| Owner | Filings | Most Recent |
|---|---|---|
| RENNON CONSTRUCTION | 6 | 07/08/2026 |
| CEPRINE CONSTRUCTION | 28 | 07/08/2026 |
| SAGA MANAGEMENT GROUP | 9 | 07/08/2026 |
| 22 PIERRE INC | 5 | 03/22/2026 |
| 795 FIFTH AVENUE | 184 | 03/22/2026 |
| METRO BUILDERS 7 RESTORA | 1 | 03/22/2026 |
| 795 FIFTH AVE CORP SANJAY | 4 | 03/22/2026 |
| METRO BUILDERS & RESTORA | 2 | 03/22/2026 |
| 795 5TH AVENUE | 139 | 03/22/2026 |
| PATRIOT LOGISTIC INC DBA | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| KZ ENGINEERING, P.C | 11 | 09/04/2026 |
| SPAR UNLIMITED LLC | 2 | 11/12/2025 |
| MISRA & ASSOCIATES, P.C. | 2 | 11/05/2025 |
| SOLE PROPRIETOR | 1 | 02/21/2025 |
| LEHR ENGINEERING, DPC | 13 | 01/06/2025 |
| ABS ENGINEERING, PLLC | 5 | 10/22/2024 |
| ASHRAF CORP | 6 | 09/05/2024 |
| PINO PAVESE | 2 | 06/11/2024 |
| FZAD | 2 | 11/06/2023 |
| GMH ARCHITECTURE PLLC | 3 | 10/16/2023 |
| CES ENGINEERING LLC | 6 | 09/12/2023 |
| ROBERT SILMAN ASSOC STRUCT ENG DPC | 1 | 09/11/2023 |
| LUKE LICALZI, P.E., P.C. | 2 | 09/08/2023 |
| MR ARCHITECTURE & DECOR | 1 | 06/07/2023 |
| THOMAS TSUE ARCHITECT | 2 | 06/07/2022 |
| DESIMONE CONSULTING ENGINEERING | 2 | 04/12/2022 |
| PACE ENGINEERING P.C. | 1 | 04/22/2021 |
| RYAN SOAMES ENGINEERING | 4 | 06/11/2020 |
| COMPREHENSIVE ENGINEERING | 1 | 03/26/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| SYNERGY BUILDING CONSULTANTS | 6 | 03/21/2026 |
| LLOYD NOEL BUILDING CONSULTANT | 2 | 03/21/2026 |
| OMNI CONSULTING GROUP | 2 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 32 | 03/21/2026 |
| DVA Advisors | 3 | 03/21/2026 |
| EAST COAST EXPEDITING | 8 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 14 | 03/21/2026 |
| QUICK FILING OF NY INC | 2 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 2 | 03/21/2026 |
| Rigid Structural Design, LLC | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CEPRINE CONSTRUCTION INC | General Contractor | 29 | 09/01/2026 |
| DYNAMIC US, INC | General Contractor | 11 | 07/08/2026 |
| ARISTA AIR CONDITIONING CORP | General Contractor | 8 | 07/08/2026 |
| ADS CONSTRUCTION CORP | General Contractor | 7 | 07/08/2026 |
| LEVINE, GEORGE | Fire Protection | 7 | 03/21/2026 |
| ACM CONSULTING CORP | General Contractor | 6 | 03/21/2026 |
| SDC LLC | General Contractor | 5 | 07/08/2026 |
| NIGHT HAWK PLMBNG & HTNG | Plumbing | 5 | 07/08/2026 |
| CITY/SUBURBAN PLBG CORP | Plumbing | 5 | 07/08/2026 |
| DYNAMIC CONTRACTING CORP | Plumbing | 4 | 07/08/2026 |
| THE I. GRACE COMPANY COMM | General Contractor | 3 | 07/08/2026 |
| CERINA GENERAL CONTR INC | General Contractor | 2 | 09/09/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 2 | 07/08/2026 |
| RENNON CONSTRUCTION CORP | General Contractor | 2 | 07/08/2026 |
| STREAMLINE USA LLC | General Contractor | 2 | 07/08/2026 |
| NATIONWIDE MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| STEPHEN ROSTOWSKY | Electrical | 1 | 03/21/2026 |
| LOSMAN PLBG AND HTG INC | Plumbing | 1 | 07/08/2026 |
| RESOLUTE NY LLC | General Contractor | 1 | 07/08/2026 |
| SAGA MANAGEMENT GROUP INC | General Contractor | 1 | 07/08/2026 |
| SINCHRONY ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| MOSKOWITZ STUART | Electrical | 1 | 03/21/2026 |
| SCHUERGER, J | Electrical | 1 | 03/21/2026 |
| TITAN CONSTRUCTION SERVIC | General Contractor | 1 | 04/11/2026 |
| ADVANCED PLUMBING MECH | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| KZ ENGINEERING, P.C. | 4665 | 7 | 09/04/2026 |
| SPAR UNLIMITED LLC | 5967 | 2 | 06/26/2026 |
| SAG ENGINEERING & CONSULT | 608 | 1 | 11/12/2025 |
| PIRO STUDIO LLC | 7503 | 1 | 02/21/2025 |
| RYAN SPECIAL ENGINEERING | 2018 | 14 | 01/06/2025 |
| ABS ENGINEERING, PLLC | 4835 | 6 | 10/22/2024 |
| CROSSCHECK INSPECTION SER | 544 | 1 | 06/11/2024 |
| GM HUANG ARCHITECTURE PLL | 1398 | 2 | 10/16/2023 |
| JON LIBASCI | 3068 | 4 | 09/12/2023 |
| CES ENGINEERING LLC | 1277 | 1 | 09/12/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CERINA GENERAL CONTR INC | 09/08/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 08/31/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 06/01/2026 |
| DOB NOW | Construction Fence | Permit Issued | CEPRINE CONSTRUCTION INC | 06/01/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN CONSTRUCTION SERVIC | 03/31/2026 |
| DOB NOW | General Construction | Permit Issued | CERINA GENERAL CONTR INC | 03/09/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 01/29/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CEPRINE CONSTRUCTION INC | 01/08/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CEPRINE CONSTRUCTION INC | 01/08/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | CEPRINE CONSTRUCTION INC | 12/15/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | CEPRINE CONSTRUCTION INC | 12/09/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | CERINA GENERAL CONTR. INC | 10/17/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | BK CONSTRUCTION SVCS INC | 04/30/2025 |
| DOB NOW | Plumbing | Signed-off | CITY/SUBURBAN PLBG CORP | 04/28/2025 |
| DOB NOW | General Construction | Signed-off | RESOLUTE NY LLC | 04/07/2025 |
| DOB NOW | Plumbing | Permit Issued | NIGHT HAWK PLMBNG & HTNG | 03/04/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 02/12/2025 |
| DOB NOW | Plumbing | Permit Issued | NIGHT HAWK PLMBNG & HTNG | 01/17/2025 |
| DOB NOW | General Construction | Signed-off | SDC LLC | 11/15/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ARISTA AIR CONDITIONING C | 11/07/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ARISTA AIR CONDITIONING C | 10/24/2024 |
| DOB NOW | Supported Scaffold | Permit Issued | RENNON CONSTRUCTION CORP | 10/23/2024 |
| DOB NOW | General Construction | Signed-off | ACM CONSULTING CORP | 08/30/2024 |
| DOB NOW | Plumbing | Signed-off | CITY/SUBURBAN PLBG CORP | 04/19/2024 |
| DOB NOW | Boiler Equipment | Signed-off | CHAMPION COMBUSTION CORP | 04/03/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 02/13/2024 |
| DOB NOW | Plumbing | Permit Issued | NIGHT HAWK PLMBNG & HTNG | 01/19/2024 |
| DOB NOW | Mechanical Systems | Signed-off | ARISTA AIR CONDITIONING C | 12/27/2023 |
| DOB NOW | Suspended Scaffold | Permit Issued | RENNON CONSTRUCTION CORP | 12/05/2023 |
| DOB NOW | General Construction | Signed-off | SDC LLC | 11/14/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | RENNON CONSTRUCTION CORP | 11/08/2023 |
| DOB NOW | Mechanical Systems | Signed-off | DYNAMIC US, INC | 09/11/2023 |
| DOB NOW | General Construction | Signed-off | THE I. GRACE COMPANY COMM | 09/05/2023 |
| DOB NOW | Mechanical Systems | Signed-off | THE I. GRACE COMPANY COMM | 09/05/2023 |
| DOB NOW | Plumbing | Signed-off | FORTE EXPRESS P & H INC | 08/23/2023 |
| DOB NOW | General Construction | Permit Issued | ADS CONSTRUCTION CORP | 08/22/2023 |
| DOB NOW | General Construction | Permit Issued | ADS CONSTRUCTION CORP | 08/22/2023 |
| DOB NOW | General Construction | Signed-off | ACM CONSULTING CORP | 05/05/2023 |
| DOB NOW | Plumbing | Permit Issued | NIGHT HAWK PLMBNG & HTNG | 03/10/2023 |
| DOB NOW | Sidewalk Shed | Permit Issued | CEPRINE CONSTRUCTION INC | 02/21/2023 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/12/2023 | Permit Issued | ADS CONSTRUCTION CORP | Heating and Air Conditioning Systems | Heat / Cool |
| 06/11/2020 | — | — | Air Conditioning Systems, Ventilation Systems | Cooling Islandaire EZ15AAKFG2C4 14,000 BTU · Ptac ×3 Ventilation Greenheck SP-B110 100 CFM · Exhaust Fan ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/02/2024 | Permit Issued | CMA PLUMBING & HEATING IN | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/05/2025 | — | — | Water/Sanitary |
| 11/06/2023 | Permit Issued | NIGHT HAWK PLMBNG & HTNG | Gas, Water/Sanitary |
| 09/12/2023 | — | — | Water/Sanitary |
| 06/11/2020 | Signed-off | MCLNY PLBG & HEATING LLC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/05/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 04/30/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 09/29/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 06/30/2025 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| 06/30/2025 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| 06/30/2025 | Permit Issued | ALLIANCE ELEVATOR COMPANY | — |
| 03/05/2025 | Complete | AMSTERDAM ELECTRIC CORP | General Wiring |
| 10/31/2024 | Complete | THE METRO GROUP ELECTRIC | General Wiring |
| 04/08/2024 | Permit Issued | DYNAMIC ELEC. SYSTEM INC | General Wiring |
| 04/08/2024 | Complete | DYNAMIC ELEC. SYSTEM INC | General Wiring |
| 03/01/2024 | Complete | DELTA PHASE ELEC'L CORP. | — |
| 11/21/2023 | Complete | NEE ELECTRICAL, LLC | General Wiring |
| 07/13/2023 | Permit Issued | DYNAMIC ELEC. SYSTEM INC | General Wiring |
| 03/29/2023 | Complete | ACM ELECTRIC CORPORATION | General Wiring |
| 03/27/2023 | Permit Issued | KOBRYN ELEC'L SERVICES IN | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/04/2026 | Permit Issued | CERINA GENERAL CONTR INC | Steel |
| 09/11/2023 | Permit Issued | ADS CONSTRUCTION CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/02/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Fence |
| 06/01/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Sidewalk Shed |
| 05/28/2026 | Permit Issued | CEPRINE CONSTRUCTION INC | Scaffold |
| 09/05/2024 | Permit Issued | CEPRINE CONSTRUCTION INC | Sidewalk Shed |
| 11/07/2023 | Permit Issued | BK CONSTRUCTION SVCS INC | Scaffold |
| 03/26/2019 | — | — | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/04/2026 | Permit Issued | CERINA GENERAL CONTR INC | Tenant Protection Plan 72 Hour |
| 06/02/2026 | Permit Issued | CERINA GENERAL CONTR. INC | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/02/2026 | Permit Issued | CERINA GENERAL CONTR. INC | Suspended Scaffold (SC) |
| 11/29/2023 | Permit Issued | — | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/10/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/17/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/07/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 06/16/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/04/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/10/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/03/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 10/17/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/28/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/12/2024 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 01/30/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/21/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/01/2023 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 09/28/2023 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 04/26/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/17/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/29/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/28/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/04/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/25/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/10/2026 | Post-installed Anchors | Karol Zdancewicz | special |
| 06/10/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Karol Zdancewicz | special |
| 06/10/2026 | Post-installed Anchors | Karol Zdancewicz | special |
| 05/20/2026 | Final | Karol Zdancewicz | progress |
| 05/20/2026 | Tenant Protection Plan Compliance | SCOTT PROFETA | special |
| 05/20/2026 | Post-installed Anchors | Karol Zdancewicz | special |
| 12/05/2025 | Post-installed Anchors | Karol Zdancewicz | special |
| 12/05/2025 | Post-installed Anchors | Karol Zdancewicz | special |
| 11/05/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 10/03/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 10/03/2025 | Final | — | progress |
| 10/03/2025 | Fire-Resistance Rated Construction | — | progress |
| 02/12/2025 | Final | KRISTEN ABRUZZESE | progress |
| 02/12/2025 | Fire-Resistant Penetrations and Joints | PIETRO ROSATO | special |
| 01/30/2025 | Fuel-Oil Storage and Fuel-Oil Piping Systems | William Ryan | special |
| 01/30/2025 | Tenant Protection Plan Compliance | — | special |
| 12/11/2024 | Tenant Protection Plan Compliance | — | special |
| 12/10/2024 | Fuel-Oil Storage and Fuel-Oil Piping Systems | William Ryan | special |
| 11/25/2024 | Fire-Resistant Penetrations and Joints | Alex Schwartz | special |
| 11/25/2024 | Maintenance information | Alex Schwartz | energy_progress |
| 11/25/2024 | Post-installed Anchors | Alex Schwartz | special |
| 11/25/2024 | HVAC-R and service water piping design and insulation | Alex Schwartz | energy_progress |
| 11/25/2024 | Energy Code Compliance Inspections | Alex Schwartz | progress |
| 10/22/2024 | Tenant Protection Plan Compliance | — | special |
| 10/18/2024 | HVAC-R and service water piping design and insulation | Alex Schwartz | energy_progress |