HPD04/25/202628 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AND SILL AT BULKHEAD DOOR , 3rd STORY
HPD11/28/2006§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PATERTION ERECTED,CREATING ADDITION ROOM FOR LIVING. IN THE 2nd ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
ECB01/23/2018B101, 50. VIOLATION CONDITION B101 #50-WEIL MCLAIN L6B SERIES Z BOILER INSTALLED W/O A PERMIT. ACQUIRE A PERMIT FOR THE INSTALLATION OF THE NEW BOILER AND SUBMIT A CERTIFICATE OF CORRECTION.Nothing owed — awaiting certificate of correction
ECB01/23/2018B254,15,19,24,32A,34,50,36. VIOLATING CONDITIONS B254 #15 #19 NO COVERON CONTROL #24,#32A,#34,#36 AND #50 NO SPILL SWITCH. CORRECT VIOLATINGCONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTIONN.Nothing owed — awaiting certificate of correction
ECB02/18/2016FAIL TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTE:A LUMBER BUILT SUB-FLOORING @ VESTIBULE RAISED THE SURFACE OF ( )ON (APPL ) CREATING TRIPPING HAZARDOUS CONDITION AT HIGH TRAFFIC AREA.REM:REPAIR AND/OR REPLNothing owed — awaiting certificate of correction
ECB05/04/2005FAILURE TO MAINTAIN BLDG-HAZARDOUS. DEFECT NOTED: DEFECTIVE ROOF COVERING, IS CAUSED THE WATER DAMAGE TO CEILINGS, JOISTS, PLASTER AT 3RD FLOOR APARTMENTS. ALSO NOTED: VERTICAL/HORIZONTAL CRACKS THRUOUT THE BLDNothing owed — awaiting certificate of correction