← Back
BuildNYC
Two family brick
790 EAST 37TH STREET
BROOKLYN · BIN 3113932
💬 Discuss this project
1940Year Built
2Stories
B1Building Class
R4Zoning
1,710 sfGross Floor Area
2Units
10 Active Violations ▸FDNY Report ↗
Two family brick · 1,800 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTemporary roof and tie back pins, lintel installationUnder Construction2p · 1 filing · 13 docs
Floor 2Temporary roof and tie back pins, lintel installationUnder Construction3p · 1 filing · 13 docs
Floor 1Temporary roof and tie back pins, lintel installationUnder Construction4p · 1 filing · 13 docs
CellarTemporary roof and tie back pins, lintel installationUnder Construction3p · 1 filing · 13 docs
Site & exteriorTemporary roof and tie back pins, lintel installationUnder Construction12p · 1 filing · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/21/2017$530K—Private party → Private party$310/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Greystone303/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Big Orange Expediting403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JV Fast ConstructionGeneral Contractor303/21/2026
Urena Construction & DesignScaffold110/10/2026
Kishan PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Greystone Engineering Con2973204/03/2025
Building Lifecycle
All (39)Filed (3)Permit Issued (3)Violation (14)Inspection (2)Objection (12)Special Inspection (5)
10/14/2026
Violation issued (ECB, open)
Construction
10/14/2026
Violation issued (ECB, open)
Construction
10/09/2026
Permit issued — Construction Fence
B01190570-S3-FN
07/30/2026
Violation issued (ECB, open)
Construction
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2026
Filed — Alteration
PLUMBING RELATED TO REMOVAL&TEMP REPAIR AS PER COMMISS HOLD ON IED#18653.REMOVE 2ND FLOOR BATH & 1ST FLOOR GAS RANGE & KITCHEN SINK. REMOVE 1ST FLOOR 1/2 BATH. REMOVE NON- PERMITTED CELLAR 3 PC BATH AND GAS PIPING & SINK IN CELLAR. AS PER PLANS.
B01190570-S3
03/02/2026
Violation issued (ECB, open)
Construction
03/02/2026
Violation issued (ECB, open)
Unknown
02/18/2026
Permit issued — Plumbing
B01190570-S1-PL
12/02/2025
Permit issued — General Construction
B01190570-I1-GC-CX
06/06/2025
Filed — Alteration
PLUMBING RELATED TO REMOVAL&TEMP REPAIR AS PER COMMISS HOLD ON IED#18653.REMOVE 2ND FLOOR BATH & 1ST FLOOR GAS RANGE & KITCHEN SINK. REMOVE 1ST FLOOR 1/2 BATH. REMOVE NON- PERMITTED CELLAR 3 PC BATH AND GAS PIPING & SINK IN CELLAR. AS PER PLANS.
B01190570-S1
05/07/2025
Objection raised — Other
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Other
05/07/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Other
05/07/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Other
05/02/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/30/2025
Objection resolved — Addressed
04/11/2025
Objection raised — Other
04/08/2025
Objection raised — Other
04/03/2025
Filed — Alteration
PLUMBING RELATED TO REMOVAL&TEMP REPAIR AS PER COMMISS HOLD ON IED#18653.REMOVE 2ND FLOOR BATH & 1ST FLOOR GAS RANGE & KITCHEN SINK. REMOVE 1ST FLOOR 1/2 BATH. REMOVE NON- PERMITTED CELLAR 3 PC BATH AND GAS PIPING & SINK IN CELLAR. AS PER PLANS.
B01190570-I1
04/02/2025
Special inspection requirement — Post-installed Anchors
TIMOTHY TWEEDY
04/02/2025
Special inspection requirement — Masonry
TIMOTHY TWEEDY
03/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TIMOTHY TWEEDY
03/05/2025
Special inspection requirement — Final
TIMOTHY TWEEDY
03/05/2025
Special inspection requirement — Structural Wood Frame
TIMOTHY TWEEDY
10/03/2024
Violation issued (ECB, open)
Unknown
09/03/2024
Violation issued (ECB, closed)
Boilers
08/30/2024
Violation issued (ECB, closed)
Boilers
08/30/2024
Violation issued (ECB, open)
Construction
08/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2024
Violation issued (ECB, closed)
Construction
08/30/2024
Violation issued (ECB, closed)
Construction
08/29/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedUrena Construction & Design10/09/2026
DOB NOWPlumbingPermit IssuedN and S Plumbing02/18/2026
DOB NOWGeneral ConstructionPermit IssuedJV Fast Construction12/02/2025
BISOTISSUEDVenture Home Solar01/12/2019
1 project · most recent 03/21/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2026Permit IssuedKishan PlumbingGas, Water/Sanitary
1 project · most recent 02/25/2022
General Wiring
FiledStatusContractorScope
02/25/2022Permit IssuedClairmont Electrical ContractingGeneral Wiring
1 project · most recent 03/21/2026
Masonry Wood
FiledStatusContractorScope
03/21/2026Permit IssuedUrena Construction & DesignMasonry, Wood
1 project · most recent 03/21/2026
Fence
FiledStatusContractorScope
03/21/2026Permit IssuedUrena Construction & DesignFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/02/2025Post-installed AnchorsTIMOTHY TWEEDYspecial
04/02/2025MasonryTIMOTHY TWEEDYspecial
03/05/2025Structural Stability – Alterations of existing buildingsTIMOTHY TWEEDYspecial
03/05/2025FinalTIMOTHY TWEEDYprogress
03/05/2025Structural Wood FrameTIMOTHY TWEEDYprogress
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/17/2026B01190570-S1Request digital key ↗
08/17/2026B01190570-S3Request digital key ↗
08/15/2026B01190570-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
01/09/2019340654330Open ↗
▸BISWORK PERMIT APPLICATION1
01/12/2019340654330Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01190570-I1Open ↗
08/17/2026B01190570-S3Open ↗
08/17/2026B01190570-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B01190570-I1Open ↗
08/27/2026B01190570-I1Open ↗
08/27/2026B01190570-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B01190570-I1Open ↗
08/27/2026B01190570-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/09/2019340654330Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
01/09/2019340654330Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026B01190570-S1Open ↗
08/15/2026B01190570-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/09/2019340654330Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
01/09/2019340654330Open ↗
01/09/2019340654330Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/09/2019340654330Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
01/09/2019340654330Open ↗
01/09/2019340654330Open ↗
01/09/2019340654330Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/09/2019340654330Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/09/2019340654330Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/09/2019340654330Open ↗