← Back
Elevator apt, semi-fireproof with stores
790 ALLERTON AVENUE
BRONX · Allerton · BIN 2130668
💬 Discuss this project
2022Year Built
7Stories
D7Building Class
R6Zoning
70,116 sfGross Floor Area
46Units
LL97 Covered2 Open Violations 0 unresolved · 2 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: 790 ALLERTON LLC · 17,722 sf lot · 3.96 FAR built · Flood zone X
Locations of Work
StructuralPlumbingFire ProtectionGeneral
Roof6p · 3 filings · 20 docs
Bulkhead2p · 2 filings · 9 docs
Floor 75p · 3 filings · 20 docs
Floor 64p · 2 filings · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 35p · 3 filings · 20 docs
Floor 25p · 3 filings · 20 docs
Floor 18p · 4 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP1407/08/2026
GLOBAL MANAGEMENT3607/08/2026
TUCCI EQUIPMENT RENTAL CORP1103/22/2026
SMART CONSULTING NY503/22/2026
MANAGEMENT LLC GLOBAL303/22/2026
TUCCIMAR703/22/2026
790 ALLERTON2803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/17/2015$2.0M—Private party → 790 ALLERTON LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2003/21/2026
A1 EXPEDITING SERVICE1203/21/2026
SIERRA SAFETY CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLOBAL MANAGEMENT LLCGeneral Contractor2107/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor1907/08/2026
TUCCIMAR INCGeneral Contractor707/08/2026
S & L PLUMBING INCPlumbing603/22/2026
AKM CONSTRUCTION NY CORPGeneral Contractor507/08/2026
A.M. SAGE PLG & HTG LLCPlumbing407/08/2026
DNA PLUMBING CONTR. INCPlumbing407/08/2026
EXPERT FIRE SPRINKLER,LLCFire Protection207/08/2026
TOWER FIRE PROTECTION INCFire Protection107/08/2026
JOHNNYS MASTER PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
COASTAL CONSTRUCTION SERV38271210/14/2025
A&B WORLD CONSULTING, INC5704106/16/2020
Building Lifecycle
All (188)Filed (20)Permit Issued (40)Signed Off (11)Violation (53)Inspection (12)Objection (26)Special Inspection (26)
04/13/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
02/20/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/18/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/12/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
12/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH FREGLETTE
10/31/2025
Special inspection requirement — Standpipe Systems
JOSEPH FREGLETTE
10/31/2025
Special inspection requirement — Sprinkler Systems
JOSEPH FREGLETTE
10/31/2025
Special inspection requirement — Post-installed Anchors
JOSEPH FREGLETTE
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Fire_Protection
10/15/2025
Objection raised — Fire_Protection
10/14/2025
Filed — Alteration
PROPOSE PLUMBING WORK TYPE FILING IN CONJUNCTION WITH NB # 220589245. THIS APPLICATION IS TO SUPERSEDE NB # 220589245 DOC 01 PLUMBING WORK TYPE.
X00443989-P2
10/10/2025
Filed — Alteration
Propose Sprinkler and Standpipe scope of work filed in conjunction with NB # 220589245. This application is to supersede Alt 2 # 240251062, Sprinkler Work Type.
X00474286-P1
09/09/2025
Permit issued — Standpipe
X00474286-I1-EW-SD
09/09/2025
Permit issued — Sprinklers
X00474286-I1-EW-SP
07/24/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/11/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/01/2025
Permit issued — Plumbing
X00443989-I1-PL
02/19/2025
Signed off — Alteration
Propose Structural scope of work filed in conjunction with NB 220589245.
X00516081-I1
02/19/2025
Signed off — Alteration
Propose Foundation Scope of Work filed in conjunction with NB 220589245; SOE application is filed under # 240283037. Fence filed under #X00357107
X00505159-I1
01/30/2025
Permit issued — Plumbing
X00443989-I1-PL
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00877349-I1
11/20/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00877349-S2
11/20/2024
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00877349-S1
11/01/2024
Permit issued — Sprinklers
X00474286-I1-EW-SP
11/01/2024
Permit issued — Sprinklers
X00474286-I1-EW-SD
10/31/2024
Permit issued — Plumbing
X00443989-I1-PL
10/30/2024
Permit issued — Structural
X00516081-I1-ST
10/30/2024
Permit issued — Foundation
X00505159-I1-FO
10/14/2024
Signed off — Alteration
X00910310-I1
09/26/2024
Signed off — Alteration
X00580399-I1
09/26/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG DEMOLITION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X00583549-I1
09/26/2024
Signed off — Alteration
X00580390-I1
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH FREGLETTE
09/19/2024
Special inspection requirement — Post-installed Anchors
JOSEPH FREGLETTE
09/19/2024
Special inspection requirement — Sprinkler Systems
JOSEPH FREGLETTE
09/19/2024
Special inspection requirement — Standpipe Systems
JOSEPH FREGLETTE
06/20/2024
Permit issued — Sidewalk Shed
X00877349-I1-SH
05/23/2024
Permit issued — Construction Fence
X07994902-I1-FN
05/16/2024
Violation issued (ECB, closed)
Construction
05/16/2024
Violation issued (ECB, closed)
Unknown
05/16/2024
Violation issued (ECB, closed)
Construction
05/13/2024
Violation issued (ECB, closed)
Construction
05/13/2024
Violation issued (ECB, closed)
Construction
05/13/2024
Violation issued (ECB, closed)
Unknown
05/10/2024
Violation issued (ECB, closed)
Unknown
05/03/2024
Permit issued — Sidewalk Shed
X00583549-I1-SH
05/02/2024
Permit issued — Construction Fence
X00580390-I1-FN
05/02/2024
Permit issued — Protection and Mechanical Methods
X00580399-I1-PM
04/19/2024
Objection resolved — Addressed
03/13/2024
Violation issued (ECB, open)
Construction
02/13/2024
Violation issued (ECB, closed)
Unknown
02/13/2024
Violation issued (ECB, open)
Unknown
02/13/2024
Violation issued (ECB, closed)
Construction
02/13/2024
Violation issued (ECB, closed)
Unknown
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedEXPERT FIRE SPRINKLER,LLC09/09/2025
DOB NOWSprinklersSigned-offEXPERT FIRE SPRINKLER,LLC09/09/2025
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC04/01/2025
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC01/30/2025
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC11/01/2024
DOB NOWSprinklersPermit IssuedDNA PLUMBING CONTR. INC11/01/2024
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC10/31/2024
DOB NOWStructuralSigned-offGLOBAL MANAGEMENT LLC10/30/2024
DOB NOWFoundationSigned-offGLOBAL MANAGEMENT LLC10/30/2024
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY06/20/2024
DOB NOWConstruction FencePermit IssuedGLOBAL MANAGEMENT LLC05/23/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/03/2024
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP05/02/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/02/2024
DOB NOWStructuralSigned-offGLOBAL MANAGEMENT LLC11/15/2023
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY09/14/2023
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY09/11/2023
DOB NOWProtection and Mechanical MethodsSigned-offGLOBAL MANAGEMENT LLC08/09/2023
DOB NOWStandpipePermit IssuedDNA PLUMBING CONTR. INC07/25/2023
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC07/25/2023
DOB NOWPlumbingSigned-offA.M. SAGE PLG & HTG LLC07/20/2023
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY06/14/2023
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/08/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/06/2023
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP05/05/2023
DOB NOWConstruction FencePermit IssuedGLOBAL MANAGEMENT LLC04/20/2023
DOB NOWGeneral ConstructionSigned-offGLOBAL MANAGEMENT LLC03/28/2023
DOB NOWGeneral ConstructionSigned-offGLOBAL MANAGEMENT LLC01/27/2023
DOB NOWFoundationSigned-offGLOBAL MANAGEMENT LLC09/20/2022
DOB NOWConstruction FencePermit IssuedGLOBAL MANAGEMENT LLC08/22/2022
DOB NOWFoundationSigned-offGLOBAL MANAGEMENT LLC08/18/2022
DOB NOWStructuralSigned-offGLOBAL MANAGEMENT LLC08/18/2022
DOB NOWConstruction FenceSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/05/2022
DOB NOWPlumbingSigned-offJOHNNYS MASTER PLBG CORP03/31/2022
DOB NOWFoundationSigned-offTUCCIMAR INC01/24/2022
DOB NOWStructuralSigned-offTUCCIMAR INC01/13/2022
DOB NOWSprinklersSigned-offTPC THIRD PARTY CONSULT L12/13/2021
DOB NOWConstruction FencePermit IssuedTUCCIMAR INC11/24/2021
+ 27 more permits on file
1 project · most recent 10/10/2025
FiledStatusContractorScope
10/10/2025Signed-offEXPERT FIRE SPRINKLER,LLC1,068 heads, 27 outlets
2 projects · most recent 10/14/2025
Storm Water/Sanitary
FiledStatusContractorScope
10/14/2025Signed-offA.M. SAGE PLG & HTG LLCStorm, Water/Sanitary
10/10/2025Permit IssuedDNA PLUMBING CONTR. INC—
3 projects · most recent 05/09/2026
General Wiring
FiledStatusContractorScope
05/09/2026CompleteAL ELECTRICAL GROUP INCGeneral Wiring
05/18/2023Permit IssuedHIGH QUALITY ELECTRIC OF—
08/19/2020CompleteTOP SHELF ELECTRIC CORP—
1 project · most recent 09/02/2022
Fence
FiledStatusContractorScope
09/02/2022Permit IssuedGLOBAL MANAGEMENT LLCFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/13/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/20/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/18/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/23/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2022Pass-Final PL - UndergroundPassView ↗
09/20/2022Pass-Final PL - UndergroundPassView ↗
05/27/2022Pass-Final PL - UndergroundPassView ↗
04/07/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/31/2025Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
10/31/2025Standpipe SystemsJOSEPH FREGLETTEspecial
10/31/2025Sprinkler SystemsJOSEPH FREGLETTEspecial
10/31/2025Post-installed AnchorsJOSEPH FREGLETTEspecial
09/19/2024Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
09/19/2024Post-installed AnchorsJOSEPH FREGLETTEspecial
09/19/2024Sprinkler SystemsJOSEPH FREGLETTEspecial
09/19/2024Standpipe SystemsJOSEPH FREGLETTEspecial
12/08/2023FinalJOSEPH FREGLETTEprogress
12/08/2023Structural Stability – Alterations of existing buildingsJOSEPH FREGLETTEspecial
08/09/2023Post-installed AnchorsJOSEPH FREGLETTEspecial
04/05/2023Structural Stability – Alterations of existing buildingsJOSEPH FREGLETTEspecial
04/05/2023DemolitionJOSEPH FREGLETTEspecial
04/05/2023FinalJOSEPH FREGLETTEprogress
04/05/2023Construction Operations Influencing Adjacent StructuresJOSEPH FREGLETTEspecial
03/31/2023Construction Operations Influencing Adjacent StructuresJOSEPH FREGLETTEspecial
03/31/2023FinalJOSEPH FREGLETTEprogress
03/31/2023Structural Stability – Alterations of existing buildingsJOSEPH FREGLETTEspecial
03/31/2023DemolitionJOSEPH FREGLETTEspecial
01/26/2023Deep Foundation Elements—special
01/24/2023Concrete - Cast-In-PlaceJOSEPH FREGLETTEspecial
01/24/2023Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
01/24/2023FinalJOSEPH FREGLETTEprogress
01/24/2023Footing and FoundationJOSEPH FREGLETTEprogress
01/24/2023Subgrade InspectionsJOSEPH FREGLETTEspecial
Latest 25 of 26.
▾Documents — 440 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch14
08/25/2026X00505159-I1Request digital key ↗
08/25/2026X00580390-I1Request digital key ↗
08/25/2026X00580399-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/26/2026X00353654-I1Request digital key ↗
08/18/2026X00474286-I1Request digital key ↗
08/15/2026X00474286-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/18/2026X00474286-I1Request digital key ↗
08/15/2026X00474286-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/18/2026X00443989-P2Request digital key ↗
08/18/2026X00443989-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00357107-I1Request digital key ↗
▸Applications & Permits88
▸BISPLAN / WORK APPROVAL APPLICATION58
01/13/2026220589245Open ↗
01/12/2026220589245Open ↗
01/07/2026220589245Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION30
04/26/2023220589245Open ↗
04/26/2023220589245Open ↗
08/23/2022240283037Open ↗
Showing 3 of 30 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
03/25/2022220589245Open ↗
Showing 1 of 2 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/20/2026220589245Open ↗
▸Seals & Professional Certifications63
▸DOB NOWSpecial Inspector Seal & Signature20
09/25/2026X00474286-P1Open ↗
09/25/2026X00474286-P1Open ↗
09/25/2026X00474286-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026X00353654-I1Open ↗
08/26/2026X00357107-I1Open ↗
08/25/2026X00516081-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
06/22/2022240283037Open ↗
04/08/2022220589245Open ↗
04/08/2022220589245Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026X00812786-P1Open ↗
08/29/2026X00812786-I1Open ↗
08/25/2026X00973986-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISGAS CUT-OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST4
12/06/2024220589254Open ↗
03/25/2022220589245Open ↗
Showing 2 of 4 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
07/28/2021220728443Open ↗
Showing 1 of 3 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/08/2024220589254Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/26/2026X00353654-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
04/07/2025220589245Open ↗
03/25/2022220589245Open ↗
03/25/2022220589245Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/08/2022220589245Open ↗
04/08/2022220589245Open ↗
Showing 2 of 3 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
04/07/2025220589245Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/07/2025220589245Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
04/07/2025220589245Open ↗
▸BISELECTRIC MOTORS1
04/07/2025220589245Open ↗
▸BISLIGHTING CONTROLS1
04/07/2025220589245Open ↗
▸Inspections & Test Reports44
▸BISTECHNICAL REPORT: RESPONSIBILITY18
04/07/2025220589245Open ↗
08/03/2022240283037Open ↗
07/27/2022240283037Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
04/08/2022220589245Open ↗
04/08/2022220589245Open ↗
04/08/2022220589245Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISSOIL REPORT2
04/29/2021240283037Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026X00505159-P1Open ↗
08/13/2026X00505159-I1Open ↗
▸BISPOST-INSTALLED ANCHORS1
06/16/2023240283037Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00505159-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00505159-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026X00505159-I1Open ↗
▸Approvals, Objections & Sign-offs69
▸BISLETTERS - SUPPORTING DOCUMENTATION35
03/10/2025220000219Open ↗
02/10/2025220013937Open ↗
04/26/2023220589245Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE14
01/12/2026220589245Open ↗
01/07/2026220589245Open ↗
12/31/2025220589245Open ↗
Showing 3 of 14 on file for this type
▸BISSUPERSEDING LETTER12
08/23/2022240283037Open ↗
08/23/2022220589245Open ↗
08/23/2022220589245Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPRVD FAB CERT-COMPLIANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFINAL1
06/16/2023240283037Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPRVD FAB CERT-INTENT1
07/28/2021220728443Open ↗
▸Cost, Insurance & Ownership10
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/23/2022220589245Open ↗
04/08/2022220589245Open ↗
07/28/2021220728443Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT4
04/29/2021240283037Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/16/2023240283037Open ↗
▸Filing & Intake Forms48
▸BISADDITIONAL INFORMATION24
01/20/2026220589245Open ↗
01/20/2026220589245Open ↗
10/16/2025220589245Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM14
04/26/2023220589245Open ↗
08/23/2022240283037Open ↗
08/23/2022220589245Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents10
▸DOB NOWWaiver Document4
08/13/2026X00474286-P1Open ↗
08/13/2026X00474286-I1Open ↗
08/13/2026X00443989-P2Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISUNDERPINNING (2014)2
04/07/2025220589245Open ↗
06/16/2023240283037Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
04/07/2025220589245Open ↗
▸BISMAINTENANCE INFORMATION1
04/07/2025220589245Open ↗