← Back
Two family frame
79 WEIRFIELD STREET
BROOKLYN · Bushwick (East) · BIN 3078225
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R6Zoning
3,000 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · 2,000 sf lot · 1.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Basement7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
USA DEVELOPMENT1607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/16/2025$2.2M—— → —$740/sf building
08/29/2022$1.8M—159 MTEK LLC → Private party$609/sf building
08/31/2021$800K—— → —$267/sf building
01/17/2020$415K—— → —$138/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES604/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor107/08/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM AND CO CONSULTING LLC8065404/25/2022
Building Lifecycle
All (49)Filed (6)Permit Issued (2)Signed Off (2)Violation (14)Inspection (5)Special Inspection (20)
12/04/2024
Violation issued (HPD, closed)
I
11/28/2023
Violation issued (HPD, closed)
I
11/17/2022
Violation issued (HPD, closed)
I
05/17/2022
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. REPLACE ROLL UP GARAGE DOOR. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00613771-I1
05/16/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/26/2022
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
04/26/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
04/26/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
04/25/2022
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. REPLACE ROLL UP GARAGE DOOR. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00613771-P3
04/25/2022
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
04/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
04/25/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
04/08/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/06/2022
Signed off — Alteration
EXISTING TWO STORY BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00614047-I1
03/23/2022
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. REPLACE ROLL UP GARAGE DOOR. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00613771-P2
03/23/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
03/23/2022
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
03/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
03/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/28/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/04/2022
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
01/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
01/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
01/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
01/03/2022
Filed — Alteration
EXISTING TWO STORY BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00614047-P1
12/13/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. REPLACE ROLL UP GARAGE DOOR. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00613771-P1
12/13/2021
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
12/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHI WAI CHUNG
12/13/2021
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
12/13/2021
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
12/13/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
12/13/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHI WAI CHUNG
12/13/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHI WAI CHUNG
11/17/2021
Permit issued — Plumbing
B00614047-I1-PL
11/10/2021
Permit issued — General Construction
B00613771-I1-GC
10/21/2021
Filed — Alteration
EXISTING TWO STORY BUILDING. PLUMBING WORK. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00614047-I1
10/19/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. REPLACE ROLL UP GARAGE DOOR. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00613771-I1
01/30/2020
Violation issued (FDNY_NOV, closed)
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/13/2015
Violation issued (HPD, closed)
B
10/13/2015
Violation issued (HPD, closed)
B
10/13/2015
Violation issued (HPD, closed)
B
10/13/2015
Violation issued (HPD, closed)
B
10/13/2015
Violation issued (HPD, closed)
B
01/30/2005
Violation issued (HPD, closed)
C
10/14/1993
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
10/14/1993
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP11/17/2021
DOB NOWGeneral ConstructionSigned-offSTELLAR INDUSTRIES INC11/10/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
04/08/2022Fail-Final General Construction Non-Directive 14FailView ↗
03/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/26/2022Interior lighting powerCHI WAI CHUNGenergy_progress
04/26/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
04/26/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
04/25/2022Interior lighting powerCHI WAI CHUNGenergy_progress
04/25/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
04/25/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
03/23/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
03/23/2022Interior lighting powerCHI WAI CHUNGenergy_progress
03/23/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
01/04/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
01/04/2022HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
01/04/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
01/04/2022HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
12/13/2021Energy Code Compliance InspectionsCHI WAI CHUNGprogress
12/13/2021Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
12/13/2021Energy Code Compliance InspectionsCHI WAI CHUNGprogress
12/13/2021Interior lighting powerCHI WAI CHUNGenergy_progress
12/13/2021HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
12/13/2021HVAC-R and service water heating equipmentCHI WAI CHUNGenergy_progress
12/13/2021HVAC-R and service water heating system controlsCHI WAI CHUNGenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00614047-P1Request digital key ↗
08/31/2026B00614047-I1Request digital key ↗
08/31/2026B00613771-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature16
09/30/2026B00614047-I1Open ↗
09/30/2026B00614047-I1Open ↗
09/30/2026B00614047-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026B00613771-P1Open ↗
08/13/2026B00613771-P3Open ↗
08/13/2026B00614047-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B00613771-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026B00613771-P3Open ↗
08/13/2026B00613771-I1Open ↗
08/13/2026B00614047-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00614047-I1Open ↗
08/13/2026B00613771-I1Open ↗