1899Year Built
2Stories
A9Building Class
R6BZoning
1,800 sfGross Floor Area
1Units
Miscellaneous one family · 2,000 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 233p · 1 filing · 20 docs
Floor 128p · 1 filing · 20 docs
Cellar55p · 1 filing · 20 docs
Basement27p · 1 filing · 20 docs
Site & exterior15p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRAME DESIGN CORPS211/10/2025
UAS INNOVATION IN DESIGN LLC211/04/2024
MA ENGINEERING, P.C.209/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING803/21/2026
STEAM DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FA CONSTRUCTION NY INCGeneral Contractor204/09/2026
DYNAMIC PLBG & SPRKLR CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FRAME DESIGN AND CONSTRUC7971211/10/2025
SKYLINE ENGINEERING, PLLC267311/10/2025
Building Lifecycle
All (71)Filed (6)Permit Issued (3)Signed Off (1)Inspection (5)Objection (32)Special Inspection (24)
11/14/2025
Special inspection requirement — Masonry
Matthew Wavro
11/14/2025
Special inspection requirement — Structural Steel - Details
Matthew Wavro
11/14/2025
Special inspection requirement — Concrete - Cast-In-Place
Matthew Wavro
11/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Matthew Wavro
11/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
11/14/2025
Special inspection requirement — Final
Matthew Wavro
11/14/2025
Special inspection requirement — Post-installed Anchors
11/10/2025
Filed — Alteration CO
Structural Work type in conjunction with General Construction for the cellar door opening
B00842848-P4
11/05/2025
Permit issued — Structural
B00842848-S1-ST
09/23/2025
Special inspection requirement — Post-installed Anchors
SURESH WARREN
09/04/2025
Special inspection requirement — Concrete - Cast-In-Place
SURESH WARREN
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SURESH WARREN
09/04/2025
Special inspection requirement — Masonry
SURESH WARREN
09/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SURESH WARREN
09/04/2025
Special inspection requirement — Structural Steel - Details
Matthew Wavro
09/04/2025
Special inspection requirement — Final
Matthew Wavro
04/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/12/2025
Signed off — Alteration CO
Structural Work type in conjunction with General Construction for the cellar door opening
B00842848-S2
02/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Mohammad Alauddin
11/12/2024
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Alauddin
11/12/2024
Special inspection requirement — Masonry
SURESH WARREN
11/12/2024
Special inspection requirement — Post-installed Anchors
SURESH WARREN
11/12/2024
Special inspection requirement — Concrete - Cast-In-Place
SURESH WARREN
11/12/2024
Special inspection requirement — Subgrade Inspections
SURESH WARREN
11/08/2024
Objection resolved — Addressed
11/07/2024
Objection raised — Admin
11/04/2024
Filed — Alteration CO
Structural Work type in conjunction with General Construction for the cellar door opening
B00842848-P2
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Alauddin
11/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mohammad Alauddin
09/21/2024
Filed — Alteration CO
Structural Work type in conjunction with General Construction for the cellar door opening
B00842848-P1
09/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/20/2024
Special inspection requirement — Energy Code Compliance Inspections
Mohammad Alauddin
09/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Mohammad Alauddin
05/28/2024
Permit issued — Plumbing
B00842848-S2-PL
04/12/2024
Permit issued — General Construction
B00842848-I1-GC
09/09/2023
Objection resolved — Addressed
09/05/2023
Objection resolved — Addressed
09/05/2023
Objection resolved — Addressed
09/05/2023
Objection resolved — Addressed
09/01/2023
Objection raised — Admin
08/28/2023
Objection resolved — Addressed
08/25/2023
Objection resolved — Addressed
08/24/2023
Objection raised — Energy
08/24/2023
Objection raised — Scope
08/21/2023
Objection resolved — Addressed
08/21/2023
Objection resolved — Addressed
08/16/2023
Objection raised — Inspections
08/16/2023
Objection raised — Scope
08/16/2023
Objection raised — Inspections
08/16/2023
Objection raised — Scope
08/16/2023
Objection raised — Scope
08/14/2023
Filed — Alteration CO
Structural Work type in conjunction with General Construction for the cellar door opening
B00842848-S2
05/05/2023
Filed — Alteration CO
Structural Work type in conjunction with General Construction for the cellar door opening
B00842848-S1
04/26/2023
Objection raised — Other
04/26/2023
Objection resolved — Addressed
04/25/2023
Objection raised — Scope
04/25/2023
Objection resolved — Addressed
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedFA CONSTRUCTION NY INC11/05/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS05/28/2024
DOB NOWGeneral ConstructionPermit IssuedFA CONSTRUCTION NY INC04/12/2024
1 project · most recent 11/10/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/10/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
1 project · most recent 05/13/2025
General Wiring
FiledStatusContractorScope
05/13/2025CompleteHI-RITE ELECTRIC CORPGeneral Wiring
1 project · most recent 11/10/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
11/10/2025Permit IssuedFA CONSTRUCTION NY INCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
11/14/2025MasonryMatthew Wavrospecial
11/14/2025Structural Steel - DetailsMatthew Wavrospecial
11/14/2025Concrete - Cast-In-PlaceMatthew Wavrospecial
11/14/2025Structural Stability – Alterations of existing buildingsMatthew Wavrospecial
11/14/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
11/14/2025FinalMatthew Wavroprogress
11/14/2025Post-installed Anchors—special
09/23/2025Post-installed AnchorsSURESH WARRENspecial
09/04/2025Concrete - Cast-In-PlaceSURESH WARRENspecial
09/04/2025Fire-Resistant Penetrations and JointsSURESH WARRENspecial
09/04/2025MasonrySURESH WARRENspecial
09/04/2025Structural Stability – Alterations of existing buildingsSURESH WARRENspecial
09/04/2025Structural Steel - DetailsMatthew Wavrospecial
09/04/2025FinalMatthew Wavroprogress
11/12/2024Fire-Resistance Rated ConstructionMohammad Alauddinprogress
11/12/2024Energy Code Compliance InspectionsMohammad Alauddinprogress
11/12/2024MasonrySURESH WARRENspecial
11/12/2024Post-installed AnchorsSURESH WARRENspecial
11/12/2024Concrete - Cast-In-PlaceSURESH WARRENspecial
11/12/2024Subgrade InspectionsSURESH WARRENspecial
11/04/2024Energy Code Compliance InspectionsMohammad Alauddinprogress
11/04/2024HVAC-R and service water piping design and insulationMohammad Alauddinenergy_progress
09/20/2024Energy Code Compliance InspectionsMohammad Alauddinprogress
09/20/2024HVAC-R and service water piping design and insulationMohammad Alauddinenergy_progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026B00842848-S2Request digital key ↗
08/24/2026B00842848-S1Request digital key ↗
08/24/2026B00842848-P5Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B00842848-I1Open ↗
08/24/2026B00842848-P4Open ↗
08/24/2026B00842848-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00842848-I1Open ↗
08/28/2026B00842848-S2Open ↗
08/28/2026B00842848-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B00842848-P5Open ↗
08/13/2026B00842848-I1Open ↗
08/13/2026B00842848-S2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00842848-I1Open ↗
08/13/2026B00842848-P2Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026B00842848-P5Open ↗
08/13/2026B00842848-S2Open ↗
08/13/2026B00842848-P4Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00842848-S2Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026B00842848-I1Open ↗