12/12/2018540156472Open ↗
▸BISNYCECC ANALYSIS1
10/16/2018540156472Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/16/2018540156472Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/16/2018540156472Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/12/2018540156472Open ↗
10/16/2018540156472Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
12/12/2018540156472Open ↗
10/16/2018540156472Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
12/12/2018540156472Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/12/2018540156472Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01370692-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/12/2018540156472Open ↗
10/16/2018540156472Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2018540156472Open ↗