| Firm | Filings | Most Recent |
|---|---|---|
| SANNA & LOCCISANO ARCHITECTS, P.C. | 9 | 10/16/2023 |
| JAMES V MORRI | 1 | 09/16/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| SANNA LOCCISANO ARCHITECTS P C | 18 | 03/21/2026 |
| JAMES V MORRI, RA | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PISILI INC | General Contractor | 9 | 07/08/2026 |
| STATEN ISLAND MECH LLC | Plumbing | 2 | 07/08/2026 |
| CECO ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| A TECH ENGINEERING NYC, P | 6738 | 7 | 10/16/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Curb Cut | Signed-off | PISILI INC | 03/23/2023 |
| DOB NOW | Plumbing | Signed-off | STATEN ISLAND MECH LLC | 02/01/2023 |
| DOB NOW | Structural | Permit Issued | PISILI INC | 02/01/2022 |
| DOB NOW | Plumbing | Signed-off | STATEN ISLAND MECH LLC | 10/28/2021 |
| DOB NOW | Mechanical Systems | Permit Issued | PISILI INC | 10/18/2021 |
| DOB NOW | Construction Fence | Signed-off | PISILI INC | 08/10/2021 |
| DOB NOW | Construction Fence | Signed-off | PISILI INC | 09/24/2019 |
| BIS | — | ISSUED | PISILI INC | 09/24/2019 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/16/2023 | Permit Issued | PISILI INC | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Carrier FXM4X1800A1 1 tons · Ahu ×3 R4A318GH100. FOR CELLAR FLOOR 1 tons · Condensing Unit ×3 R4A318GKH100. FOR SECOND FLOOR AND MEZZANINE. 1 tons · Condensing Unit ×3 Heil N4A324LKA101. FOR FIRST FLOOR 2 tons · Condensing Unit ×3 Heating Nti TFTN 285 285,000 BTU · Exhaust Fan ×3 Velocity MEGA-STOR 2-50 GALLONS 121,000 BTU · Boiler ×3 Ventilation Fantech ATMO 150E 160 CFM · Erv ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2022 | Complete | CECO ELECTRIC INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2023 | Permit Issued | PISILI INC | Steel, Concrete, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2023 | Permit Issued | PISILI INC | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/13/2023 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 05/10/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/09/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/27/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/24/2022 | Pass-Final PL - Underground | Pass | View ↗ |
| 12/07/2021 | Pass-Final PL - Underground | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/31/2023 | Air barrier — testing | anthony santoro | energy_progress |
| 10/31/2023 | Maintenance information | anthony santoro | energy_progress |
| 10/31/2023 | Fireplaces | anthony santoro | energy_progress |
| 10/31/2023 | Interior lighting power | anthony santoro | energy_progress |
| 10/31/2023 | Ventilation and air distribution system | anthony santoro | energy_progress |
| 10/31/2023 | HVAC-R and service water piping design and insulation | anthony santoro | energy_progress |
| 10/31/2023 | HVAC-R and service water heating equipment | anthony santoro | energy_progress |
| 10/31/2023 | Fenestration air leakage | anthony santoro | energy_progress |
| 10/31/2023 | Fire-Resistant Penetrations and Joints | anthony santoro | special |
| 10/31/2023 | Concrete - Cast-In-Place | anthony santoro | special |
| 10/31/2023 | Structural Steel - Details | anthony santoro | special |
| 10/31/2023 | Mechanical Systems | anthony santoro | special |
| 10/31/2023 | Structural Steel - High Strength Bolting | anthony santoro | special |
| 10/31/2023 | Excavations - Sheeting, Shoring, and Bracing | anthony santoro | special |
| 10/31/2023 | Subgrade Inspections | anthony santoro | special |
| 10/31/2023 | Structural Steel - Welding | anthony santoro | special |
| 10/31/2023 | Exterior Insulation and Finish Systems (EIFS) | anthony santoro | special |
| 10/31/2023 | Wood – Prefabricated I-Joists | anthony santoro | special |
| 10/31/2023 | Final | anthony santoro | progress |
| 10/31/2023 | Footing and Foundation | anthony santoro | progress |
| 10/31/2023 | Energy Code Compliance Inspections | anthony santoro | progress |
| 10/31/2023 | Fire-Resistance Rated Construction | anthony santoro | progress |
| 10/31/2023 | Structural Wood Frame | anthony santoro | progress |
| 10/31/2023 | HVAC-R and service water heating system controls | anthony santoro | energy_progress |
| 10/31/2023 | Duct leakage testing, insulation and design | anthony santoro | energy_progress |