← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
79 WASHINGTON PLACE
MANHATTAN · Greenwich Village · BIN 1008900
💬 Discuss this project
1915Year Built
8Stories
D0Building Class
R7-2Zoning
22,170 sfGross Floor Area
15Units
Rent Stabilized2 Active Violations 1 unresolved · 1 paperwork only 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: 79 Washington Place Realty · 3,980 sf lot · 5.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMasonry repairs at north facade11p · 2 filings · 15 docs
Floor 8Unit 8R8p · 2 filings · 15 docs
Floor 7Masonry repairs at north facade7p · 1 filing · 8 docs
Floor 6Masonry repairs at north facade7p · 1 filing · 8 docs
Floor 5Masonry repairs at north facade7p · 1 filing · 8 docs
Floor 4Masonry repairs at north facade7p · 1 filing · 8 docs
Floor 3
Floor 2
Floor 1
Site & exteriorMasonry repairs at north facade35p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
79 Washington Place Realty3203/22/2026
250 West 57th St103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Melone Architects204/18/2024
Lombardo Professional Engineering404/03/2024
Vincent J. Liotta P.E106/21/2021
Pace Engineering410/11/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boyd Consulting403/21/2026
Lombardo Building Consultants403/21/2026
Eurocelt Expediting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Brend RestorationScaffold1207/08/2026
Brend Restorationspecialty_contractor603/21/2026
Perfectaire CoGeneral Contractor203/21/2026
Lina ElectricElectrical103/22/2026
Campisi PeterElectrical103/21/2026
Salvatore Campisi & SonsElectrical103/21/2026
Caputek Electrical ServicesElectrical103/21/2026
Top Shelf ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Melone Architects2944404/18/2024
Vincent J. Liotta P. E1974106/21/2021
Building Lifecycle
All (75)Filed (11)Permit Issued (11)Signed Off (7)Facade (FISP) (13)Violation (24)Special Inspection (9)
06/06/2025
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00957453-I1
06/06/2025
Signed off — Alteration
TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00957444-I1
06/02/2025
Signed off — Alteration
Filing for select masonry repairs as shown on drawings and as specified. No change in use, egress, or occupancy.
M00946982-I1
12/09/2024
Permit issued — General Construction
M00946982-I1-GC
11/07/2024
Permit issued — Sidewalk Shed
M00957444-I1-SH
11/07/2024
Permit issued — Supported Scaffold
M00957453-I1-SF
07/15/2024
Cycle 9 facade report signed — SWARMP
04/18/2024
Filed — Alteration
Filing for select masonry repairs as shown on drawings and as specified. No change in use, egress, or occupancy.
M00946982-P1
04/03/2024
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00957453-P2
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/20/2024
Cycle 9 facade report submitted
02/15/2024
Cycle 9 facade inspection completed
01/18/2024
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00957453-P1
12/13/2023
Permit issued — General Construction
M00946982-I1-GC
12/12/2023
Signed off — Alteration
REPLACEMENT OF TWO UNITS ON THE 8TH FLOOR WITH A TOTAL CAPACITY OF 8 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00495350-I1
11/13/2023
Permit issued — Sidewalk Shed
M00957444-I1-SH
11/13/2023
Permit issued — Supported Scaffold
M00957453-I1-SF
11/09/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00957453-I1
11/09/2023
Filed — Alteration
TEMPORARY INSTALLATION AND USE OF SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00957444-I1
10/16/2023
Filed — Alteration
Filing for select masonry repairs as shown on drawings and as specified. No change in use, egress, or occupancy.
M00946982-I1
07/13/2023
Violation issued (FDNY_NOV, closed)
07/06/2021
Permit issued — Mechanical Systems
M00495350-I1-MS
06/21/2021
Filed — Alteration
REPLACEMENT OF TWO UNITS ON THE 8TH FLOOR WITH A TOTAL CAPACITY OF 8 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00495350-I1
03/30/2021
Special inspection requirement — Maintenance information
Vincent Liotta
03/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
03/30/2021
Special inspection requirement — Mechanical Systems
Vincent Liotta
03/30/2021
Special inspection requirement — Final
Vincent Liotta
03/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
03/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
05/05/2020
Signed off — Alteration
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00050215-I1
09/06/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/22/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/23/2019
Cycle 8 facade inspection completed
05/23/2019
Cycle 8 facade report signed — SWARMP
05/22/2019
Violation issued (ECB, closed)
Construction
04/18/2019
Permit issued — Supported Scaffold
M00050215-I1-SF
02/20/2019
Cycle 8 facade report submitted
02/13/2019
Signed off — Alteration
M00046095-I1
10/12/2018
Special inspection requirement — Final
Baris Acar
10/11/2018
Filed — Alteration
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00050215-P1
06/06/2018
Filed — Alteration
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00050215-I1
06/06/2018
Permit issued — Supported Scaffold
M00050215-I1-SF
06/05/2018
Signed off — Alteration
INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00047775-I1
05/31/2018
Filed — Alteration
INSTALLATION OF A SCAFFOLD AS PER PLANS IN CONJUNCTION WITH FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00047775-I1
05/31/2018
Permit issued — Supported Scaffold
M00047775-I1-SF
05/25/2018
Special inspection requirement — Final
Baris Acar
05/24/2018
Filed — Alteration
M00046095-I1
05/24/2018
Permit issued — Sidewalk Shed
M00046095-I1-SH
05/21/2018
Special inspection requirement — Final
Baris Acar
09/12/2017
Violation issued (ECB, open)
Local Law
04/28/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/16/2015
Violation issued (FDNY_NOV, closed)
02/02/2015
Violation issued (HPD, closed)
I
05/30/2014
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/05/2014
Violation issued (FDNY_NOV, closed)
08/08/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/19/2012
Cycle 7 facade report submitted
04/04/2012
Cycle 7 facade report signed — SAFE
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBrend Restoration12/09/2024
DOB NOWSidewalk ShedSigned-offBrend Restoration11/07/2024
DOB NOWSupported ScaffoldSigned-offBrend Restoration11/07/2024
DOB NOWGeneral ConstructionSigned-offBrend Restoration12/13/2023
DOB NOWSidewalk ShedSigned-offBrend Restoration11/13/2023
DOB NOWSupported ScaffoldSigned-offBrend Restoration11/13/2023
DOB NOWMechanical SystemsSigned-offPerfectaire Co07/06/2021
DOB NOWSupported ScaffoldSigned-offBrend Restoration04/18/2019
DOB NOWSupported ScaffoldSigned-offBrend Restoration06/06/2018
DOB NOWSupported ScaffoldSigned-offBrend Restoration05/31/2018
DOB NOWSidewalk ShedSigned-offBrend Restoration05/24/2018
BISOTISSUEDBrend Restoration04/18/2019
BISOTISSUEDBrend Restoration06/19/2018
BISPLISSUEDV.A.L. Plumbing & Heating07/10/2017
BISMHISSUEDManhattan Mechanical Cont04/17/2017
BISPLISSUEDPractical Plumbing & Heating04/24/2012
BISPLISSUEDPractical Plumbing & Heating03/29/2010
BISMHISSUEDPerimeter 36001/20/2010
BISOTISSUEDEast Coast Restoration & Consulting07/08/2008
BISPLISSUEDMcManus Mechanical Maintenance P&H01/24/2008
BISOTISSUEDD. Mitchell Contracting01/17/2008
BISEQISSUEDRockledge Scaffold01/07/2008
BISEQISSUEDRockledge Scaffold04/06/2007
BISEQISSUEDRockledge Scaffold06/17/2004
BISEQISSUEDRockledge Scaffold06/17/2004
BISPLISSUEDL.R.P11/12/2003
BISOTISSUEDOriental Construction09/11/2003
BISPLISSUEDM. Early Plumbing & Heating03/01/2001
BISOTISSUEDHorizon of Long Island12/20/2000
BISOTISSUEDHorizon of Long Island12/20/2000
BISEQISSUEDDelta Waterproofing & Restoration07/01/1999
4 projects · most recent 12/16/2025
General Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedCaputek Electrical Services—
11/07/2023CompleteTop Shelf Electric—
08/17/2020CompleteLina ElectricGeneral Wiring
05/18/2018CompleteTop Shelf Electric—
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/30/2021Maintenance informationVincent Liottaenergy_progress
03/30/2021HVAC-R and service water heating system controlsVincent Liottaenergy_progress
03/30/2021Mechanical SystemsVincent Liottaspecial
03/30/2021FinalVincent Liottaprogress
03/30/2021HVAC-R and service water heating equipmentVincent Liottaenergy_progress
03/30/2021HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
10/12/2018FinalBaris Acarprogress
05/25/2018FinalBaris Acarprogress
05/21/2018FinalBaris Acarprogress
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/06/2026M00046095-I1Request digital key ↗
09/06/2026M00047775-I1Request digital key ↗
09/06/2026M00050215-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION11
05/21/2019122975557Open ↗
09/27/2017123037383Open ↗
09/08/2017123037383Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION9
04/19/2019122975557Open ↗
06/19/2018122975557Open ↗
07/20/2017123037383Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00946982-I1Open ↗
08/13/2026M00495350-I1Open ↗
08/13/2026M00946982-P1Open ↗
▸Seals & Professional Certifications38
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
03/20/2020122975557Open ↗
03/20/2020122975557Open ↗
03/20/2020122975557Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/06/2026M00047775-I1Open ↗
09/06/2026M00050215-P1Open ↗
09/06/2026M00050215-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026M00047775-I1Open ↗
08/31/2026M00495350-I1Open ↗
08/31/2026M00495350-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/15/2010120245715Open ↗
01/15/2010120245715Open ↗
01/15/2010120245715Open ↗
▸BISPC FULL REPORT2
11/01/2007110011193Open ↗
11/01/2007110011193Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/13/2017123037383Open ↗
01/15/2010120245715Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/13/2017123037383Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026M00495350-I1Open ↗
▸Trade Schedules & Equipment15
▸BISSELF-CERT PLUMBING NOTICE5
04/11/2013120245715Open ↗
07/05/2012120245715Open ↗
05/14/2012120245715Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/27/2017123037383Open ↗
09/08/2017123037383Open ↗
03/13/2017123037383Open ↗
▸BISSCHEDULE B - PLUMBING3
10/10/2012120245715Open ↗
03/02/2012120245715Open ↗
01/15/2010120245715Open ↗
▸BISEQUIPMENT USE PERMITS2
03/07/2018123037383Open ↗
07/18/2017123037383Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/07/2018123037383Open ↗
07/18/2017123037383Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
03/13/2017123037383Open ↗
02/10/2017122975557Open ↗
▸Environmental & Asbestos10
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
01/15/2010120245715Open ↗
01/15/2010120245715Open ↗
01/15/2010120245715Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
03/13/2017123037383Open ↗
02/10/2017122975557Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026M00946982-I1Open ↗
08/27/2026M00946982-P1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/20/2020122975557Open ↗
03/20/2020122975557Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/20/2020122975557Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00495350-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLANDMARKS APPROVAL7
03/20/2020122975557Open ↗
03/07/2018123037383Open ↗
03/16/2017122975557Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/20/2020122975557Open ↗
03/07/2018123037383Open ↗
12/06/2013120245715Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/15/2010120245715Open ↗
11/01/2007110011193Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
03/20/2020122975557Open ↗
03/07/2018123037383Open ↗
06/27/2017123037383Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms10
▸BISBOROUGH INTAKE FORM4
03/20/2020122975557Open ↗
05/21/2019122975557Open ↗
03/07/2018123037383Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
08/21/2019122975557Open ↗
06/26/2017123037383Open ↗
03/16/2017122975557Open ↗
▸BISEFILING COVER SHEET3
03/13/2017123037383Open ↗
02/10/2017122975557Open ↗
01/15/2010120245715Open ↗
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
04/04/2017122975557Open ↗
03/29/2017123037383Open ↗
03/16/2017122975557Open ↗