← Back
BuildNYC
Stand-alone food establishment
795 PENNSYLVANIA AVENUE
BROOKLYN · BIN 3097667
💬 Discuss this project
2000Year Built
1Stories
K5Building Class
M1-1Zoning
2,982 sfGross Floor Area
1Units
0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Stand-alone food establishment · Owner of record: 1940 Linden · 13,473 sf lot · 0.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChipotle Mexican Grill15p · 4 filings · 20 docs
Floor 1Chipotle Mexican Grill33p · 4 filings · 20 docs
Site & exteriorChipotle Mexican Grill9p · 5 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Renaissance Realty Group2407/08/2026
Burger King303/21/2026
Jahn Development Vcorp103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Polaris Consulting Engineers511/14/2025
Ksi Professional Engineers107/06/2022
KZ Engineering106/28/2022
HBC Architects106/27/2022
HC Engineering406/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting1403/21/2026
JP Expedite803/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Custom Commercial ConstructionGeneral Contractor507/08/2026
Hydro MechanicalPlumbing407/08/2026
Signs CadSign hanger307/08/2026
Elemco Testing Co Inc DbaElectrical103/21/2026
Signs Cadspecialty_contractor103/21/2026
Arsenal ScaffoldScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Walter T. Gorman, P.E., P268611/14/2025
Beyond Arch3600106/06/2022
Building Lifecycle
All (68)Filed (12)Permit Issued (9)Signed Off (8)Violation (4)Inspection (5)Special Inspection (30)
12/09/2025
Signed off — Alteration
HEREBY FILING FOR INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00745994-I1
11/17/2025
Special inspection requirement — Mechanical Systems
Abbas Family
11/17/2025
Special inspection requirement — Final
Abbas Family
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Abbas Family
11/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Abbas Family
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Abbas Family
11/17/2025
Special inspection requirement — Maintenance information
Abbas Family
11/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Abbas Family
11/14/2025
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00745994-P3
10/22/2025
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00745994-P2
10/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Abbas Family
10/07/2025
Special inspection requirement — Mechanical Systems
Abbas Family
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Abbas Family
10/07/2025
Special inspection requirement — Final
Abbas Family
10/07/2025
Special inspection requirement — Maintenance information
Abbas Family
10/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Abbas Family
10/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Abbas Family
03/29/2023
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00762192-I1
01/30/2023
Signed off — Alteration
B00745983-I1
01/26/2023
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00745994-P1
01/24/2023
Signed off — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES FOR TENANT FITOUT. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00745995-I1
01/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Abbas Family
01/10/2023
Special inspection requirement — Mechanical Systems
Abbas Family
01/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Abbas Family
01/10/2023
Special inspection requirement — Final
Abbas Family
01/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Abbas Family
01/10/2023
Special inspection requirement — Maintenance information
Abbas Family
01/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Abbas Family
12/05/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/05/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2022
Signed off — Alteration
B00747080-I1
11/09/2022
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A2, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
B00747065-I1
11/09/2022
Signed off — Alteration
INSTALL DRIVE THRU CLEARANCE BAR AND SIGN STRUCTURE AND FOOTING ON THE GROUND
B00747102-I1
11/09/2022
Signed off — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A1, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
B00747036-I1
10/31/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/26/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/02/2022
Permit issued — Plumbing
B00745995-I1-PL
07/20/2022
Permit issued — Mechanical Systems
B00745994-I1-MS
07/20/2022
Permit issued — General Construction
B00745983-I1-GC
07/20/2022
Permit issued — Structural
B00745984-I1-ST
07/06/2022
Filed — Alteration
HEREBY FILING STRUCTURAL WORK IN RELATION TO TENANT INTERIOR AND EXTERIOR ALTERATION TO AN EXISTING SHELL BUILDING. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00745984-I1
06/28/2022
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00762192-I1
06/28/2022
Permit issued — Construction Fence
B00762192-I1-FN
06/27/2022
Filed — Alteration
B00745983-I1
06/24/2022
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF PLUMBING FIXTURES FOR TENANT FITOUT. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00745995-I1
06/16/2022
Filed — Alteration
HEREBY FILING FOR INSTALLATION OF MECHANICAL EQUIPMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00745994-I1
06/07/2022
Permit issued — Structural
B00747102-I1-ST
06/06/2022
Filed — Alteration
B00747080-I1
06/06/2022
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A2, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
B00747065-I1
06/06/2022
Filed — Alteration
INSTALL DRIVE THRU CLEARANCE BAR AND SIGN STRUCTURE AND FOOTING ON THE GROUND
B00747102-I1
06/06/2022
Filed — Alteration
ERECT ILLUMINATED, ACCESSORY BUSINESS CHANNEL LETTER WALL SIGN-A1, INSIDE OF PROPERTY LINE, NO CHANGE TO USE, EGRESS OR OCCUPATION
B00747036-I1
06/06/2022
Permit issued — Sign
B00747036-I1-SG
06/06/2022
Permit issued — Sign
B00747065-I1-SG
06/06/2022
Permit issued — Sign
B00747080-I1-SG
05/27/2022
Special inspection requirement — Concrete - Cast-In-Place
Hackjong Choi
05/27/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Hackjong Choi
05/27/2022
Special inspection requirement — Final
Hackjong Choi
05/27/2022
Special inspection requirement — Final
Hackjong Choi
05/27/2022
Special inspection requirement — Final
Hackjong Choi
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHydro Mechanical08/02/2022
DOB NOWMechanical SystemsSigned-offCustom Commercial Construction07/20/2022
DOB NOWGeneral ConstructionSigned-offCustom Commercial Construction07/20/2022
DOB NOWStructuralSigned-offCustom Commercial Construction07/20/2022
DOB NOWConstruction FenceSigned-offArsenal Scaffold06/28/2022
DOB NOWStructuralSigned-offSigns Cad06/07/2022
DOB NOWSignSigned-offSigns Cad06/06/2022
DOB NOWSignSigned-offSigns Cad06/06/2022
DOB NOWSignSigned-offSigns Cad06/06/2022
BISOTISSUEDGroundwater & Env Services04/26/2010
BISOTRE-ISSUEDNational Maintenance08/28/2001
BIS—ISSUEDParker Service Industries08/27/2001
BIS—ISSUEDParker Service Industries08/27/2001
BIS—ISSUEDParker Service Industries07/11/2001
BIS—ISSUEDParker Service Industries07/11/2001
BIS—ISSUEDParker Service Industries06/29/2001
BISPLISSUEDAgius Plumbing & Heating12/01/2000
BIS—ISSUEDAnc Construction08/23/2000
4 projects · most recent 12/27/2022
General Wiring
FiledStatusContractorScope
12/27/2022CompleteHanison ElectricGeneral Wiring
09/13/2022CompleteSigns Cad—
09/13/2022CompleteSigns Cad—
09/13/2022CompleteSigns Cad—
1 project · most recent 07/06/2022
Steel Concrete
FiledStatusContractorScope
07/06/2022Signed-offCustom Commercial ConstructionSteel, Concrete
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
11/17/2025Mechanical SystemsAbbas Familyspecial
11/17/2025FinalAbbas Familyprogress
11/17/2025Energy Code Compliance InspectionsAbbas Familyprogress
11/17/2025HVAC-R and service water heating equipmentAbbas Familyenergy_progress
11/17/2025HVAC-R and service water piping design and insulationAbbas Familyenergy_progress
11/17/2025Maintenance informationAbbas Familyenergy_progress
11/17/2025HVAC-R and service water heating system controlsAbbas Familyenergy_progress
10/07/2025HVAC-R and service water piping design and insulationAbbas Familyenergy_progress
10/07/2025Mechanical SystemsAbbas Familyspecial
10/07/2025Energy Code Compliance InspectionsAbbas Familyprogress
10/07/2025FinalAbbas Familyprogress
10/07/2025Maintenance informationAbbas Familyenergy_progress
10/07/2025HVAC-R and service water heating equipmentAbbas Familyenergy_progress
10/07/2025HVAC-R and service water heating system controlsAbbas Familyenergy_progress
01/10/2023HVAC-R and service water heating equipmentAbbas Familyenergy_progress
01/10/2023Mechanical SystemsAbbas Familyspecial
01/10/2023Energy Code Compliance InspectionsAbbas Familyprogress
01/10/2023FinalAbbas Familyprogress
01/10/2023HVAC-R and service water heating system controlsAbbas Familyenergy_progress
01/10/2023Maintenance informationAbbas Familyenergy_progress
01/10/2023HVAC-R and service water piping design and insulationAbbas Familyenergy_progress
05/27/2022Concrete - Cast-In-PlaceHackjong Choispecial
05/27/2022Structural Steel - High Strength BoltingHackjong Choispecial
05/27/2022FinalHackjong Choiprogress
05/27/2022FinalHackjong Choiprogress
Latest 25 of 42.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Chipotle Mexican GrillRestaurant / Food ServiceGround, Floor 1, Roof
Project B00745984 Alteration · Permit Entire · 07/06/2022
Project B00745983 Alteration · LOC Issued · 06/27/2022
Project B00745995 Alteration · LOC Issued · 06/24/2022
Project B00745994 Alteration · LOC Issued · 06/16/2022
Project B00747036 Alteration · LOC Issued · 06/06/2022
Project B00747065 Alteration · LOC Issued · 06/06/2022
Project B00747080 Alteration · LOC Issued · 06/06/2022
Project B00747102 Alteration · LOC Issued · 06/06/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/29/2026B00747102-I1Request digital key ↗
08/29/2026B00747036-I1Request digital key ↗
08/29/2026B00747080-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/02/2009320098639Open ↗
▸BISWORK PERMIT APPLICATION1
07/26/2010320098639Open ↗
▸Seals & Professional Certifications55
▸DOB NOWProgress Inspector Seal & Signature30
10/03/2026B00745994-I1Open ↗
10/03/2026B00745994-I1Open ↗
10/03/2026B00745994-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00747036-I1Open ↗
08/29/2026B00747080-I1Open ↗
08/29/2026B00745994-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/03/2026B00745994-I1Open ↗
09/01/2026B00745984-I1Open ↗
09/01/2026B00745984-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/02/2009320098639Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/02/2009320098639Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/29/2026B00745994-I1Open ↗
08/13/2026B00745983-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
12/02/2009320098639Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/02/2009320098639Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/02/2009320098639Open ↗