Three families
The 79 South 2nd Street Condominium
79 SOUTH 2 STREET · Williamsburg · BIN 3062919
💬 Discuss this project
2024Year Built
5Stories
C0Building Class
R6Zoning
6,757 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 79 SOUTH 2 OWNER LLC · 2,500 sf lot · 2.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Roof13p · 1 filing · 20 docs
Floor 513p · 1 filing · 20 docs
Floor 413p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
Site & exterior13p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RAMTOM8807/08/2026
OWNERS REP1007/08/2026
79 SOUTH 2 OWNER603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/01/2022$1.9M—Private party → 79 SOUTH 2 OWNER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DEMOWORKS EXPEDITING203/21/2026
THE GREEN STUDIO303/21/2026
INFOCUS DESIGN AND PLANNING PC2203/21/2026
XH&RC PLUMBING AND HEATING INC803/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GREENWOOD MONITORING LLCGeneral Contractor2607/08/2026
GWT ENTERPRISES INCGeneral Contractor407/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
RRP PLUMBING CORPPlumbing207/08/2026
DEEP FORMATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244601/19/2026
INFOCUS DESIGN & PLANNING9321008/19/2025
Building Lifecycle
All (119)Filed (26)Permit Issued (23)Signed Off (9)Violation (1)Inspection (10)Objection (20)Special Inspection (30)
06/16/2026
Signed off — Alteration
B00798530-I1
04/28/2026
Signed off — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-S3
04/02/2026
Special inspection requirement — Lighting in dwelling units
NARESH MAHANGU
04/02/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
NARESH MAHANGU
04/02/2026
Special inspection requirement — Protection of exposed foundation insulation
NARESH MAHANGU
04/02/2026
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
04/02/2026
Special inspection requirement — Masonry
NARESH MAHANGU
04/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
NARESH MAHANGU
04/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
04/02/2026
Special inspection requirement — Preliminary
NARESH MAHANGU
04/02/2026
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
04/02/2026
Special inspection requirement — Maintenance information
NARESH MAHANGU
04/02/2026
Special inspection requirement — Interior lighting power
NARESH MAHANGU
04/02/2026
Special inspection requirement — Fenestration areas
NARESH MAHANGU
04/02/2026
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
04/02/2026
Special inspection requirement — Metering
NARESH MAHANGU
04/02/2026
Special inspection requirement — Subgrade Inspections
NARESH MAHANGU
04/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
04/02/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
NARESH MAHANGU
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
04/02/2026
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
04/02/2026
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
04/02/2026
Special inspection requirement — Lighting controls
NARESH MAHANGU
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
01/19/2026
Filed — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-A8
12/29/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
12/22/2025
Special inspection requirement — Insulation placement and R values
NARESH MAHANGU
12/22/2025
Special inspection requirement — Metering
NARESH MAHANGU
12/22/2025
Special inspection requirement — Lighting controls
NARESH MAHANGU
12/22/2025
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
12/22/2025
Special inspection requirement — Exterior lighting power
NARESH MAHANGU
12/22/2025
Special inspection requirement — Concrete - Cast-In-Place
NARESH MAHANGU
12/22/2025
Special inspection requirement — Fenestration areas
NARESH MAHANGU
09/11/2025
Objection resolved — Addressed
08/29/2025
Objection raised — Other
08/19/2025
Filed — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-A7
08/06/2025
Signed off — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-S6
08/06/2025
Signed off — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-S4
07/31/2025
Signed off — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-S2
07/31/2025
Signed off — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-S1
07/25/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/17/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/05/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/15/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Other
04/17/2025
Filed — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-A6
03/24/2025
Permit issued — Sprinklers
B00707875-S2-EW-SP
03/24/2025
Permit issued — Plumbing
B00707875-S2-PL
01/28/2025
Objection resolved — Addressed
01/27/2025
Objection raised — Zoning
01/20/2025
Filed — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-A5
01/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
12/26/2024
Filed — New Building
NEW SPRINKLER AND PLUMNING FIXTURE INSTALLATION
B00707875-A4
11/26/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01028527-I1
11/26/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01076319-I1
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.03/24/2025
DOB NOWPlumbingSigned-offRRP PLUMBING CORP03/24/2025
DOB NOWStructuralPermit IssuedGREENWOOD MONITORING LLC09/23/2024
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD MONITORING LLC07/22/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC07/09/2024
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD MONITORING LLC06/21/2024
DOB NOWSupport of ExcavationSigned-offGREENWOOD MONITORING LLC06/18/2024
DOB NOWMechanical SystemsPermit IssuedGREENWOOD MONITORING LLC06/18/2024
DOB NOWFoundationSigned-offGREENWOOD MONITORING LLC06/18/2024
DOB NOWConstruction FenceSigned-offGREENWOOD MONITORING LLC05/15/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC04/02/2024
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.03/04/2024
DOB NOWPlumbingSigned-offRRP PLUMBING CORP03/01/2024
DOB NOWConstruction FenceSigned-offGREENWOOD MONITORING LLC02/12/2024
DOB NOWStructuralPermit IssuedGREENWOOD MONITORING LLC10/19/2023
DOB NOWFoundationPermit IssuedGREENWOOD MONITORING LLC10/18/2023
DOB NOWGeneral ConstructionPermit IssuedGREENWOOD MONITORING LLC10/11/2023
DOB NOWMechanical SystemsPermit IssuedGREENWOOD MONITORING LLC06/24/2023
DOB NOWSupport of ExcavationSigned-offGREENWOOD MONITORING LLC06/24/2023
DOB NOWFoundationSigned-offGREENWOOD MONITORING LLC06/24/2023
DOB NOWConstruction FenceSigned-offGREENWOOD MONITORING LLC06/14/2023
DOB NOWConstruction FenceSigned-offGREENWOOD MONITORING LLC03/10/2023
DOB NOWSidewalk ShedSigned-offDEEP FORMATION INC02/17/2023
BISEQISSUEDN TECH DESIGN OF AMERICA03/22/2023
BIS—ISSUEDN TECH DESIGN OF AMERICA03/22/2023
1 project · most recent 01/19/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/19/2026Permit IssuedGREENWOOD MONITORING LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-8C48NAHZ 48,000 BTU · Heat Pump Outdoor ×3
Heating
Mitsubishi Electric MXZ-8C48NAHZ 54,000 BTU · Heat Pump Outdoor ×3
Ventilation
Mitsubishi Electric SP-B90-QD 700 CFM ×2
1 project · most recent 01/19/2026
Sprinkler System
FiledStatusContractorScope
01/19/2026Signed-offRRP PLUMBING CORPSprinkler System
1 project · most recent 01/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/19/2026Signed-offRRP PLUMBING CORPGas, Storm, Water/Sanitary
3 projects · most recent 07/21/2025
General Wiring
FiledStatusContractorScope
07/21/2025CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring
04/29/2024CompleteTUXEDO ELEC'L CONTR'G INC—
04/12/2024CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 01/19/2026
Concrete
FiledStatusContractorScope
01/19/2026Signed-offRRP PLUMBING CORPConcrete
1 project · most recent 01/19/2026
Fence
FiledStatusContractorScope
01/19/2026Signed-offRRP PLUMBING CORPFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/25/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/17/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/05/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/03/2025Fail-Final CND-Occupancy InspectionFailView ↗
10/15/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/12/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/02/2026Exterior Insulation and Finish Systems (EIFS)NARESH MAHANGUspecial
04/02/2026Fenestration areasNARESH MAHANGUenergy_progress
04/02/2026Insulation placement and R valuesNARESH MAHANGUenergy_progress
04/02/2026MeteringNARESH MAHANGUenergy_progress
04/02/2026Interior lighting powerNARESH MAHANGUenergy_progress
04/02/2026Lighting in dwelling unitsNARESH MAHANGUenergy_progress
04/02/2026Fenestration air leakageNARESH MAHANGUenergy_progress
04/02/2026Maintenance informationNARESH MAHANGUenergy_progress
04/02/2026Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
04/02/2026Lighting controlsNARESH MAHANGUenergy_progress
04/02/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
04/02/2026Exterior lighting powerNARESH MAHANGUenergy_progress
04/02/2026Protection of exposed foundation insulationNARESH MAHANGUenergy_progress
04/02/2026PreliminaryNARESH MAHANGUprogress
04/02/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/02/2026Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
04/02/2026Subsurface Investigations (Borings/Test Pits)NARESH MAHANGUspecial
04/02/2026MasonryNARESH MAHANGUspecial
04/02/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNARESH MAHANGUspecial
04/02/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/02/2026Concrete - Cast-In-PlaceNARESH MAHANGUspecial
04/02/2026Subgrade InspectionsNARESH MAHANGUspecial
12/22/2025Lighting controlsNARESH MAHANGUenergy_progress
12/22/2025Fenestration areasNARESH MAHANGUenergy_progress
12/22/2025Exterior lighting powerNARESH MAHANGUenergy_progress
Latest 25 of 150.
▾Documents — 225 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/27/2026B00798530-I1Request digital key ↗
08/27/2026B00827654-I1Request digital key ↗
08/27/2026B00707875-A4Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
07/29/2025340856434Open ↗
05/02/2025340856434Open ↗
04/16/2025322121057Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
03/29/2023322162048Open ↗
03/29/2023322162048Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/09/2022340856434Open ↗
▸Zoning, Tax Lot & Property Records20
▸DOB NOWZD1: DOB Zoning Diagram8
08/13/2026B00707875-P1Open ↗
08/13/2026B00707875-I1Open ↗
08/13/2026B00707875-A7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWZoning Exhibit form (1-5)8
08/13/2026B00707875-A8Open ↗
08/13/2026B00707875-A6Open ↗
08/13/2026B00707875-A5Open ↗
Showing 3 of 8 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/09/2025322121057Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
05/09/2025322121057Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
05/09/2025322121057Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00707875-I1Open ↗
▸Seals & Professional Certifications84
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/27/2026B00798530-I1Open ↗
08/27/2026B00707875-A3Open ↗
08/27/2026B00707875-A4Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/03/2026B00707875-P3Open ↗
09/02/2026B00707875-S7Open ↗
09/02/2026B00707875-S7Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/03/2026B00707875-P3Open ↗
09/02/2026B00707875-P5Open ↗
09/01/2026B00707875-S5Open ↗
Showing 3 of 25 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
06/09/2022340856434Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/09/2022340856434Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
08/13/2026B00707875-P1Open ↗
08/13/2026B00707875-A2Open ↗
08/13/2026B00707875-A4Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist7
08/27/2026B00707875-I1Open ↗
08/27/2026B00707875-A4Open ↗
08/27/2026B00707875-A8Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
06/09/2022340856434Open ↗
▸BISSTREET TREE CHECKLIST1
06/09/2022340856434Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/29/2023322162048Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00707875-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00707875-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00707875-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/29/2023322162048Open ↗
▸BISRODENT CONTROL1
03/22/2023322162048Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/27/2026B00707875-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT8
08/13/2026B00707875-A5Open ↗
08/13/2026B00707875-A6Open ↗
08/13/2026B00707875-A7Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00707875-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/21/2025340856434Open ↗
▸BISLANDMARKS APPROVAL1
03/22/2023322162048Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
03/22/2023322162048Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/22/2023322162048Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
04/16/2025322121057Open ↗
08/22/2022322162048Open ↗
06/09/2022322162048Open ↗
▸BISADDITIONAL INFORMATION2
08/08/2025340856434Open ↗
01/15/2025340856434Open ↗
▸BISBOROUGH INTAKE FORM1
03/22/2023322162048Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/08/2025340856434Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/09/2022340856434Open ↗
▸Other Documents39
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
03/22/2023322162048Open ↗
03/22/2023322162048Open ↗
03/22/2023322162048Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial8
08/13/2026B00707875-A2Open ↗
08/13/2026B00707875-P1Open ↗
08/13/2026B00707875-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone8
08/13/2026B00707875-A4Open ↗
08/13/2026B00707875-A5Open ↗
08/13/2026B00707875-A6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification7
08/27/2026B00707875-A4Open ↗
08/27/2026B00707875-I1Open ↗
08/27/2026B00707875-A8Open ↗
Showing 3 of 7 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
05/09/2025322121057Open ↗
05/09/2025322121057Open ↗
03/22/2023322162048Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/09/2025322121057Open ↗
▸BISPLOT DIAGRAM1
05/09/2025322121057Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/15/2025340856434Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00707875-S5Open ↗
▸DOB NOWFinal Survey1
08/27/2026B00707875-I1Open ↗